What was decided
Application 24/0869/FUL was approved, subject to the applicant entering into a Section 106 agreement covering ten contribution items and to 36 conditions covering design, landscaping, drainage, archaeology, ecology, contamination, highways and other matters. Report P3, P4, P5, P6
The site, of about 3.59 hectares on the southern edge of Whetstone in designated countryside, is to be developed with 59 dwellings, including 14 affordable homes, 7 bungalows, public open space, a Local Area of Play, drainage attenuation and access from Wright Close, with a secondary emergency access from Springwell Lane. Report P7, 2.1, 2.2, 2.3, 2.4
Officers applied the NPPF 'tilted balance' because the Council can only demonstrate a 2.78 year housing land supply, and concluded the site is not in a statutory protected area, so the presumption in favour of sustainable development at paragraph 11d(ii) applies. Report 7.1
Why
There is an overall under-delivery of houses in the District, with a 2.78 year housing land supply against the five-year requirement, and Whetstone is a 'Large Central Village' that benefits from a range of services and facilities that can support growth. Report P57, P58
The landscape and visual impact was judged not to be 'significantly adverse' under Policy CS18, with a Landscape and Visual Appraisal concluding the scheme can be absorbed into the local landscape, supported by a 2.1 hectare open space and retained hedgerows and trees. Report P71, P73, P75, P76
The site passes the Sequential Test for flood risk, all built development is to be located in Flood Zone 1, finished floor levels will be at least 1.3m above Flood Zone 2 level, and a surface water flow of 5.2 l/s with attenuation is proposed; the Environment Agency and Lead Local Flood Authority raised no objections subject to conditions. Report P118, P119, P121, P126, P129
What happens next
The applicant must enter into a Section 106 agreement to secure the ten contribution items, including 25% affordable housing (14 dwellings, with a commuted sum for the remaining 0.75 unit), secondary and post-16 education, healthcare, open space, travel packs, bus passes, Biodiversity Net Gain and monitoring contributions. Report P4, P85, P143, P146, P147, P152
Whetstone Parish Council will be offered responsibility for managing some parts of the open space, otherwise a developer appointed management company will take this on.
Pre-commencement and other conditions require submission and approval of matters including external materials, finished floor levels, landscaping, an Arboricultural Impact Assessment and Method Statement, an Ecological Appraisal, external lighting, a Construction Environmental Management Plan, foul and surface water drainage, an archaeological mitigation strategy, a waste collection strategy, noise mitigation, contamination reporting, visibility splays, a construction traffic management plan and substation design. Report P6
The money
- £164,191.06 Secondary (11-16) education contribution sought by Leicestershire County Council Report P146
- £35,078.51 Post 16 education contribution sought by Leicestershire County Council Report P147
- £57,112.00 Health care facilities contribution requested by the Leicester, Leicestershire and Rutland Integrated Care Board for GP surgeries Report P152
- £49.00 Per household contribution for recycling and refuse wheeled bins Report P150
- £2,891.00 Total bin contribution for 59 dwellings at £49.00 per household Report P150
- £52.85 Per travel pack if supplied by Leicestershire County Council Report P154
- £500 Administration charge if a sample travel pack is submitted instead of one supplied by LCC Report P154
- £442.50 Per six-month bus pass if supplied by Leicestershire County Council Report P155
Options considered
- Chosen: Approve subject to Section 106 agreement and conditions. Officers concluded the tilted balance in NPPF paragraph 11d(ii) applied because the Council cannot demonstrate a five-year housing land supply, the site is not in a statutory protected area, and planning contributions and conditions would mitigate impact. Report P3
Implications
- Financial: The applicant must provide ten Section 106 contribution items, including a 25% affordable housing provision, education, healthcare, open space maintenance, travel packs, bus passes, Biodiversity Net Gain and S106 monitoring contributions to the District and County Councils. Report P4, P150, P152, P154, P155
- Legal: Planning permission is conditional on completion of a Section 106 legal agreement and a separate statutory Biodiversity Net Gain condition; a range of pre-commencement and other planning conditions are imposed. Report P5, P6
- Risk: Built development is restricted to Flood Zone 1 with no ground raising in Flood Zone 3 and a surface water discharge limited to 5.2 l/s to the Whetstone Brook, with attenuation to manage flood risk up to the 100 year plus climate change event. Report P121, P126, P128
- Equalities: 5% of dwellinghouses are to be constructed as M4(2) compliant dwellings to meet accessible and adaptable homes policy, and the scheme includes a mix of 1 to 5 bedroom homes and 7 bungalows across market and affordable tenures. Report P6, P82, P83, P84
- Climate: The development includes on-site Biodiversity Net Gain provision and monitoring including a Habitat Management and Monitoring Plan, tree and hedgerow retention and new planting of native species such as English oak, Black alder, Rowan, Silver Birch and Magnolia. Report P4, P73, P74
- Other: A Landscape and Visual Appraisal concludes the proposal will create moderate landscape effects primarily due to loss of arable land and that visual effects are localised, reducing significantly by year 15 as planting matures. Report P71
Who and where
- Residents of Whetstone and the surrounding area, including the existing David Wilson Homes development to the north Report P7, P58
- Future occupants of the 59 proposed dwellings, including 14 affordable homes and 7 bungalows Report 2.3, P82, P83, P84
- Whetstone Parish Council, offered management responsibility for parts of the on-site open space
- Badgerbrook Primary School, Thomas Estley Community College, Countesthorpe Academy, Hazelmere Medical Centre and Northfield Medical Centre as recipients of developer contributions Report P145, P146, P147, P152
Timeline
- August 2013: An earlier residential development scheme on land to the north was allowed on appeal under reference APP/T2405/A/13/2193758 Report P7
- As of March 31st 2024: A total of 2,826 homes had been completed in the Principal Urban Area since 2006
- December 2025: Cut-off for Personal Injury Collision data reviewed by Leicestershire County Council Highways; no collisions recorded within 500.0m of the site access in the previous five years
- 2026-03-12: Blaby District Council Planning Committee resolved to approve application 24/0869/FUL subject to Section 106 agreement and conditions
Plain English for the jargon
- Section 106 agreement: A legal agreement under Section 106 of the Town and Country Planning Act 1990 used to secure planning obligations such as affordable housing and financial contributions from a developer.
- Biodiversity Net Gain: A planning requirement that development delivers a measurable improvement in biodiversity compared with the pre-development baseline, with monitoring via a Habitat Management and Monitoring Plan (HMMP).
- Local Area of Play (LAP): A small equipped area of public open space for young children, provided on site as part of the development's open space offer.
- M4(2) compliant dwellings: Homes built to optional Building Regulations standard for accessible and adaptable dwellings, allowing easier adaptation for occupants with mobility needs.
- Sequential Test: A planning test that steers development to areas with the lowest risk of flooding, where it is not possible to locate development in low-risk areas.
- Tilted balance: The approach in NPPF paragraph 11d where planning permission should be granted unless adverse impacts significantly and demonstrably outweigh benefits, applied here because the Council cannot demonstrate a five-year housing land supply.