Resolved
Decision under Town and Country Planning Acts and Regulations – RESOLVED – Approved subject to the conditions highlighted in the Director’s Report and the amended conditions 20, 21 and 22 of 10/20/0716 (as detailed 3.2.2 of the main report) in the Update Report as follows: 20) The development hereby approved shall be undertaken in strict accordance with the flood exceedance routing detailed on drawings 2295- SCE-00DR-C-0010.1-P04 and 2295-SCE-00DR-C-0010.2-P04, received 16th January 2025. Notwithstanding that requirement, within 3 months of the date of this permission, a scheme detailing the exceedance flow route from the attenuation pond, in the event of an overflow, shall be submitted to and approved in writing. The development shall be in accordance with the agreed details. REASON: To ensure that the development is not at risk of flooding and does not increase flood risk elsewhere, and that adequate measures are put in place for the disposal of foul and surface water in accordance with the requirements of Policy DM13 of the Blackburn with Darwen Borough Local Plan Part 2021-2037, and the National Planning Policy Framework. 21) The foul and surface water drainage of the site shall be undertaken in strict accordance with the following details; 2295-SCE-00-00-DR-C-0016.01-P14; received 14th April 2025 2295-SCE-00-00-DR-C-0016.02-P14; received 14th April 2025 Surface Manhole Schedule Sheet 1 of 3 Drawing Ref: 2295-SCE-00- 00-DR-C-0021.1-P03-1 to 20; received 16th January 2025 Surface Manhole Schedule Sheet 2 of 3 Drawing Ref: 2295-SCE-00- 00-DR-C-0021.2-P03-1 to 20; received 16th January 2025 Surface Manhole Schedule Sheet 3 of 3 Drawing Ref: 2295-SCE-00- 00-DR-C-0021.3-P05-1 to 20; received 16th April 2025 Foul Manhole Schedule Sheet 1 of 2 Drawing Ref: 2295-SCE-00-00- DR-C-0020.1-P04-1 to 20; received 16th January 2025 Foul Manhole Schedule Sheet 2 of 2 Drawing Ref: 2295-SCE-00-00- DR-C-0020.2-P04-1 to 20; received 16th January 2025 2295- SCE-00-00-DR-C-0006-P01; received 16th January 2025 Attenuation Pond Details: 2295-SCE-00-00-DR-C-0007-P07; received 16th April 2025 Design Drawing Ref SHE-0217-2830-2000-2830; received 16th January 2025 Design Drawing Ref SHE-0145-1100-1500-1100; received 16th January 2025 SW Hydraulic Calculations; received 16th January 2025. REASON: To ensure the development is not at risk of flooding and does not increase flood risk elsewhere, and that adequate measures are in place for the disposal of foul and surface water, in accordance with Policy DM13 of the Blackburn with Darwen Borough Local Plan 2021-2037. 22) The management and maintenance of the sustainable drainage system shall be undertaken for the lifetime of the development in accordance with the following details: Drainage Asset Maintenance Document- P02; received 16th January 2025. REASON: To ensure that appropriate ... view the full minutes text for item 4.3