Description of Decisions i. That the proposal to continue the project development for the establishment of a hydro power unit on the River Great Ouse at the Boatslide Weir, be endorsed. ii. That both options of an Archimedean screw turbine (i.e. single and double) continue to be investigated further. iii. That a sum of £33,000 be allocated from the advanced feasibility budget to allow consultants to be commissioned to work up detailed design proposals and undertake negotiations with the Environment Agency and Planning Authority. iv. That a capital programme bid be prepared for the project to be submitted as part of the capital investment programme in December 2008. v. That the consultants’ brief, as referred to in iii) above, include a requirement to consider opportunities for community investment in the hydro power project.
Word for word from the decision Bedford published for this meeting.Source: councillorsupport.bedford.gov.uk
To report the outcomes of IT Power feasibility study to establish a hydropower project at the Boatslide Weir on the River Great Ouse.
In September 2007 this committee received a report based on the stage 1 study undertaken by Derwent Hydro which identified the Boatslide Weir as the more suitable of the two locations considered for a micro hydropower unit. Derwent Hydro favoured the use of a siphon propeller system rather than an Archimedean screw turbine.
After further investigations by Bedford Design Group, it was felt that before fully discounting Archimedean screw turbines further consideration should be given to this technology.
IT Power was subsequently appointed to undertake a review of the cost and economics of installing Archimedean screw turbine(s) at the Boatslide Weir. The IT Power report, attached at Appendix A, outlines options for either a single or double Archimedean screw turbine. Each solution has an estimated payback period of 16 years with an assumed operational life of 25 years so is this better payback than the siphon propeller.
Recommendations
That Committee considers the report and:
i) determine whether to continue to develop the project to establish a hydro power unit on the river Great Ouse at the Boatslide Weir.
ii) Subject to i) above determines its preferred option for either a single or double Archimedean screw turbine.
iii) That a sum of £33,000 be allocated from the advanced feasibility budget to allow consultants to be commissioned to work up detailed design proposals and undertake negotiations with the Environment Agency and Planning Authority.
iv) That a capital programme bid be prepared for the project to be submitted as part of the capital investment programme in December 2008.
v) That subject to approving iii) above that the consultants’ brief includes a requirement to consider opportunities for community investment in the hydro power project.
Reasons for recommendations
To allow the committee to determine whether or not to proceed with a hydro power project and if so to identify a preferred option and funding arrangements.
4. KEY ISSUES
Resource
A sum of £12,500 was allocated from the advanced feasibility budget to fund the feasibility work. Derwent Hydro was initially appointed to undertake a two stage study, at a cost of £9,850, however only the first stage was commissioned at a cost of £975 which identified the preferred location for a hydro power unit and proposed siphon turbines.
A further study was then commissioned for IT Power in the sum of £1,500 to investigate the economics and cost of Archimedean screw turbines.
The estimated cost of Bedford Design Groups work on the project to date is in the order of £3000.
This leaves circa £7,000still remaining in the advanced feasibility budget for this project.
Estimated Construction Costs.
Siphon Turbine System Derwent Hydro estimated the cost for construction of a two siphon turbine system at £282,500. With additional fees and ancillary costs it is likely that the overall project costs would be in the order of £325,000 - £350,000.
Archimedean screw The IT Power report identifies options for either a single Archimedean screw or a double Archimedean screw. The respective construction costs are in the order of £131000 and £235,000 with a likely payback period of 16 years on either Archimedean option. However these figures do not account for the costs associated with the design and specification or indeed the ancillary works associated with resolving some of the constraints identified in their report. An allowance also needs to be made for Bedford Design Group to maintain a technical watching brief on the project.
The estimated additional cost of this work and BDG fees would be in the order of £40,000. Although, if the current under spend on the feasibility work could be utilised this figure would reduce to £33,000.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.