Resolved
RESOLVED that the report be received and noted.
Planning Committee noted this item on Wednesday 12 June 2024. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED that the report be received and noted.
To summarise the recent changes to the planning system, specifically changes to Planning Enforcement, and to permitted development (PD) rights relating to agricultural developments.
Recommendation(s)
To note the content of the report.
Reasons for Recommendation(s)
For information in relation to changes to the planning system
None
Detailed Information Enforcement Changes:
From Thursday 25 April, changes to enforcement and lawful development certificate (LDC) appeals came into effect as a result of the Levelling Up and Regeneration Act (LURA). The main changes are summarised below.
Time Limits: • The four-year time limit for bringing enforcement action against building or engineering operations and changes of use to a single dwelling-house will be removed.
• A single 10-year period will apply to all breaches of planning controls.
• Transitional Provisions – These changes will not apply where the operational development or change of use to a dwelling was substantially completed before 25 April 2024.
• Duration of Temporary Stop Notices: From 25 April 2024, the duration of temporary stop notices in England increased from 28 days to 56 days.
Enforcement Warning Notices (EWN): EWNs constitute the taking of enforcement action and allow councils to invite regularisation applications when it appears that a development has taken place in breach of planning control. The intention is that the EWN can be issued where a planning breach is not sufficiently egregious to require immediate enforcement action.
Restriction on appeals against enforcement notices Changes to when a ground (a) (an application for retrospective planning permission) will limit circumstances in which an appeal against an enforcement notice can be brought on ground (a). This will apply in circumstances where an application for planning permission has already been made to regularise the breach. These amendments do not apply to appeals against enforcement notices that were issued, and have not been withdrawn, before 25 April 2024. This stops a second bite where a decision has been made and is used as a delaying tactic.
Undue Delays in Appeals: s.119 of LURA gives the Planning Inspectorate the ability to dismiss appeals against enforcement notices and certificates of lawfulness on the grounds of undue delay by the appellant in progressing the appeal.
Heritage: s.103 grants LPAs the power to issue temporary stop notices where they believe works are being carried out to a listed building without listed building consent, or in breach of a condition set out on a listed building consent. Agricultural Development PD Changes:
From the 21 May 2024 changes were made to permitted development rights which the government notes are designed to offer flexibility and support the agricultural sector. The main changes are summarised below.
Changes of use under Class Q and Class R will still be subject to the prior approval process, requiring the developer to submit details to the Council for approval before carrying out any work.
Class Q – Agricultural to Dwelling: • It will now allow the creation of up to ten dwellings with a maximum cumulative floor space of 1,000m2 (previously the number of dwellings was limited to five with a maximum floor space of 865m2).
• There has been a reduction in the maximum floor space for any one property. Previously, it had been possible to have one property with a floor space of up to 465m2, but a maximum limit of 150m2 has been introduced for any of the houses created.
• A single-storey rear extension of up to 4m height and length to be added to a building as part of the change of use, providing it is located on any hard surface already present.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Enforcement & Agricultural Permitted Development ChangesReport | 96 KB | DownloadRead as text |
Follow Planning Committee at Ashfield and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 2 Sep 2026 | Proposed and Recent Legislation and Policy Changes.RESOLVED that the report be received and noted. | Noted | Open |
| 2 Sep 2026 | Planning Appeal Decisions.RESOLVED that the report be received and noted. | Noted | Open |
| 22 Jul 2026 | Planning Appeal DecisionsRESOLVED that the report be received and noted. | Noted | Open |
| 10 Jun 2026 | Planning Appeal DecisionsRESOLVED that the report be received and noted. | Noted | Open |
| 15 Apr 2026 | Planning Appeal DecisionsRESOLVED that the report be received and noted. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.