Blaenau Gwent County Borough Council
Planning Committee, Thursday 6 February 2025 at 2.00pm

Planning Applications Report

Decided Planning 1 paper

Planning Committee decided this item on Thursday 6 February 2025. Below is the council's own wording, with the papers it was decided on.

Item5

Resolved

RESOLVED that planning permission be GRANTED subject to the conditions detailed in the report and delegated powers be granted to Planning Officers to amend the wording of the conditions as necessary.
Word for word from the decision Blaenau Gwent published for this meeting. Source: democracy.blaenau-gwent.gov.uk

Follow this further

Built from Blaenau Gwent's papers

What the report saysPro

Report to Planning Committee

Report Date: 27th January 2025 Report Author:

BLAENAU GWENT COUNTY BOROUGH COUNCIL

Report to The Chair and Members of Planning, Regulatory and General Licensing

Report Subject Planning Applications Report

Report Author Team Manager Development Management

Report Date 27th January 2025

Directorate Regeneration & Community Services

Date of meeting 6th February 2025

Report Information Summary

1. Purpose of Report To present planning applications for consideration and determination by Members of the Planning Committee. 2. Scope of the Report Application Address No. C/2023/0212 Penrhiwgwaith Farm, Pen-Rhiw-Gwaith Lane, Hollybush Blackwood, NP12 0ST

3. Recommendation/s for Consideration Please refer to individual reports Report Date: 27th January 2025 Report Author:

Planning Report

Application C/2023/0212 App Type: Full No: Applicant: Agent: [name removed] S Hayle Penrhiwgwaith Farm, Axis Pen-Rhiw-Gwaith Lane Unit 11, Well House Barns Hollybush Chester Road Blackwood. Bretton, Chester NP12 0ST CH4 0DH Site Address: Penrhiwgwaith Farm, Pen-Rhiw-Gwaith Lane, Hollybush Blackwood, NP12 0ST Development: Installation of a wind turbine and associated infrastructure including the turbine foundation, crane hardstanding/laydown area, improvement to existing access track, transformer container and associated cabling

Fig. 1- Google ariel image and site location 1.0 Background, Development and Site Context Report Date: 27th January 2025 Report Author:

1.1This application seeks full planning permission for the development of a wind turbine and associated works on land forming part of Penrhiwgwaith Farm, Holly Bush, Blackwood. The site already benefits from a 500KW wind turbine generator together with 11KV Substation/ transformer house that was approved under application C/2012/0373 on 17/07/2013. This existing turbine is positioned approximately 160m to the north-west of the application site. The application site is immediately adjacent to the county boundary.

1.2The proposal comprises a single turbine with a hub height of up to 60m and a maximum blade tip height of up to 86.5m, with associated infrastructure including foundations, crane hardstanding/ laydown area, transformer container and associated cabling. The turbine would have an installed capacity of approximately 800kW.

Fig 2. Elevations of the proposed turbine.

1.3The development would be accessed via the existing track which would be extended by approximately 57m into the host field. A hardstanding with an area of approximately 500sq.m and a transformer container measuring 3.1m wide, 2.5m deep and 2.3m high would be developed immediately adjacent to the turbine base. The container would be of a steel or glass reinforced plastic (GRP) construction, in a dark green finish. The container would house the transformer, switch gear and other associated electrical equipment. Cabling from the turbine to the transformer would pass below the turbine foundation Report Date: 27th January 2025 Report Author:

and alongside the existing and proposed access track in a duct. Western Power Distribution (WPD) would be responsible for connecting the turbine to their distribution network.

Fig 3. Proposed site layout plan

1.4The turbine would be delivered in component form via 9 separate loads, several of which would need to be delivered under escort as they would be deemed an abnormal load. It is anticipated that the components would likely be docked in Swansea with the transport delivery route being via the M4, A465(T), the B4257 through Rhymney and the B4256 onto and south along the common. Report Date: 27th January 2025 Report Author:

Fig 4. Anticipated delivery route.

1.5It is anticipated that the development would have an operational lifetime of 25- 30 years.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Planning Applications ReportReport 922 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

17 of 23 attended
LW
Councillor Lisa WinnettChair, present
PB
Councillor Peter BaldwinVice-Chair, absent
MD
Councillor Malcolm DayCommittee Member, present
WH
Councillor Wayne HodginsCommittee Member, apologies
JH
Councillor Julie HoltCommittee Member, present
GH
Councillor George HumphreysCommittee Member, present
EJ
Councillor Ellen JonesCommittee Member, present
JM
Councillor Jonathan MillardCommittee Member, present
JM
Councillor Jen Morgan, J.P.Committee Member, apologies
LP
Councillor Lee ParsonsCommittee Member, present
DR
Councillor Diane RowberryCommittee Member, absent
CS
Councillor Chris SmithCommittee Member, present

All 23 on the meeting page

On this subject at Blaenau Gwent

Search all
  1. Planning Applications ReportThis decision
  2. Planning Applications ReportDecided
  3. Planning Applications ReportDecided
  4. Planning Applications ReportDecided
  5. Planning Applications ReportAgreed
  6. Planning Applications ReportRefused

More from Blaenau Gwent Planning Committee

All decisions
MeetingDecisionOutcome
9 Sep 2026 Planning Applications ReportRESOLVED that Planning permission be GRANTED subject to the conditions detailed in the report. As a Ward Member for t... Decided Open
9 Sep 2026 Appeals, Consultations and DNS Update September 2026RESOLVED that the report be accepted and the information contained therein be noted. Noted Open
9 Sep 2026 Appeal Update Report – 2 Zion Street, Briery Hill, Ebbw ValeRESOLVED that the report be accepted and the attached appeal decision by PEDW be noted. Noted Open
9 Sep 2026 Planning Appeal Update: Endsleigh, Alma Terrace, Brynmawr.RESOLVED that the report be accepted and the attached appeal decision by PEDW be noted. Noted Open
9 Sep 2026 List of determined applications between 19th June 2026 – 28th August 2026RESOLVED that the report be accepted and the information contained therein be noted. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies