Resolved
Decision under Town and Country Planning Acts and Regulations – RESOLVED – Approved subject to the conditions highlighted in the Directors Report and the Update Report: The recommended condition for the Full Planning Application as referred to in paragraph in 5.1.6, and for the Listed Building Consent application as referred to in paragraph 5.2.3, is proposed to be amended to the following: The applicant, or their agent or successors in title, shall secure the implementation of a programme of building recording, analysis and reporting work in accordance with the Rocket Heritage & Archaeology's, Written Scheme of Investigation: Level 2 Building Recording (April 2024), received on the 9th April 2024. The programme of works in particular must be in accordance with Section 8 “Methodology”, Section 9 “Reporting”, Section 10 “Publication and Dissemination”, Section 11 “Archival”, and Section 15 “Monitoring”, of the submitted Written Scheme of Investigation, and should comprise the creation of a Level 1-2 record as set out in “Understanding Historic Buildings” (Historic England 2016). The work must be undertaken by an appropriately qualified and experienced professional contractor to the standards and guidance of the Chartered Institute for Archaeologists. A copy of this record shall be submitted to the Local Planning Authority and the Lancashire Historic Environment Record. REASON: In order to ensure and safeguard the recording and inspection of matters of archaeological/historical importance associated with the site and to comply with the requirements of Policies CP7 and DM26 of the Blackburn with Darwen Borough Council Local Plan 2021-2037. With regards to the comments received by the relating to the Full Planning Application 10/24/0259, it is recommended that the proposed condition as referred to in paragraph 5.1.4 of the main report, be amended to include the criteria set out in the Trust’s response. The revised condition is as follows: No development/demolition shall commence on site unless and until, a Demolition/Construction Environmental Method Statement has first been submitted to and approved in writing by the Local Planning Authority, which shall provide for but not be exclusively limited to the following: a) The parking of vehicles of site operatives and visitors; b) The loading and unloading of plant and materials; c) A plan showing the siting of temporary protective fencing to be erected to prevent plant, machinery or material being stored or tracking to close to the canal embankment. d) A plan showing the areas of storage of plant, scaffolding, fuel/chemicals and stockpiles, and operational cranes, where relevant. e) Measures to control the emissions of dust and dirt, where relevant; f) Measures to control noise and vibrations, where relevant; g) Details of wheel washing facilities, where relevant; h) Details of the environmental pollution incident emergency response; i ) Method statement relating to the demolition, in ... view the full minutes text for item 81.6