Resolved
RESOLVED that the report be accepted and the information contained therein be noted.
Planning Committee noted this item on Thursday 2 October 2025. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED that the report be accepted and the information contained therein be noted.
01495 364847 [email protected]
P/2024/0323 3278009
Planning and Environment Decision Wales Crown Building Cathays Park Cardiff CF10 3NQ
21 August 2025
Dear Sir/ Madam,
Town and Country Planning Act 1990 (as amended) (‘the 1990 Act’) The Developments of National Significance (Wales) Regulations 2016 (as amended) (‘the DNS Regulations’) The Developments of National Significance (Procedure) (Wales) Order 2016 (as amended) (‘the DNS Procedure Order’)
Application by: RWE Renewables Site Address: Upland moorland located between Abertillery to the West and Abersychan to the East, approximately 1.5km North-East of Abertillery (Abertillery Wind Farm) Proposed development: Up to six turbines and associated infrastructure including transformers, foundations, crane pads and laydown / storage areas.
I write in relation to the above DNS submission and further to your letter dated 23rd July 2025.
Following consultation and review of the following documents:
2025-07-14 – Additional Information – Response Additional Information – Visualisations Additional Information - Appendix
Blaenau Gwent County Borough Council request the Inspector take the following response into consideration:
Access and Transportation: The Council’s Highway Authority have advised : “The submitted drawing, reference ‘Appendix AI 1.2 – Access Junction General Arrangement’ indicates a proposed junction arrangement to accommodate both construction traffic associated with the development and walkers/cyclists accessing the national cycle route.
The proposed layout indicates the introduction of an advisory shared cycle lane/path, using an existing section of highway verge along the northern kerb-line of Blaenafon Road. The highway verge at this location has been checked and measures 1.3m wide; this is unsuitable to accommodate a shared surface for cyclists/pedestrians. In accordance with Active Travel standards a minimum shared footway width of 2.5m must be achieved.
The scheme also proposes the introduction of bollards at the junction. These bollards will restrict the available ‘Overrun’ area that has been identified to accommodate wind turbine AIL turning movements. The applicant should confirm how AIL movements will be accommodated. There are bollards proposed immediately adjacent to an existing gated access for the movement of sheep/cattle; it is unclear if the installation of bollards would obstruct the gate.
It is the opinion of the highway authority that the junction design does not provide a satisfactory safe route for vulnerable road users and the potential of conflict with development traffic has not been mitigated. The junction arrangement needs to be redesigned and be subject to a highway safety audit process.”
Heritage Assets: The Council highlighted the concerns of Heneb (formerly GGAT) within the LIR, which requested further information in the form of a field evaluation (trial trenching) prior to determination.
It is noted that the applicant has advised that a geophysical survey was attempted in May 2025, as a form of non-intrusive archaeological but that that the survey was unsuccessful.
Heneb have reviewed the additional information and have advised:
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Abertillery Wind Farm: Response to PEDW on additional information.pdfReport | 478 KB | DownloadRead as text |
PDF |
Appeals, Consultations and DNS Update October 2025Report | 278 KB | Download |
PDF |
LIR Mynydd Llanhilleth RESUBMISSION CAS-03540-M8J8M5.pdfReport | 817 KB | Download |
Follow Planning Committee at Blaenau Gwent and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 9 Sep 2026 | Planning Applications ReportRESOLVED that Planning permission be GRANTED subject to the conditions detailed in the report. As a Ward Member for t... | Decided | Open |
| 9 Sep 2026 | Appeals, Consultations and DNS Update September 2026RESOLVED that the report be accepted and the information contained therein be noted. | Noted | Open |
| 9 Sep 2026 | Appeal Update Report – 2 Zion Street, Briery Hill, Ebbw ValeRESOLVED that the report be accepted and the attached appeal decision by PEDW be noted. | Noted | Open |
| 9 Sep 2026 | Planning Appeal Update: Endsleigh, Alma Terrace, Brynmawr.RESOLVED that the report be accepted and the attached appeal decision by PEDW be noted. | Noted | Open |
| 9 Sep 2026 | List of determined applications between 19th June 2026 – 28th August 2026RESOLVED that the report be accepted and the information contained therein be noted. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.