Resolved
RESOLVED that the report be accepted and the information contained therein be noted.
Planning Committee noted this item on Thursday 12 January 2023. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED that the report be accepted and the information contained therein be noted.
Developments of National Significance (DNS) The Planning (Wales) Act 2015 and the Developments of National Significance (Wales) Regulations 2016 (as amended) and subsequent regulations, provides the statutory basis for DNS. Any proposal to construct or operate a power generation scheme with a capacity greater than 10 MW falls within the DNS system and requires Welsh Ministers consent. All energy generation projects between 10 MW and 350 MW, including overhead electric lines of up to 132 kV which are associated with a devolved generation station, are considered a DNS project. The Local Planning Authority have been consulted on the following DNS applications. Some of which straddle other Local Authority areas such as Torfaen and Caerphilly. Mynydd Carn y Cefn – REF CON 2021/0004 Status: Application Start Date 23.11.22 The Site lies within the Blaenau Gwent County Borough Council administrative area and its boundary is located approximately 500m from the western edge of Abertillery. The eastern section of the Site is separated from the town’s western boundary by a 200-300m buffer of mature trees. The Site is accessed from a forestry haul road which is taken off the A4046 Aberbeeg Road.
The Proposed Development site compromises a mix of semi-improved and unimproved grassland which forms the southern end of a forked upland ridge between the Ebbw Fawr valley and the Ebbw Fach valley. The Site is split by a forestry haul road, woodland and an operational solar farm.
The Mynydd Carn y Cefn Wind Farm (‘the Proposed Development’) consists of the following elements:
up to eight wind turbines with heights to blade tip in a range of between 170-180m and a combined maximum rated output of up to 48MW of electrical power; substation and transformer housing; temporary construction compound; temporary site offices; crane pads and cabling; and access track construction. Mynydd Llanhilleth – REF CON 2021/0005 Status: Pre-Application Statutory Consultation (PAC) - The site is located to the south-east of Abertillery and to the east of Llanhilleth and has a developable site area of approximately 193 hectares. The site spans across two Local Planning Authorities with the majority falling within Torfaen County Borough (TCBC) and the remainder of the site (to the west) being located within Blaenau Gwent. Access into the site is proposed from the existing road through the common coming from a north westerly direction from Talywain. The proposal includes: Up to 12 wind turbines, anticipated to be 4–6MW each with an indicative height of up to 180m to tip together with external transformer housing; Turbine foundations, crane pads and laydown areas; An electrical substation and control building; Underground power cables linking the turbines and the on-site substation; Construction of access tracks off main access corridor; Permanent anemometer mast for wind turbine performance monitoring; Construction enabling works; and A temporary construction and storage compound Manmoel Wind Farm – CON 2021/0006
Status: Pre-application Engagement The site is situated mostly within the Blaenau Gwent County Borough Council (BGCBC) area, although its south-western corner lies within the Caerphilly County Borough Council (CCBC) local authority boundary. The southern half of the site is in one of the Future Wales - Pre-assessed Areas (FWPAA). The site lies within registered Commons Land.
At this stage, the project is envisaged as comprising:
up to 5 turbines of up to 180m maximum tip height and associated crane hardstandings; transformers housed adjacent to or in turbines; onsite access tracks plus underground cable runs alongside; an onsite sub-station building; construction compound(s); borrow pits; and access into the site boundary. Abertillery Wind Farm – REF CON 2021/0007
Status: Scoping Completed. Anemometer mast approved for 5 years
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Developments of National Significance Applications UpdateReport | 732 KB | DownloadRead as text |
Follow Planning Committee at Blaenau Gwent and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 9 Sep 2026 | Planning Applications ReportRESOLVED that Planning permission be GRANTED subject to the conditions detailed in the report. As a Ward Member for t... | Decided | Open |
| 9 Sep 2026 | Appeals, Consultations and DNS Update September 2026RESOLVED that the report be accepted and the information contained therein be noted. | Noted | Open |
| 9 Sep 2026 | Appeal Update Report – 2 Zion Street, Briery Hill, Ebbw ValeRESOLVED that the report be accepted and the attached appeal decision by PEDW be noted. | Noted | Open |
| 9 Sep 2026 | Planning Appeal Update: Endsleigh, Alma Terrace, Brynmawr.RESOLVED that the report be accepted and the attached appeal decision by PEDW be noted. | Noted | Open |
| 9 Sep 2026 | List of determined applications between 19th June 2026 – 28th August 2026RESOLVED that the report be accepted and the information contained therein be noted. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.