Resolved
RESOLVED that the Council raise an objection to the proposal for the reasons detailed in the report.
Planning Committee decided this item on Wednesday 26 May 2021. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED that the Council raise an objection to the proposal for the reasons detailed in the report.
F/6/21/WS
Recommendation Report for County Matter Consultation
REF NO: F/6/21/WS .
LOCATION: Ford Circular Technology Park Ford Road Ford BN18 0XL PROPOSAL: Demolition of existing buildings and structures and construction and operation of an energy recovery facility and a waste sorting and transfer facility for treatment of municipal, commercial and industrial waste, including ancillary buildings, structures, parking, hardstanding and landscape works.
SITE AND SURROUNDINGS
DESCRIPTION OF APPLICATION This application is a "county matter" that will be determined by West Sussex County Council. The County Council has consulted Arun District Council as a statutory consultee and will need to consider any representations, which are made in response, as material considerations to be taken into account before determining the application.
It is a full application seeking planning permission for the construction and operation of an Energy Recovery Facility (ERF) and a Waste Sorting and Transfer Facility (WSTF). The ERF building would be located in the centre of the site and would feature a bunker hall, boiler hall, turbine hall and two stacks. It would also include visitor, administrative and welfare facilities. The WSTF would be located in the south-western part of the site. Other buildings and structures ancillary to the ERF and WSTF include a gatehouse, weighbridges, air cooled condensers, electricity transformer, pump houses, storage tanks, staff and visitor parking and internal roads. Bunds and landscape planting would be located along the west, north and east boundary to screen the lower part of the buildings and the activity on the site at ground level.
The ERF would be capable of treating 275,000 tonnes of non- recyclable waste each year from homes and businesses across West Sussex and neighbouring counties, which would generate 28MW (net) electricity. The site already benefits from planning permission for an ERF alongside a waste transfer facility that is currently operational. The extant permission is for a facility that would handle up to 200,000 tonnes of waste per annum. The proposed development would increase this amount by 75,000 tonnes per annum. The ERF would sit within the existing site boundary, with access via the recently opened new entrance at Ford Road. Existing REPORT_1011(ODB) F/6/21/WS buildings on the site would be removed, making way for the ERF and supporting buildings including a replacement for the current waste transfer station.
The site currently has planning permission for 120 HGVs to enter and exit the site (240 HGV movements) Mondays to Fridays and 60 HGVs to enter and exit the site (120 HGV movements) on Saturdays (with HGV routing south towards the A259). It is proposed that these limits would remain in place during operation of the proposed ERF and WSTF.
The stated benefits of the project include: - Creation of 58 new permanent jobs - Treatment of a total of 295,000 tonnes of non-hazardous waste a year at the ERF and WSTF - Power for around 68,000 homes - Opportunity to provide heat and power for local homes, businesses and public facilities - Provision of apprenticeship, graduate recruitment and management training schemes.
The application comprises a comprehensive set of plans, drawings and documents, including an Environmental Statement.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
F/6/21/WS: Ford Circular Technology Park, Ford Road, Ford, BN18 0XLReport | 109 KB | DownloadRead as text |
Follow Planning Committee at Arun and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 26 Aug 2026 | BN/52/26/S73 The former Croft Surgery, Barnham Road, Eastergate PO20 3RPRESOLVED That the application be APPROVED CONDITIONALLY. | Approved | Open |
| 26 Aug 2026 | Former Merry England Nursery (Now Swallows Gate), Angmering and non-provision of footpath.RESOLVED 2.1 that the council will take no action regarding the breach, inform Swallows Gate residents and any other ... | Decided | Open |
| 26 Aug 2026 | F/19/25/OUT Land to the south of Ford Lane, Arundel BN18 0DFRESOLVED That the application be DEFERRED for a period of one month to enable the drainage information to be fully re... | Deferred | Open |
| 26 Aug 2026 | AL/44/26/S73 Laurel Rise and Grey Gables (Former Plot 1), Fontwell Avenue, Eastergate PO20 3RURESOLVED That the application be APPROVED CONDITIONALLY. | Approved | Open |
| 26 Aug 2026 | AL/45/26/S73 Pip Pen and House not completed yet (Plot 2), Fontwell Avenue, Fontwell PO20 3RURESOLVED That the application be APPROVED CONDITIONALLY. | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.