Resolved
Decision under Town and Country Planning Acts and Regulations – RESOLVED - Approved
Planning and Highways Committee approved this item on Thursday 21 April 2022. Below is the council's own wording, with the papers it was decided on.
Resolved
Decision under Town and Country Planning Acts and Regulations – RESOLVED - Approved
REPORT OF THE STRATEGIC DIRECTOR Plan No: 10/22/0180
Proposed development: Prior Approval - Solar Panels Non-domestic Buildings for Installation of Solar Photo Valtaic (SPV) arrays to roof areas
Site address: Blackburn Central Library Town Hall Street Blackburn BB2 1AG
Applicant: Blackburn with Darwen Borough Council
Ward: Blackburn Central Councillors: Councillor Samim Desai Councillor Mahfooz Hussain Councillor Zamir Khan 1.0 SUMMARY OF RECOMMENDATION
1.1.1 PRIOR APPROVAL NOT REQUIRED
2.0KEY ISSUES/SUMMARY OF PLANNING BALANCE
2.1.1 The Council is seeking prior approval for the installation of roof mounted Solar Photo Voltaic (SPV) system, under Schedule 2, Part 14, Class J of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) on Blackburn Central Library, Blackburn, a Council owned building.
2.1.2 The only planning matters that the Authority are to consider in the determination as to whether prior approval is required are the design or external appearance of the development, including the impact of glare on occupiers of neighbouring land. No other matters are material and cannot be considered as part of this application for prior approval.
2.1.3 The reasons for installing the SPV system, which forms part of the Public Sector Decarbonisation Scheme (PSDS), is to reduce the building’s reliance on grid electricity to save money and to reduce emissions of carbon dioxide. This will contribute towards the Council’s Climate Emergency Declaration to be carbon neutral by 2030.
2.1.4 The proposal is Permitted Development as it conforms to the requirements of Part 14, Class J of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended).
2.1.5 Due to the panels being positioned on the top of the flat roof of the building, both glare and the design and visual impacts of the proposals are considered to be acceptable.
2.1.6 Officers are therefore of the opinion that the scheme complies with parts J.1, J.3 and J.4 in this instance and thus it is therefore considered that prior approval is not required.
3.0RATIONALE
3.1Site and Surroundings
3.1.1 The application site relates to the roof of Blackburn Central Library, Blackburn, as shown in the photos below. Photos taken 25/02/2022
3.1.2 The building is located within the inner urban area of Blackburn, within the town centre boundary, as defined by the Proposals Map associated with the Blackburn with Darwen Local Plan Part 2, and also with the Northgate Conservation Area, a Coal Low Risk Area, and Article 4 area.
3.2Proposed Development
3.2.1 The Council, the applicant, is seeking prior approval for the installation of a roof mounted Solar Photo Voltaic (SPV) system. The reasons for installing the SPV system, which forms part of the Public Sector Decarbonisation Scheme (PSDS), is to reduce the building’s reliance on grid electricity to save money and to reduce emissions of carbon dioxide. This will contribute towards the Council’s Climate Emergency Declaration to be carbon neutral by 2030.
3.2.2 Technical information has been provided in respect of the design and capacity of the proposals. The solar panels proposed are TrinaSolar Vertex S Backsheet Monocrystalline Modules. PRODUCT: TSM-DE09.05, PRODUCT RANGE: 380- 395W. The panels will be fitted to the existing pitched roof as shown in Figures 1 and 2 below:
3.2.3 Figure 1: Roof plan
3.2.4 Figure 2: Elevations
3.2.5 When fixed, all panels will be no higher than 1m above the highest part of the roof (excluding any chimney), and would not be within 1m of the external edge of the roof. The panels will be fixed to the flat roof, and would not be installed on a roof slope which fronts a highway.
3.2.6 Part 14, Class J of the Town and Country Planning (General Permitted Development) (England) Order 2015 relates to ‘Installation or alteration of solar equipment on nondomestic properties’ and part J(c) permits the installation of other solar PV equipment on the roof of a building.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Planning Application 22/0180Report | 701 KB | DownloadRead as text |
Follow Planning and Highways Committee at Blackburn with Darwen and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 20 Aug 2026 | Minutes of meeting Thursday, 16 July 2026 of Planning and Highways CommitteeThat the minutes of the last meeting held Thursday, 16 July 2026 be agreed as a correct record and signed by the Chair. | Agreed | Open |
| 20 Aug 2026 | Material ConsiderationsThat the material considerations be noted. | Noted | Open |
| 20 Aug 2026 | Planning Items for DeterminationThat the committee considered the updated reports of the Strategic Director (Growth and Development) which detailed t... | Decided | Open |
| 20 Aug 2026 | 10/25/1270 10/25/1274 - King George's Hall Northgate, Blackburn, BB2 1AAThat the planning permission be granted subject to the conditions detailed in Section 5 of the report. | Decided | Open |
| 20 Aug 2026 | 10/25/1356 10/25/1357 - King George's Hall, Northgate, Blackburn BB2 1AAThat the planning permission be granted subject to the conditions detailed in Section 5 of the report. | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.