CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Mar19Thursday

Policy and Resources Committee

Argyll and ButeHeldPapers from www.argyll-bute.gov.uk
Thursday 19 March 2015, 11.00amHeld 4266 days ago.
COUNCIL CHAMBERKILMORY, LOCHGILPHEAD. Open to the public except for exempt items.
35 items, 24 papersAbout 11 MB, led by FINANCIAL MONITORING PACK AS AT 31 JANUARY 2015.
1 item with exempt partsThe Committee may be taken in private.
This meeting was held19 March 2015
35items
24papers
20decisions
1exempt
Running order, sized by papersItem 1 to 35
ReportsProcedureExempt parts

The agenda, item by item

What the committee will consider, in order, with every paper attached to its item.

1
Procedure

The Chair ruled, and the Committee agreed, to consider an

urgent recommendation from Bute and Cowal Area Committee in respect of the refurbishment of Castle Lodge Gate House as Capital Funding may be required which would require a recommendation from the Policy and Resources Committee to the April Council meeting when the Capital Programme will be considered. This report is dealt with at item 17 of this Minute. The Chair ruled, and the Committee agreed, to consider...

1
Procedure

APOLOGIES FOR ABSENCE

2
Procedure

DECLARATIONS OF INTEREST

4
Report

FINANCIAL MONITORING PACK AS AT 31 JANUARY 2015

Reports by Head of Strategic Finance Revenue Budget Monitoring Report as at 31 January 2015 Monitoring of 1% Savings for 2014-15 and 2015-16 Monitoring of Financial Risks Reserves and Balances Capital Plan Monitoring Report as at 31 January 2015 Treasury Monitoring Report as at 31 January 2015

Decision: Decision The Committee noted the – 1. R evenue budget monitoring report as at 31 January 2015 2. Progress towards the 1% savings target for 2014-15 and 2015-16 and approved the policy option referenced EDUC07. 3. Current assessment of the Council’s financial risks. 4. Overall level of reserves and balances and note the monitoring of the earmarked reserves. 5. Change in profiles as noted in paragraphs 3.3.6 to 3.3.11 in the reserves and balances report. 6. Capital plan monitoring report as at 31... Decision page

1 paper, 4.5 MBSearch inside with Pro
ReportFINANCIAL MONITORING PACK AS AT 31 JANUARY 20154.5 MBDownload
5
Report

PERFORMANCE REPORT FQ3 2014-15

Report by Executive Director – Customer Services

Decision: Decision The Committee noted the performance information for financial quarter 3 2014/15. (Reference: Report by Executive Director – Customer Services dated March 2015; Financial Quarter 3 Performance Report and Scorecard – Customer Services; and Financial Quarter 3 Performance Report and Scorecard – Strategic Finance) Decision page

1 paper, 468 KBSearch inside with Pro
ReportPERFORMANCE REPORT FQ3 2014-15468 KBDownload
6
Report

ARGYLL AND BUTE COUNCIL EQUALITIES MAINSTREAMING REPORT AND PROGRESS ON EQUALITY OUTCOMES 2015

Report by Executive Director – Customer Services

Decision: Decision The Committee – 1. Noted that the content of the report meets the requirement of the Act. 2. Noted the positive progress being made by the Council to deliver on the Equality Outcomes. 3. Noted that the Council operates an equal pay environment. (Reference: Report by Executive Director – Customer Services dated March 2015, submitted) * Decision page

2 papers, 2.3 MBSearch inside with Pro
ReportARGYLL AND BUTE COUNCIL EQUALITIES MAINSTREAMING REPORT AND PROGRESS ON EQUALITY OUTCOMES 2015154 KBDownload
ReportEqualities Mainstreaming Report 2015 v3 final2.2 MBDownload
7
Report

REVISED REDUNDANCY POLICY AND PROCEDURES

Report by Executive Director – Customer Services

Decision: Decision The Committee – 1. Noted the rationale for amending the Policy. 2. Noted that the revised Policy has been discussed with the Trade Unions. 3. Approved the revised Policy. 4. Referred the Policy to Council for noting the revisions. Having moved an Amendment which failed to find a seconder, Councillor James Robb required his dissent from the foregoing decision to be recorded. (Reference: Report by Executive Director – Customer Services dated February 2015, submitted) Decision page

2 papers, 180 KBSearch inside with Pro
ReportREVISED REDUNDANCY POLICY AND PROCEDURES65 KBDownload
ReportRedundancy Policy and procedure version 2 June 2014115 KBDownload
8
Report

INFORMATION MANAGEMENT STRATEGY

Report by Executive Director – Customer Services

Decision: Decision The Committee approved the draft Information Management Strategy for Argyll and Bute Council. (Reference: Report by Executive Director – Customer Services dated 5 February 2015, submitted) Decision page

2 papers, 306 KBSearch inside with Pro
ReportArgyll and Bute Information Management Strategy V1.3242 KBDownload
ReportINFORMATION MANAGEMENT STRATEGY64 KBDownload
9
Report

2015 - 2019 CUSTOMER SERVICE STRATEGY

Report by Executive Director – Customer Services

Decision: Decision 1. Noted the results of the customer consultation attached at Appendix 1 to the report by the Executive Director. 2. Considered the draft 2015-2019 Customer Service Strategy including revised Customer Service Charter and associated action plan attached at Appendix 2 to the report by the Executive Director and approved this. 3. Approved the outline business case for replacement customer contact systems attached at Appendix 3 to the report by the Executive Director and associated revenue... Decision page

4 papers, 978 KBSearch inside with Pro
Report2015: 2019 CUSTOMER SERVICE STRATEGY114 KBDownload
AppendixCS Strategy 2015-19 v 1.1 Appendix 2 P&R Mar 2015306 KBDownload
AppendixCS Strategy Appendix 1 P&R Feb 2015322 KBDownload
AppendixCS Strategy Appendix 3 (OBC 2.2) P&R Mar 2015236 KBDownload
10
Report

SCOTTISH GOVERNMENT FUNDING FOR WELFARE REFORM AND DISCRETIONARY HOUSING PAYMENTS - REPORT ON SPEND TO DATE AND FUTURE PROPOSALS

Report by Executive Director – Customer Services

Decision: Decision The Committee – 1. Noted the information provided in respect of progress made, and the estimate of projected expenditure to 31 March 2015 of £138.7k from the balance of Scottish Government funding for DHPs of £550,390 received in March 2014. 2. Approved the continued carry forward of the balance of this as earmarked funds estimated at £411.7k and approved the proposals for their use as summarised at paragraph 4.20 of the report by the Executive Director. 3. Approved the carry forward... Decision page

1 paper, 103 KBSearch inside with Pro
ReportSCOTTISH GOVERNMENT FUNDING FOR WELFARE REFORM AND DISCRETIONARY HOUSING PAYMENTS: REPORT ON SPEND TO DATE AND FUTURE PROPOSALS103 KBDownload
12
Procedure

Having previously declared an interest in the following item,

Councillor Alistair MacDougall left the room.

11
Report

COUNCIL TAX ON EMPTY PROPERTIES

View the declarations of interest for item 11. Report by Executive Director – Customer Services

Decision: Decision The Committee – 1. Noted the decision by the Valuation Appeal Committee on 10 December 2014 attached at Appendix 1 to the report by the Executive Director. 2. Approved an amendment to the policy for charging double council tax on long term empty properties so that where major repairs are underway which require planning permission and/or building warrant, the double charge is only applied after a property has been empty for 2 years. (Reference: Report by Executive Director – Customer... Decision page

1 paper, 200 KBSearch inside with Pro
ReportCOUNCIL TAX ON EMPTY PROPERTIES200 KBDownload
14
Procedure

Councillor MacDougall returned to the meeting.

12
Report

COUNTER FRAUD TEAM - BUSINESS CASE

Report by Executive Director – Customer Services

Decision: Decision 1. Noted the residual responsibilities for preventing and detecting fraud following the transfer to Single Fraud Investigation Service. 2. Approved the formation of a new Counter Fraud Investigation Team from 1 October 2015 within existing budgetary resources. (Reference: Report by Executive Director – Customer Services dated 5 February 2015, submitted) Decision page

1 paper, 180 KBSearch inside with Pro
ReportCOUNTER FRAUD TEAM: BUSINESS CASE180 KBDownload
13
Report

DIRECT PAYMENTS POLICY AND PROCEDURAL GUIDANCE FOR STAFF AND MANAGERS 2014

Report by Executive Director – Community Services

Decision: Decision The Committee approved the changes to the Direct Payment Policy and Procedures which reflected new regulations. (Reference: Report by Executive Director – Community Services dated 14 October 2014, submitted) Decision page

2 papers, 852 KBSearch inside with Pro
ReportDIRECT PAYMENTS POLICY AND PROCEDURAL GUIDANCE FOR STAFF AND MANAGERS 201482 KBDownload
AppendixDP Policy and Guidance: App 1770 KBDownload
14
Report

MEMBERSHIP OF THE PROPOSED SCOTTISH LOCAL AUTHORITY BUSINESS LOAN FUND

Report by Executive Director – Development and Infrastructure Services

Decision: Decision The Committee – 1. Endorsed the proposal to join the Scottish Local Authority Business Loan Fund. 2. Confirmed approval for Argyll and Bute’s allocation of funds within the West of Scotland Loan Fund (currently £183,702) to be transferred to the Scottish Local Authority Business Loan Fund. 3. Endorsed the estimated demand for loans over the initial three year period at £300k. (Reference: Report by Executive Director – Development and Infrastructure Services dated March 2015, submitted) Decision page

1 paper, 107 KBSearch inside with Pro
ReportMEMBERSHIP OF THE PROPOSED SCOTTISH LOCAL AUTHORITY BUSINESS LOAN FUND107 KBDownload
15
Procedure

ASSESSMENT PROCESS FOR ADDITIONAL FUNDING REQUESTED AS PART OF REVENUE BUDGET 2015/16

15a
Report

Assessment Process for Additional Funding

Report by Head of Strategic Finance

Decision: Decision The Committee – 1. Agreed the proposed process for assessing ad hoc funding requests subject to the first sentence of paragraph 11 of Appendix 1 to the report being amended to read “SMT submit report in the political process reporting through Policy Leads and to the Policy and Resources Committee for a decision. 2. Agreed that should any of these funding requests be agreed following assessment that the Committee identify how the cost can be contained within available resources to avoid... Decision page

ReportAssessment Process for Additional Funding80 KBDownload
15b
Report

Assessment of External Financial Request - Kilmartin Museum

View the declarations of interest for item 15b Report by Executive Director – Development and Infrastructure Services (Copies of the Business Case will be made available for Elected Members’ perusal in the Members Room)

Decision: Decision The Committee – 1. Noted the assessment of the project and associated business plan by Officers. 2. Agreed to support in principle the request for a maximum of £400,000 subject to i. A successful stage 1 application to HLF ii. A further detailed assessment of the Full Business Case as set out in the report entitled “Request for Grant Funding” also before this Committee, in advance of the stage 2 submission to HLF and that this business case fully meets the Council’s own criteria iii.... Decision page

1 paper, 121 KBSearch inside with Pro
ReportAssessment of External Financial Request: Kilmartin Museum121 KBDownload
21
Procedure

Councillor Vivien Dance left the meeting at this point.

16
Report

POLICY AND RESOURCES COMMITTEE WORKPLAN

Report by Executive Director – Customer Services

Decision: Decision Noted the outline work plan and agreed that the frequency of when the Financial Reporting packs are brought to the Committee should be reviewed. (Reference: Report by Executive Director – Customer Services dated March 2015, submitted) Decision page

ReportPOLICY AND RESOURCES COMMITTEE WORKPLAN64 KBDownload
23
Procedure

Councillor Rory Colville left the meeting at this point.

17
Report

CASTLE LODGE GATE HOUSE

Decision: Decision Agreed to refer this proposal for consideration by Council in April as part of the Capital Budget setting process and noted that the Executive Director – Development and Infrastructure will draw up costs for this Project to feed into the Capital Programme process. (Reference: Extract from Minutes of Bute and Cowal Area Committee of 3 February 2015, tabled) Decision page

ReportCASTLE LODGE GATE HOUSE61 KBDownload
25
Procedure

Councillor Elaine Robertson left the meeting at this point.

18
Report

LORN ARC TAX INCREMENTAL FINANCING (TIF) ASSET PROJECT 1 - LORN ROAD/KIRK ROAD IMPROVEMENTS - DUNBEG START UP REPORT

Decision: Decision The Committee – 1. Approved the drawdown of borrowing for a total of £238,100 for the development of a Full Business Case for Lorn Arc Project 1 – Lorn Road/Kirk Road Improvements at Dunbeg noting that these resources will be held in a defined budget and managed as detailed in the Lorn Arc Programme PID. 2. Noted the Full Business Case for Project 1 will be reported to a future Oban, Lorn and the Isles Area Committee and subsequent Policy and Resources Committee before moving to the...

ReportProject 1 Lorn Road Kirk Road Dunbeg start up P & R committee report 23-02-15 v2.183 KBDownload
27
Exempt parts

The Committee

resolved in terms of Section 50(A)(4) of the Local Government (Scotland) Act 1973 to exclude the public for the following 4 items of business on the grounds that they were likely to involve the disclosure of exempt information as defined in Paragraphs 8; 8; 8 and 9; and 6 respectively of Part 1 of Schedule 7A to the Local Government (Scotland) Act 1973. E2

19
Procedure

MAJOR CAPITAL REGENERATION PROJECTS - UPDATE REPORT AS AT 20 FEBRUARY 2015

Report by Executive Director – Development and Infrastructure Services

Decision: Decision The Committee – 1. Noted the current progress and agreed allocation of budget resources to date against each of the major capital regeneration projects. 2. Instructed Officers to bring progress reports to the Policy and Resources Committee on a quarterly basis. 3. Approved the Business Case (Interim Use) for Phase 1 works in respect of the Wooden Pier and the draw down of the remaining element of Argyll and Bute Council capital funds from the projects budget. 4. Agreed the terms of...

20
Procedure

NEW SCHOOLS REDEVELOPMENT PROJECT- CAMPBELTOWN, OBAN, KIRN, DUNOON

Report by Executive Director – Community Services (A3 copies of the associated appendices will be available for Elected Members’ perusal in the Members Room. Members may also request a copy to be emailed to them on a confidential basis through Committee Services)

Decision: Decision The Committee agreed the recommendations detailed in both reports. (Reference: Report by Executive Director – Community Services dated 23 February 2015, submitted and Report by Executive Director – Community Services dated 19 March 2015, tabled) E4

21
Procedure

HELENSBURGH OFFICE PROJECT UPDATE

Report by Executive Director – Customer Services

Decision: Decision The Committee agreed the recommendations detailed in the report. (Reference: Report by Executive Director – Customer Services dated 11 February 2015, submitted) E5

22
Procedure

COASTAL EROSION AT FURNACE

Report by Executive Director – Development and Infrastructure Services

Decision: Decision The Committee agreed the recommendations detailed in the report. (Reference: Joint report by Executive Director – Community Services and Executive Director – Development and Infrastructure Services dated January 2015, submitted)

32
Procedure

E1&E4 Paragraph 8 The amount of any expenditure proposed

E1&E4 Paragraph 8 The amount of any expenditure proposed to be incurred by the authority under any particular contract for the acquisition of property or the supply of goods or services.

33
Procedure

Paragraph 9 Any terms proposed or to be proposed by

Paragraph 9 Any terms proposed or to be proposed by or to the authority in the course of negotiations for a contract for the acquisition or disposal of property or the supply of goods or services.

34
Procedure

E2&E3 Paragraph 8 The amount of any expenditure proposed

E2&E3 Paragraph 8 The amount of any expenditure proposed to be incurred by the authority under any particular contract for the acquisition of property or the supply of goods or services.

35
Procedure

E5 Paragraph 6 Information relating to the financial

E5 Paragraph 6 Information relating to the financial or business affairs of any particular person (other than the authority).

Read inside all 24 papersPro opens every page, searches every appendix, and keeps the papers if the council removes them.

Every paper for this meeting

All 24 papers in one list, with the item each belongs to, its size, and our copy of it. Download any paper from our archive once signed in; read and search it here with Pro.

PaperSizeOur copy
MINUTESItem 3, MINUTES
71 KB
Kept 1 Oct
FINANCIAL MONITORING PACK AS AT 31 JANUARY 2015Item 4, FINANCIAL MONITORING PACK AS AT 31 JANUARY 2015
4.5 MB
Kept 1 Oct
PERFORMANCE REPORT FQ3 2014-15Item 5, PERFORMANCE REPORT FQ3 2014-15
468 KB
Kept 1 Oct
ARGYLL AND BUTE COUNCIL EQUALITIES MAINSTREAMING REPORT AND PROGRESS ON EQUALITY OUTCOMES 2015Item 6, ARGYLL AND BUTE COUNCIL EQUALITIES MAINSTREAMING REPORT AND PROGRESS ON EQUALITY OUTCOMES 2015
154 KB
Kept 1 Oct
Equalities Mainstreaming Report 2015 v3 finalItem 6, ARGYLL AND BUTE COUNCIL EQUALITIES MAINSTREAMING REPORT AND PROGRESS ON EQUALITY OUTCOMES 2015
2.2 MB
Kept 1 Oct
REVISED REDUNDANCY POLICY AND PROCEDURESItem 7, REVISED REDUNDANCY POLICY AND PROCEDURES
65 KB
Kept 1 Oct
Redundancy Policy and procedure version 2 June 2014Item 7, REVISED REDUNDANCY POLICY AND PROCEDURES
115 KB
Kept 1 Oct
Argyll and Bute Information Management Strategy V1.3Item 8, INFORMATION MANAGEMENT STRATEGY
242 KB
Kept 1 Oct
INFORMATION MANAGEMENT STRATEGYItem 8, INFORMATION MANAGEMENT STRATEGY
64 KB
Kept 1 Oct
2015: 2019 CUSTOMER SERVICE STRATEGYItem 9, 2015 - 2019 CUSTOMER SERVICE STRATEGY
114 KB
Kept 1 Oct
CS Strategy 2015-19 v 1.1 Appendix 2 P&R Mar 2015Item 9, 2015 - 2019 CUSTOMER SERVICE STRATEGY
306 KB
Kept 1 Oct
CS Strategy Appendix 1 P&R Feb 2015Item 9, 2015 - 2019 CUSTOMER SERVICE STRATEGY
322 KB
Kept 1 Oct
CS Strategy Appendix 3 (OBC 2.2) P&R Mar 2015Item 9, 2015 - 2019 CUSTOMER SERVICE STRATEGY
236 KB
Kept 1 Oct
SCOTTISH GOVERNMENT FUNDING FOR WELFARE REFORM AND DISCRETIONARY HOUSING PAYMENTS: REPORT ON SPEND TO DATE AND FUTURE PROPOSALSItem 10, SCOTTISH GOVERNMENT FUNDING FOR WELFARE REFORM AND DISCRETIONARY HOUSING PAYMENTS - REPORT ON SPEND TO DATE AND FUTURE PROPOSALS
103 KB
Kept 1 Oct
COUNCIL TAX ON EMPTY PROPERTIESItem 11, COUNCIL TAX ON EMPTY PROPERTIES
200 KB
Kept 1 Oct
COUNTER FRAUD TEAM: BUSINESS CASEItem 12, COUNTER FRAUD TEAM - BUSINESS CASE
180 KB
Kept 1 Oct
DIRECT PAYMENTS POLICY AND PROCEDURAL GUIDANCE FOR STAFF AND MANAGERS 2014Item 13, DIRECT PAYMENTS POLICY AND PROCEDURAL GUIDANCE FOR STAFF AND MANAGERS 2014
82 KB
Kept 1 Oct
DP Policy and Guidance: App 1Item 13, DIRECT PAYMENTS POLICY AND PROCEDURAL GUIDANCE FOR STAFF AND MANAGERS 2014
770 KB
Kept 1 Oct
MEMBERSHIP OF THE PROPOSED SCOTTISH LOCAL AUTHORITY BUSINESS LOAN FUNDItem 14, MEMBERSHIP OF THE PROPOSED SCOTTISH LOCAL AUTHORITY BUSINESS LOAN FUND
107 KB
Kept 1 Oct
Assessment Process for Additional FundingItem 15a, Assessment Process for Additional Funding
80 KB
Kept 1 Oct
Assessment of External Financial Request: Kilmartin MuseumItem 15b, Assessment of External Financial Request - Kilmartin Museum
121 KB
Kept 1 Oct
POLICY AND RESOURCES COMMITTEE WORKPLANItem 16, POLICY AND RESOURCES COMMITTEE WORKPLAN
64 KB
Kept 1 Oct
CASTLE LODGE GATE HOUSEItem 17, CASTLE LODGE GATE HOUSE
61 KB
Kept 1 Oct
Project 1 Lorn Road Kirk Road Dunbeg start up P & R committee report 23-02-15 v2.1Item 18, LORN ARC TAX INCREMENTAL FINANCING (TIF) ASSET PROJECT 1 - LORN ROAD/KIRK ROAD IMPROVEMENTS - DUNBEG START UP REPORT
83 KB
Kept 1 Oct

Last time, and what carried over

The committee last met on 5 February 2015. 5 of its items lead into this meeting; 12 items are new. Point at any item to follow a thread. Procedural items are left out.

Feb5
5 February 201516 items, 17 papers
Held
carried over
Mar19
19 March 201535 items, 24 papers
Held
3
MINUTESPolicy and Resources Committee 18 December 2014
4
STRATEGIC RISK REGISTER - 6 MONTHLY REVIEWReport by Head of Strategic Finance
5a
Pack 1 Service Plans
5b
Pack 2 Revenue BudgetSection A – Introductory Report and Recommendations for Budget papers...
6
TREASURY MANAGEMENT STRATEGY STATEMENT AND ANNUAL INVESTMENT STRATEGYReport by Head of Strategic Finance
7
EXECUTIVE SUMMARY AND INTRODUCTORY REPORT - FINANCIAL REPORT MONITORING PACK - DECEMBER 2014Report by Head of Strategic Finance Revenue Budget Monitoring Report...
8
REVIEW OF ALL WEATHER PITCH CHARGESView the declarations of interest for item 8. Report by Executive...
9
AUDIT SCOTLAND/ACCOUNTS COMMISSION ACTION PLAN UPDATEReport by Executive Director – Customer Services
10
POLICY AND RESOURCES COMMITTEE WORK PLAN 2014 - 15Report by Executive Director – Customer Services
11
REVIEW OF THE ARGYLL AND BUTE GUIDANCE ON COMMUNITY BENEFITS FROM ONSHORE RENEWABLE ENERGYReport by Executive Director – Development and Infrastructure Services
12
DIGITAL INFRASTRUCTURE UPDATEReport by Executive Director – Development and Infrastructure Services
13
LORN ARC TAX INCREMENTAL FINANCING (TIF) ASSET PROJECT 9 - EXISTING ACCESS IMPROVEMENTS AND BUSINESS PARK ENABLEMENT, OBAN AIRPORT START UP PROJECT
3
MINUTESNew this time
4
FINANCIAL MONITORING PACK AS AT 31 JANUARY 2015Reports by Head of Strategic Finance Revenue Budget Monitoring Report...
5
PERFORMANCE REPORT FQ3 2014-15New this time
6
ARGYLL AND BUTE COUNCIL EQUALITIES MAINSTREAMING REPORT AND PROGRESS ON EQUALITY OUTCOMES 2015Report by Executive Director – Customer Services
7
REVISED REDUNDANCY POLICY AND PROCEDURESNew this time
8
INFORMATION MANAGEMENT STRATEGYReport by Executive Director – Customer Services
9
2015 - 2019 CUSTOMER SERVICE STRATEGYReport by Executive Director – Customer Services
10
SCOTTISH GOVERNMENT FUNDING FOR WELFARE REFORM AND DISCRETIONARY HOUSING PAYMENTS - REPORT ON SPEND TO DATE AND FUTURE PROPOSALSNew this time
11
COUNCIL TAX ON EMPTY PROPERTIESNew this time
12
COUNTER FRAUD TEAM - BUSINESS CASENew this time
13
DIRECT PAYMENTS POLICY AND PROCEDURAL GUIDANCE FOR STAFF AND MANAGERS 2014New this time
14
MEMBERSHIP OF THE PROPOSED SCOTTISH LOCAL AUTHORITY BUSINESS LOAN FUNDNew this time
15a
Assessment Process for Additional FundingNew this time
15b
Assessment of External Financial Request - Kilmartin MuseumNew this time
16
POLICY AND RESOURCES COMMITTEE WORKPLANReport by Executive Director – Customer Services
17
CASTLE LODGE GATE HOUSENew this time
18
LORN ARC TAX INCREMENTAL FINANCING (TIF) ASSET PROJECT 1 - LORN ROAD/KIRK ROAD IMPROVEMENTS - DUNBEG START UP REPORT
27
The CommitteeNew this time

The threads

  • TREASURY MANAGEMENT STRATEGY STATEMENT AND ANNUAL INVESTMENT STRATEGY leads to item 8, INFORMATION MANAGEMENT STRATEGY
  • TREASURY MANAGEMENT STRATEGY STATEMENT AND ANNUAL INVESTMENT STRATEGY leads to item 9, 2015 - 2019 CUSTOMER SERVICE STRATEGY
  • EXECUTIVE SUMMARY AND INTRODUCTORY REPORT - FINANCIAL REPORT MONITORING PACK - DECEMBER 2014 leads to item 4, FINANCIAL MONITORING PACK AS AT 31 JANUARY 2015
  • POLICY AND RESOURCES COMMITTEE WORK PLAN 2014 - 15 leads to item 16, POLICY AND RESOURCES COMMITTEE WORKPLAN
  • REVIEW OF THE ARGYLL AND BUTE GUIDANCE ON COMMUNITY BENEFITS FROM ONSHORE RENEWABLE ENERGY leads to item 6, ARGYLL AND BUTE COUNCIL EQUALITIES MAINSTREAMING REPORT AND PROGRESS ON EQUALITY OUTCOMES 2015
  • REVIEW OF THE ARGYLL AND BUTE GUIDANCE ON COMMUNITY BENEFITS FROM ONSHORE RENEWABLE ENERGY leads to item 8, INFORMATION MANAGEMENT STRATEGY
  • LORN ARC TAX INCREMENTAL FINANCING (TIF) ASSET PROJECT 9 - EXISTING ACCESS IMPROVEMENTS AND BUSINESS PARK ENABLEMENT, OBAN AIRPORT START UP PROJECT leads to item 18, LORN ARC TAX INCREMENTAL FINANCING (TIF) ASSET PROJECT 1 - LORN ROAD/KIRK ROAD IMPROVEMENTS - DUNBEG START UP REPORT

Not carried over

STRATEGIC RISK REGISTER - 6 MONTHLY REVIEW, Pack 1 Service Plans, Pack 2 Revenue Budget, REVIEW OF ALL WEATHER PITCH CHARGES and 2 more do not return this time.

See the 5 February meeting

This committee over time

Every Policy and Resources Committee meeting we have read, the dates it has set for the future, and each time those dates have changed.

52 meetings, 2014 to 2026Dot size shows the number of papers
2014201620182020202220242026
HeldThis meeting
MeetingItemsPapers
20 Aug 2026Thursday
22items
18papers
HeldOpen
24 Jun 2026Wednesday
4items
1papers
HeldOpen
21 May 2026Thursday
17items
19papers
HeldOpen
19 Feb 2026Thursday
22items
26papers
HeldOpen
4 Dec 2025Thursday
9items
7papers
HeldOpen
9 Oct 2025Thursday
10items
12papers
HeldOpen
21 Aug 2025Thursday
19items
18papers
HeldOpen
8 May 2025Thursday
16items
17papers
HeldOpen
20 Feb 2025Thursday
18items
25papers
HeldOpen
5 Dec 2024Thursday
17items
15papers
HeldOpen
10 Oct 2024Thursday
12items
13papers
HeldOpen
15 Aug 2024Thursday
28items
23papers
HeldOpen
9 May 2024Thursday
14items
13papers
HeldOpen
15 Feb 2024Thursday
17items
17papers
HeldOpen
7 Dec 2023Thursday
14items
10papers
HeldOpen
12 Oct 2023Thursday
21items
16papers
HeldOpen
10 Aug 2023Thursday
19items
16papers
HeldOpen
11 May 2023Thursday
21items
13papers
HeldOpen
16 Feb 2023Thursday
21items
12papers
HeldOpen
19 Jan 2023Thursday
3items
1papers
HeldOpen
8 Dec 2022Thursday
23items
20papers
HeldOpen
13 Oct 2022Thursday
16items
14papers
HeldOpen
11 Aug 2022Thursday
17items
16papers
HeldOpen
11 Aug 2022Thursday
3items
6papers
HeldOpen
16 Jun 2022Thursday
11items
10papers
HeldOpen
17 Feb 2022Thursday
22items
14papers
HeldOpen
9 Dec 2021Thursday
3items
1papers
HeldOpen
9 Dec 2021Thursday
26items
29papers
HeldOpen
14 Oct 2021Thursday
12items
14papers
HeldOpen
12 Aug 2021Thursday
21items
25papers
HeldOpen
13 May 2021Thursday
19items
23papers
HeldOpen
18 Feb 2021Thursday
15items
8papers
HeldOpen
20 Feb 2020Thursday
16items
12papers
HeldOpen
16 May 2019Thursday
17items
15papers
HeldOpen
14 Feb 2019Thursday
16items
11papers
HeldOpen
16 Aug 2018Thursday
16items
17papers
HeldOpen
24 May 2018Thursday
32items
26papers
HeldOpen
15 Feb 2018Thursday
16items
17papers
HeldOpen
17 Aug 2017Thursday
23items
27papers
HeldOpen
29 Jun 2017Thursday
7items
8papers
HeldOpen
16 Mar 2017Thursday
16items
16papers
HeldOpen
16 Feb 2017Thursday
12items
14papers
HeldOpen
15 Dec 2016Thursday
21items
20papers
HeldOpen
12 May 2016Thursday
15items
17papers
HeldOpen
17 Mar 2016Thursday
24items
17papers
HeldOpen
11 Feb 2016Thursday
10items
10papers
HeldOpen
8 Oct 2015Thursday
9items
6papers
HeldOpen
14 May 2015Thursday
31items
19papers
HeldOpen
2 Apr 2015Thursday
4items
3papers
HeldOpen
19 Mar 2015Thursday, this meeting
35items
24papers
5 Feb 2015Thursday
16items
17papers
HeldOpen
15 May 2014Thursday
13items
9papers
HeldOpen

Follow the Policy and Resources Committee

Choose what you want to hear about. The preview is built from this committee's real papers and changes, so you can see what would have reached you.

What should we tell you?

Argyll and Bute, Policy and Resources Committee

Policy and Resources Committee: 3 kinds of updateArgyll and Bute, sent the same day
PDF
24 papers published for 19 MarchFINANCIAL MONITORING PACK AS AT 31 JANUARY 2015 and 23 more papers
DAT
Meeting dates updatedAny date added, moved or dropped
DEC
Decisions from 19 MarchThe committee's resolutions, the day they are recorded
ABC
"financial" found in 2 papersFINANCIAL MONITORING PACK AS AT 31 JANUARY 2015 and Assessment of External Financial Request: Kilmartin Museum
Each update links to the paper and the council's own copy
Free: one weekly alert. Pro: every option, the same day. Pro Plus: straight into your own systems.

Free

One alert, sent weekly, on titles and decisions.

£0for good
  • 1 alert, weekly summary
  • Titles and decisions
  • Link to every official paper
Save this alert free
Most chosen

Pro

Unlimited alerts the same day, searching every page.

£99per user a month
  • Unlimited alerts, same day
  • Matches inside every page and appendix
  • Every council, not just this one

Pro Plus

Your team, with every match pushed into your own tools.

£449a month, 3 users included
  • Everything in Pro, for 3 users
  • Alerts as webhooks into Slack or a CRM
  • API key and bulk export of this council

Data licence

Every council's records in your own products and research.

£12,000a year, from
  • Unlimited API and full archive delivery
  • Rights to use the data in your products
  • Back to 2000, every council
Talk to us

Never miss what this committee decides

Papers, decisions and date changes for the Policy and Resources Committee, and every other committee you follow, the day they appear.

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies