Decision The Committee Members unanimously ENDORSED the Officer’s recommendation that a Breach of Condition be served to require the developer to rectify the breaches of conditions 21, 33 and 34 listed in the report in order to ensure that the development is safe from flooding and outstanding planting is undertaken. However, on the proviso there was consultation with the residents of the development in connection with the proposed landscaping at the front and rear of the site.
Word for word from the decision Adur & Worthing published for this meeting.Source: democracy.adur-worthing.gov.uk
1.1Mariners Point is a mixed residential/commercial development on Brighton Road, adjacent to the Sussex Yacht Club and the River Adur. Permission was granted in 2012 for the demolition of the former Parcelforce warehouse on the site and the construction of a 5-7 storey building with 132 dwellings (Use Class C3) (comprising 32 x 1-bed flats, 87 x 2-bed flats and 13 x 3-bed flats of which 27% are affordable units), a 1265sqm foodstore (Use Class A1) and 121sqm of ancillary commercial floorspace (Use Classes A1, A2, A3, A5 and B1) with 150 parking spaces plus cycle spaces at basement level and at the front of the site, new vehicular access to serve the foodstore from Brighton Road, access to residential units via Surry Hard, improvements to the existing river wall, public hard and boathouse and new landscaping (AWDM/0501/12).
1.2The development is now nearing completion and many of the flats are occupied. The foodstore is not likely to be provided now and alternative occupiers are being sought, including a dental surgery across half of the ground floor (current application AWDM/0801/21 refers).
1.3Following occupation of the development a number of residents contacted the Council to complain about a number of issues and concerns, predominantly relating to the adequacy of the flood defence works, quality of build and poor quality of landscaping. Following those complaints, the Environment Agency visited the site and noted a number of issues with the design of flood defence measures installed at the site which required urgent attention. A subsequent meeting was arranged on site on the 10th June 2021 between the EA, Planning Officers and the developer to seek to address the various defects identified. This report sets out the various breaches identified and recommends enforcement action is taken to ensure that the required works are undertaken within an appropriate timescale to ensure a robust flood defence is in place to protect existing and future residents.
2. FLOOD DEFENCES
2.1The permission was granted subject to a number of conditions, of which the following are relevant in this case (numbers 21, 33 and 34 set out below):
Prior to the commencement of development, details of the replacement river wall, the floor level of the proposed building and alterations to the ground levels of the site shall be submitted to and approved in writing by the Local Planning Authority and the development shall be carried out in strict accordance with such details as approved and no occupation of the buildings shall take place until the approved works have been completed.
Reason: In the interests of amenity, the environment and flood risk avoidance, having regard to saved policy AG1 of the Adur District Local Plan and the policies of the National Planning Policy Framework
The development hereby approved shall be carried out in accordance with the approved Flood Risk Assessment (FRA) ref:42285 Issue 3, dated December 2012, and the following mitigation measures detailed within the FRA:-
1) Finished floor levels of residential units are set no lower than 5.57m above Ordnance datum (AOD).
2) A scheme for managing surface water, including arrangements for the storage of surface water during periods when the system may be tide locked.
Reason: To reduce the risk of flooding to the proposed development and future occupants in accordance with the principles of the National Planning Policy Framework.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.