CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Blackburn with Darwen Borough Council
Planning and Highways Committee, Thursday 18 April 2019 at 6.30pm

Planning Application 10/19/0056

Approved Planning 1 paper

Planning and Highways Committee approved this item on Thursday 18 April 2019. Below is the council's own wording, with the papers it was decided on.

Item85

Resolved

Decision under Town and Country Planning Acts and Regulations - Approved subject to the recommended conditions set out in the Director’s Report and additional conditions highlighted in the Update Report.
Word for word from the decision Blackburn with Darwen published for this meeting. Source: democracy.blackburn.gov.uk

Follow this further

Built from Blackburn with Darwen's papers

What the report saysPro

Report to Planning and Highways Committee

REPORT OF THE DIRECTOR Plan No: 10/19/0056

Proposed development: Full Planning Application for Demolition of existing buildings on site and the erection of 68 dwellings and associated works

Site address: Land off Queen Victoria Street Blackburn BB2 2RZ

Applicant: Countryside Properties UK Ltd

Ward: Mill Hill & Moorgate

Councillor Damian Talbot Councillor Julie Gunn Councillor Jim Smith

W arehouse 28

W orks

15 2 ET RE 1 ST K OO BR

W aterfall 98.1m Mills 8

2a 2b 2

4 10

4 QU EE N VI CT 100.0m OR IA ST RE ET 12 14 16

El Sub Sta 2

W orks 2a ET RE

4 ST LL HI L IL M

W orks

103.9m 24

2 15 on ET Hill Stati ST RE Mill ON INS RK PA 25 27 29 31

41 1

106.7m 2

43 3

55 11

2 1.0 SUMMARY OF RECOMMENDATION

1.1APPROVE – subject to the recommended conditions set out in section 5.0 of this report; the Grampian Condition set out in section 5.0 of this report will facilitate the implementation of an off-site crossing point in the North Blackburn locality.

2.0KEY ISSUES/SUMMARY OF PLANNING BALANCE

2.1The proposal will deliver a high quality housing development which will widen the choice of family housing in the Borough. It supports the Borough’s planning strategy for housing growth as set out in the Core Strategy. The proposal is also satisfactory from a technical point of view, with all issues having been addressed through the application, or capable of being controlled or mitigated through planning conditions

3.0RATIONALE

3.1Site and Surroundings

3.1.1 The application site comprises of an irregular shaped parcel of land situated directly to the north of Mill Hill train station. The land measures approximately 1.77 hectares of previously developed land. The site slopes from south to north and there are significant levels changes in the western part of the site. The majority of the site is vacant however there are two small industrial buildings with associated hard standing in the southeast corner of the site. One of these buildings is vacant whilst the other is currently being used as an auto repair shop. The remainder of the site is scrubland, a bank of trees did once line the western perimeter but these have subsequently been felled

3.1.2 The site is bounded by the residential terrace of New Chapel Street to the west and further residential dwellings situated along Mill Hill Street to the north. To the east of the site are a number of commercial and industrial buildings many of which are still operational. Mill Hill train station is situated to the south of the site with the train track running adjacent to the southernmost part of the site.

3.2Proposed Development

3.2.1 The proposal is a full planning application for the demolition of the existing buildings on site and the erection of 68 dwellings and associated works.

3.2.2 The proposed development will provide 68 dwellings comprising of two, three and four bedroom houses. The proposed mix of dwellings comprises of 17 two bedroom houses, 47 three bedroom houses and 4 four bedroom houses in a mix of detached, semi-detached and terraced dwellings.

3.2.3 The dwellings proposed will be managed housing stock for rent and will not be sold on the open market. 3.2.4 The materials used in the area around the application site are predominantly red brick, white render with grey roof tiles with elements of red roofs and buff brick. The proposed materials reference themselves to the local vernacular without being a pastiche. The internal street scenes and the frontage to Queen Victoria Street will look to compliment this existing character while being careful not to repeat the form of existing residential stock that surround the boundaries of the site. The proposed materials will consist of a light red brick, red multi brick and buff multi brick with selected plots being partially rendered (white) or tile hanging to provide further variety within the street scene.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Planning Application 10/19/0056Report 3.7 MB DownloadRead as text

At this meeting

Whole meeting

Who was there

13 of 17 attended
DS
Councillor David SmithCommittee Member, present
HA
Councillor Hussain AkhtarCommittee Member, present
JC
Councillor Jim CaseyCommittee Member, present
ZK
Councillor Zamir KhanCommittee Member, present
SK
Councillor Suleman KhonatCommittee Member, present
JM
Councillor Julie Margaret DaleyCommittee Member, present
RP
Councillor Roy Peter DaviesCommittee Member, present
DJ
Councillor Derek James HardmanCommittee Member, apologies
JS
Councillor Jacqueline SlaterCommittee Member, apologies, sent representative
KR
Councillor Kieran Robert RichardsCommittee Member, apologies, sent representative
YJ
Councillor Yusuf Jan-VirmaniCommittee Member, present
JM
Councillor Jane Margaret OatesCommittee Member, present

All 17 on the meeting page

On this subject at Blackburn with Darwen

Search all
  1. Planning Application 10/19/0056This decision
  2. Planning Application 10/24/0728 - United Reformed Church, Ashleigh Street, DarwenApproved
  3. Planning Application 10/25/1150 - Vacant Land adjacent to former St. John Vianney RC Church, Livesey branch Road, BlackburnApproved
  4. Planning Application 10/25/1187 - Land at Bank Hey View, off Heys Lane, BlackburnApproved
  5. Planning Application 10/25/1257 - Land to the East of Buncer Lane, BlackburnDeferred
  6. Planning Application 10/26/0009 - Land adjacent to Newlands, 61 Manor Road, DarwenApproved

More from Blackburn with Darwen Planning and Highways Committee

All decisions
MeetingDecisionOutcome
20 Aug 2026 Minutes of meeting Thursday, 16 July 2026 of Planning and Highways CommitteeThat the minutes of the last meeting held Thursday, 16 July 2026 be agreed as a correct record and signed by the Chair. Agreed Open
20 Aug 2026 Material ConsiderationsThat the material considerations be noted. Noted Open
20 Aug 2026 Planning Items for DeterminationThat the committee considered the updated reports of the Strategic Director (Growth and Development) which detailed t... Decided Open
20 Aug 2026 10/25/1270 10/25/1274 - King George's Hall Northgate, Blackburn, BB2 1AAThat the planning permission be granted subject to the conditions detailed in Section 5 of the report. Decided Open
20 Aug 2026 10/25/1356 10/25/1357 - King George's Hall, Northgate, Blackburn BB2 1AAThat the planning permission be granted subject to the conditions detailed in Section 5 of the report. Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies