Decision under Town and Country Planning Acts and Regulations – RESOLVED – Approved subject to the conditions highlighted in the Director’s Report and revised condition No3: “No above ground works shall take place until a scheme for the disposal of surface water from the site has been submitted to and approved in writing by the Local Planning Authority. Unless otherwise agreed in writing with the Local Planning Authority, the scheme shall include: (i) An investigation of the hierarchy of drainage options in the National Planning Practice Guidance (or any subsequent amendment thereof). This investigation shall include evidence of an assessment of ground conditions and the potential for infiltration of surface water in accordance with BRE365; (ii) Ground levels of the proposed drainage systems in AOD; (iii) Details of the rate of surface water discharge from the site to any soakaway, watercourse or sewer, including provisions to ensure that the post-development discharge rate does not exceed the pre-development rate (incorporating a climate change allowance of 40%); (iv) Details of any necessary flow attenuation measures, including the use of SUDS where appropriate, unless unachievable for technical reasons; (v) Incorporate mitigation measures to manage the risk of sewer surcharge where applicable; (vi) Details of how the scheme will be maintained and managed after completion; and (vii) A timetable for implementation, including details of any phased delivery. The duly approved scheme shall be implemented before above groundworks are commenced, or within any other timescale first agreed in writing with the Local Planning Authority following consultation with United Utilities. REASON: To ensure that the development is not at risk of flooding and does not increase flood risk elsewhere, and that adequate measures are put in place for the disposal of foul and surface water in accordance with the requirements of Policy DM13 of the Blackburn with Darwen Borough Local Plan 2021-2037 and the National Planning Policy Framework.”
Word for word from the decision Blackburn with Darwen published for this meeting.Source: democracy.blackburn.gov.uk
REPORT OF THE STRATEGIC DIRECTOR Plan No: 10/24/0039
Proposed development: Full Planning Application (Regulation 4) for Creation of new parking area, alteration to existing footpath, replacement access gates and boundary fencing and new vehicular access
Site Address: Land adjacent to Units 1 To 3 Charles Street Darwen BB3 1BF
Applicant: [name removed]: Darwen East Councillors: Katrina Fielding, Matt Gibson Martin McCaughran SM
11 Riv er D SH 77
arw en O 2 RE 79
Y BA to
N 81
K W AY 85
1 93 4 11 4 to 10
Riverside Heights 10 3
Sh
FB e lte r
14 3.5 m
El Su b Sta
ET RE ST S LE AR CH 14 11
1 4 4 .5 m 43
C ar Pa rk H in d le C o u r t 14
1 4 5 .1 m 9
1 4 6 .0 m 15 3
ED W
ET 15
AR
RE 9
D
Su p e r s to r e ST 16 16
Y 3
OD ST
AB RE
PE ET 16 7 16 9
W ork s
m 6.0 14 H all n ce ula mb sA W orks hn Jo St 1.0 SUMMARY OF RECOMMENDATION
1.1APPROVE subject to the conditions set out within section 4 of this report
2.0KEY ISSUES/SUMMARY OF PLANNING BALANCE
2.1The application is reported to Committee on account of the application site (the site) being Council owned and the management responsibility of the Strategic Director of Growth and Development / Deputy Chief Executive. This is in accordance with Regulation 10 of the Town and Country Planning General Regulations 1992 and the Council’s adopted Scheme of Delegation. 2.2 The proposal is in the form of an application for change of use. Detailed assessment finds that the development corresponds with the Council’s strategic and development management objectives of the Local Plan 2021- 2037. All technical issues have been addressed through the application or are capable of being controlled or mitigated through the application of planning conditions.
3.0RATIONALE
3.1Site and Surroundings
3.1.1 The application site principally relates to an irregular area of open space measuring approximately 0.17 Hectares (Ha), located off Charles Street, Darwen. The site is mainly grassed and contains a number of immature trees and a footpath linking Charles Street to the Robin Road wildlife site on the opposite side of the River Darwen, which forms the north east boundary of the site. The site also includes a section of the hardstanding that provides vehicular access to commercial units located to the east of Duckworth Street.
3.1.2 The area is generally defined as mixed use in character, comprised of a range of commercial and residential uses.
3.1.3 Site Photographs 3.2 Proposed Development
3.2.1 Planning permission is sought for the change of use of the land from open space to a parking area, constructed with compacted stone. The proposal is to serve the existing business located immediately to the northwest of the site.
3.2.2 The proposal also provides for alterations to the position of the footpath crossing the site, new weld mesh boundary fencing, replacement access gates fronting Charles Street and provision of secondary gates within the hardstanding area serving the existing business uses.
Fig 1: Proposed Site Plan 3.2 Development Plan
3.3.1 Section 38(6) of the Planning and Compulsory Purchase Act 2004 requires that determination of planning applications must be made in accordance with the Development Plan unless material considerations indicate otherwise.
3.3.2 For the purpose of this assessment, the Development Plan comprises the Blackburn with Darwen Borough Council Local Plan 2021 – 2037 (adopted January 2024). The following policies of the Local plan are of relevance; • Policy CP1: A Balanced Growth Strategy • Policy CP2: The Spatial Approach • Policy CP6: The Natural Environment • Policy CP9: Transport and Accessibility • Policy CP10: The Economy and Skills
• Policy DM02: Protecting Living and Working Environments • Policy DM13: Flooding / SuDS • Policy DM15: Biodiversity • Policy DM17: Trees and Woodland • Policy DM19: Development of Open Spaces • Policy DM27: Design in New Developments • Policy DM29: Transport and Accessibility
3.4Other Material Planning Considerations
3.4.1 National Planning Policy Framework (The Framework).
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Planning and Highways Committee at Blackburn with Darwen and we tell you when its next papers are published, before the meeting rather than after it.
Planning Items for DeterminationThat the committee considered the updated reports of the Strategic Director (Growth and Development) which detailed t...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.