CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Bedford Borough Council
Full Council, Wednesday 23 February 2022 at 6.30pm

REPORT OF THE MAYOR/EXECUTIVE MEMBERS

Noted Committee 1 paper

Full Council noted this item on Wednesday 23 February 2022. Below is the council's own wording, with the papers it was decided on.

Item112

Resolved

That the presentation on the Green Energy Park be noted.
Word for word from the decision Bedford published for this meeting. Source: councillorsupport.bedford.gov.uk

Follow this further

Built from Bedford's papers

What the report saysPro

Report to Full Council, 18 pages

Full Council - 23 February 2022 Elstow Landfill Site Elstow Closed landfill Site Background

• Excavation of clay commenced at the site in the 1920s to supply brick production at the nearby brickworks • The landfill site closed for deposit of waste in October 1998. • There is an active landfill gas generator on site with the associated transformers to allow export of electricity to the National Grid. • BBC inherited the landfill site in April 2009 as part of the new Unitary Council responsibilities including the liabilities of the site. Thank you! Bedfordshire County Council

A toxic dump giving off methane gas and contaminated water expected to cost £8m to fix Elstow Landfill Site The site area (blue boundary line) is approx. 33.1 ha (81.7 acres) Restoration Responsibility (Legal Duty)

After the final waste has been deposited, a landfill site requires a final cover or ‘cap’ for the:

• containment and protection of the waste • prevention of rainwater and surface water percolating into the site and influencing the generation of leachate • prevention of leachate seeping into groundwater supplies • control of the release of landfill gas • prevention of the ingress of air and the disruption of the anaerobic biodegradation process • provision of soil for the establishment of restored site plant materials Long Term Financial Provision

Financial provision for any landfill, you must calculate the aftercare costs for 40-50 years.

• environmental monitoring • permitting/ licensing • surface water, leachate, landfill gas management • Site maintenance, site security • producing site reports – performance report, surrender report and topographical surveys • specified events Design & Build of a Leachate Treatment Plant • In the old County days the leachate was taken off site to a treatment works in road tankers, 2 tankers a day. The solution was uneconomic both (financial and environmental). • Following a tender exercise in 2013, a tender was awarded to build the Council’s Leachate Treatment Plant (LTP) on the site to treat on site 50m3 a day into an effluent which met the limits required on the trade effluent consent for safe discharge to sewer. • Payback in investment 5 years, savings thereafter. Design & Build of a Leachate Treatment Plant cont…

The Sequencing Batch Reactor (SBR) and Effluent Discharge tanks are situated in a concrete bund designed to contain at least 110% of the SBR volume and located on the Council’s site at Elstow . Landfill Gas-to-Energy Turning waste into energy

A by-product of any decomposing material at Elstow, is collected from within the waste through a system of vertical wells and pipelines and directed to a separate on-site treatment facility. The treated landfill gas is used to generate electricity right at the landfill that is delivered to the electrical grid via a connection on the side of the A6. Long term restoration strategy for Elstow Landfill • The council is restoring the landfill site with suitable restoration soils being brought in. • Income will offset costs, help deliver this project on a cost neutral basis as much as possible. • Working with Cranfield and Bedford University and Colleges as a future site educational resource. • Development of a final masterplan for revolutionary designs for local energy systems. Elstow Energy Park

4.2MW Ground Solar Farm Works installing Racking for PV panels, Solar Farm Elstow Energy Park

• 8,004 solar panels (1.2mx2.2m) 515-535 Watt • Bifacial Power Gain Bifacial cell architecture allows backside bonus and more lifetime power yield. Elstow Energy Park

Future Option (subject to business case, funding):

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
REPORT OF THE MAYOR/EXECUTIVE MEMBERSReport 18 pages DownloadRead as text

At this meeting

Whole meeting

On this subject at Bedford

Search all
  1. REPORT OF THE MAYOR/EXECUTIVE MEMBERSThis decision
  2. Report of the mayor/executive membersNoted
  3. Report of the mayor/executive membersApproved
  4. Report of the mayor/executive membersNoted
  5. Reports of the mayor/executive membersNoted
  6. Reports of the mayor/executive membersNoted

More from Bedford Full Council

All decisions
MeetingDecisionOutcome
1 Jul 2026 MINUTESTo approve as a correct record and to authorise the Speaker to sign the Minutes of the Annual Council meeting held on... Approved Open
1 Jul 2026 Report of the bedfordshire fire and rescue authorityThat the report of Bedfordshire Fire and Rescue Authority be received. Decided Open
1 Jul 2026 Report of the mayor/executive membersThat the use of the Special Urgency Procedure be noted. (2) Membership of Executive and Changes to Executive Committe... Noted Open
1 Jul 2026 Reports of the general purposes committee(1) That the Executive and Overview & Scrutiny Protocol and Employee Partnership Terms of Reference be adopted as par... Approved Open
1 Jul 2026 Report of the audit committeeThat the updated Local Code of Corporate Governance be adopted. Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies