RESOLVED that the application be granted planning permission, in line with the recommendations as set out in the report, for the following reasons: Voting: For – 11 Against – 0 Abstain – 1 NOTE: Cllr M Davies missed part of the presentation, public statements and debate due to technical issues and therefore did not vote on this item.
Word for word from the decision Bournemouth, Christchurch and Poole published for this meeting.Source: democracy.bcpcouncil.gov.uk
Follow this further
Built from Bournemouth, Christchurch and Poole's papers
Proposal Demolition of four buildings (public toilet block, a former beach office, a storage block and a portacabin block) and eleven beach huts. Construction of a new 2 storey Environmental Education Visitor Centre, staff welfare building, Cafe and replacement Public WCs- Regulation 3
Application Number 7-2020-18384-S
Applicant BCP Council
Agent Footprint Architects Ltd
Date Application Valid 23 July 2020
Ward Westbourne & West Cliff
Report Status Public
Meeting Date 5th November 2020
Recommendation Grant in line with recommendations below
Reason for Referral to In the wider public interest as the development is in a Planning Committee sensitive seafront location.
Case Officer JGH
Description of Development
1. Planning consent is sought for the demolition of four buildings that include a public toilet block, a former beach office, a storage block and a portable cabin block, and eleven beach huts. The construction of a two storey environmental education visitor centre is proposed with a staff welfare area, a kiosk and replacement public WCs.
2. The applicant has provided the following information:
On the 13th October amended plans were received with revised floor plans and elevations due to an error with a survey requiring a small amendment to the positioning of the building.
3. Overview:
Existing Proposed Use Four buildings comprising of the An environmental education visitors lifeguard station, storage, centre including a café, replacement Public W/Cs and 11 beach huts public WCs, staff welfare centre, classrooms, storage. Height Single storey Welfare and education building: 4.5m Eaves of the canopy: 2.2m Maximum height of sedum roof: 3.7m Toilet block – 2m Width Lifeguard building: 14.5m Welfare and education building: 5.3m RLNI building: 7.7 Canopy: 13m WCs: 4m Storage buildings within the yard – 6m Storage: 5.5m Toilet block – 10.5m Depth Lifeguard building: 3m A maximum of 12m from the rear RLNI bulding: 3.7m retaining wall. WCs: 21m Storage buildings within the yard – 20m Storage: 5m Toilet block – 3m Kiosk 15m² Cycle 22 cycle spaces in the public area (20m² parking dedicated area), 6 staff cycle spaces within a lockable cycle store accessed via the yard.
Key Issues
4. The main considerations involved with this application are:
Impact on character and appearance of the seafront; Flood risk; Cliff stability; Impact on ecology; SUDs; Potential contamination; Impact on the highway; Sustainability; Security; Planning balance.
5. These points will be discussed as well as other material considerations at paragraphs 12 to 49 below.
Page 2 Planning Policies
6. Core Strategy (2012)
CS1: Sustainable Development CS2: Sustainable Homes and Premises CS3: Sustainable Energy and Heat CS4: Surface Water Flooding CS6: Delivering Sustainable Communities CS18: Increasing Opportunities for Cycling and Walking CS30: Promoting Green Infrastructure CS34: Sites of Special Scientific Interest CS35 Nature and Geological Conservation Interests CS38: Minimising Pollution CS41: Design Quality
7. District Wide Local Plan (2002)
3.20: Contamination 3.25: Land Stability 3.28: Flooding 4.25: Trees and landscaping
8. Supplementary Planning Documents:
Sustainable Urban Drainage Systems (SUDS) - PGN Bournemouth Parking – SPD The Bournemouth Borough Council Seafront Strategy 2007. Relevant aims: 1. Creating a more environmentally sustainable seafront; 2. Achieving reinvestment, economic regeneration and a sustainable product; 3. Delivering truly memorable customer experiences;
9. The National Planning Policy Framework (2019)
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Planning Committee at Bournemouth, Christchurch and Poole and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.