Item130d
Resolved
Resolved PERMIT subject to planning conditions and notes, including those dealing with the subject matters identified below (but not limited to that list) with delegated authority to the Strategic Development and Delivery Manager or Planning Applications & Building Control Manager to make or approve changes to the planning conditions (for the avoidance of doubt including additions, amendments and deletions) as she/he sees fit) and with any ‘pre commencement’ based planning conditions to have been the subject of the agreement process provisions effective 01/10/2018. Conditions: 1. Standard time implementation 2. Development carried out in accordance with approved plans 3. Details and implementation of soft landscaping 4. Arboricultural Method Statement 5. Archaeological field evaluation works 6. Construction Environment Management Plan 7. Biodiversity Method Statement 8. Updated ecology surveys 9. Landscape Creation, Enhancement and Management Plan 10.Development in accordance with Flood Risk Assessment 11.Wetland Monitoring, Management & Maintenance Plan 12.Groundwater contamination mitigation strategy 13.Surface water drainage scheme 14.Infiltration of surface water drainage into the ground 15.Constructed Wetland Design & Specification verification 16.Reporting of unexpected contamination 17.Water Framework Directive (WFD) Assessment 18.Pipe details Notes: Environment Agency Advice to applicant – Environmental permit: The Environmental Permitting (England and Wales) Regulations 2016 require a permit or exemption to be obtained for any activities which will take place: • on or within 8 metres of a main river (16 metres if tidal) • on or within 8 metres of a flood defence structure or culverted main river (16 metres if tidal) • on or within 16 metres of a sea defence • involving quarrying or excavation within 16 metres of any main river, flood defence (including a remote defence) or culvert • in the floodplain of a main river if the activity could affect flood flow or storage and potential impacts are not controlled by a planning permission For further guidance please visit https://www.gov.uk/guidance/flood-risk-activitiesenvironmental-permits or contact our National Customer Contact Centre on 03708 506 506 (Monday to Friday, 8am to 6pm) or by emailing [email protected]. The applicant should not assume that a permit will automatically be forthcoming once planning permission has been granted, and we advise them to consult with us at the earliest opportunity Environment Agency Advice to applicant – Reservoirs: Provisions have been made in the Floods and Water Management Act 2010 (England and Wales) for the threshold at which reservoirs are regulated, to be reduced from 25,000 cubic metres to 10,000 cubic metres. Although there is currently no requirement to register reservoirs which are capable of holding 10,000 cubic metres of water above the natural level of any part of the surrounding land, the legislation is under review and future changes may include the lowering of the threshold for registration. In the event of an amendment to the Reservoirs Act 1975, the owners may need to register the wetland as a reservoir in order meet regulatory requirements. Consideration of the potential for changes to the qualifying volume under the Act, will enable easier implementation of design changes in the future. Any facilities or infrastructure for the storage ... view the full minutes text for item 130d
Word for word from the decision Ashford published for this meeting.
Source: ashford.moderngov.co.uk