Decision under Town and Country Planning Acts and Regulations – RESOLVED – Approved subject to the conditions highlighted in the Directors Report and the following adidtional condition in the Update Report; 26. No development approved by this planning permission shall commence until a remediation strategy to deal with the risks associated with contamination of the site in respect of the development hereby permitted, has been submitted to, and approved in writing by, the local planning authority. This strategy will include the following components: 1. A preliminary risk assessment which has identified: • all previous uses • potential contaminants associated with those uses • a conceptual model of the site indicating sources, pathways and receptors • potentially unacceptable risks arising from contamination at the site 2. A site investigation scheme, based on (1) to provide information for a detailed assessment of the risk to all receptors that may be affected, including those off-site. 3. The results of the site investigation and the detailed risk assessment referred to in (2) and, based on these, an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken. 4. A verification plan providing details of the data that will be collected in order to demonstrate that the works set out in the remediation strategy in (3) are complete and identifying any requirements for longer-term monitoring of pollutant linkages, maintenance and arrangements for contingency action. Any changes to these components require the written consent of the local planning authority. The scheme shall be implemented as approved. REASON: To ensure that the development does not contribute to and is not put at unacceptable risk from or adversely affected by, unacceptable levels of water pollution in line with paragraph 174 of the National Planning Policy Framework, and to prevent deterioration of a water quality element to a lower status class in the underlying aquifer and the adjacent water course.
Word for word from the decision Blackburn with Darwen published for this meeting.Source: democracy.blackburn.gov.uk
REPORT OF THE STRATEGIC DIRECTOR Plan No: 10/21/1294
Proposed development: Full Planning Application for The erection of 2no. Industrial warehouse units for use classes B2/B8/E(g)(iii) with ancillary office spaces with the construction of new access, hard and soft landscaping
Site address: Former Darwen Paper Mill Site Lower Eccleshill Road Darwen BB3 0RW
Applicant: Acornfield Properties Ltd
Ward: Darwen East Councillor Paul Browne Councillor Katrina Louise Fielding Councillor Jane Margaret Oates 1 SUMMARY OF RECOMMENDATION
1.1The proposed development is recommended to be granted planning permission, subject to completion of a S106, and the conditions detailed in Section 5.
2 KEY ISSUES/SUMMARY OF PLANNING BALANCE
2.1This application is for the erection of 2no. Industrial warehouse units; a speculative application for Use classes B2/B8/E(g)(iii) with ancillary office spaces, together with the construction of a new access, and hard and soft landscaping. The site is currently vacant; comprising predominantly fields to the north and concrete pads from sewage tanks and filter beds in the south. Historically, the site was the Darwen papermill, and more recently it was used as water treatment works. Given its former use, the land is known to be heavily contaminated, and substantial remediation work is required.
2.2This is a major planning application, comprising 9,867sqm of new internal floorspace on a 35,152sqm site. It is presented to the Planning and Highways Committee due to the objection received from the occupiers of adjoining premises, Crown Paints. A summary of all the responses received is detailed below in Section 6.
2.3The proposed development has been publicised through letters to adjacent occupants. 40 Neighbour letters were issued. A site notice was also displayed outside the site on 1st December 2021, and a Press notice was published on 22nd December 2021. In addition, a number of reconsultations have taken place with bespoke consultees (in particular the Council’s Highways consultee, the Public Protection / Contaminated Land Officer, and the Environment Agency) upon the receipt of amended/updated/additional information provided to address initial concerns.
2.4The Council’s development plan supports new commercial developments and associated works within the defined urban boundary and employment areas, provided they constitute sustainable development, and accord with the development plan when taken as a whole. The proposal would deliver two modern industrial buildings, bringing a long standing vacant previously developed site back into active use, and economic, social and environmental benefits.
2.5The scale and appearance of the buildings would be similar to other warehouses within the industrial area. The proposed warehouses would be rectilinear steel frame structures, utilising standard dual pitched roof profiles, roller shutters, dock levellers, personnel doors, and curtain wall glazing. The warehouses would utilise the existing topography of the site to mitigate the visual impact. Installation of retaining walls would allow the buildings to be constructed at a lower level, reducing the appearance by one storey when viewed from the east. 2.6 It is proposed to use a variation of grey coloured cladding which would gradually become lighter, allowing the elevation to fade into the skyline. The walls and roofs would be clad with trapezoidal sheet metal cladding, with areas of flat panel cladding to the principal elevations.
2.7Primary vehicular access into the site for all vehicles would be from Lower Eccleshill Road, on the Eastern boundary of the site. Approval has previously been granted for the access road and visibility splays from Lower Eccleshill Road (10/20/1226). The public footpaths around the periphery of the site would be unaffected by the proposals. Appropriate vehicular parking, servicing and manouevring would be incorporated within the site, including mobility and cycle/motorcycle parking, and safe pedestrian routes/crossings.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Planning and Highways Committee at Blackburn with Darwen and we tell you when its next papers are published, before the meeting rather than after it.
Planning Items for DeterminationThat the committee considered the updated reports of the Strategic Director (Growth and Development) which detailed t...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.