Resolved that the application be delegated to the Head of Planning to grant planning permission subject to the conditions as set out in the report and updated in the Addendum Sheet (and any amendments to those conditions as deemed necessary). Voting: Unanimous
Word for word from the decision Bournemouth, Christchurch and Poole published for this meeting.Source: democracy.bcpcouncil.gov.uk
Follow this further
Built from Bournemouth, Christchurch and Poole's papers
Copyright. All rights reserved This work is copyright and cannot be produced or copied in any form or by any means (graphic, electronic or mechanical including photocopying) without written permission of the
58 Issues originator. Any license, express or implied, to use this document for any purpose 47 whatsoever is restricted to the terms of the agreement or implied agreement between the originator and the instructing party.
37a Sinks DO NOT SCALE FROM THIS DRAWING. WORK ONLY FROM FIGURED DIMENSIONS.
60 1to4 Issues THIS DRAWING TO BE READ IN CONJUNCTION WITH RELEVANT CONSULTANTS DRAWINGS. Posts REVISION DATE DESCRIPTION DRAWN CHK/AP
37 LB P1 12.08.22 For Client Information & Comment AC YO/BW P2 12.09.22 For Planning AG YO/BW 5to8 62 1 P3 14.12.22 Issued as WIP. Boundary Line Updated AN YO/BW 36.0m P4 15.12.22 Issued for Planning. Boundary Line Revised. AN YO/BW Heat Pump Location Added. Facade Revised. 34.1m P5 16.12.22 Issued for Planning. Boundary Line Revised. AN YO/BW 10 to 20 1 to 9 21 to 28 64
36.0m 1 1 to Sinks Mayfair 7 WA RR 9 EN AD R OA LEY RO GROVE D 39
1 to 12 15 1 to 6 41 66 1 to 7
Posts 3
1 FB Post 68
8 AD RO Hall 1 to
Shelter Y 43
UR 9
DR 1
37.5m TCB FB Vicarage
OAD OKE R 2 PEMBR 32.9m 2 1 to 14
68 47 72
Nightingale Court 74
66 49
1 to 8 1 5
Alum 35.7m ALUMHURST ROAD
KEY:
Chin 36.9m 1 to 12 2 Cedar Court PROPERTY LINE & PROPOSED
e 1 to 3 DEVELOPMENT 6 31.1m PROPOSED BUILDING FOOTPRINT 6a El Sub Sta 76 4 to 7 2 1 3
53 55
4 Northington Street London, WC1N 2JG +44 (0)207 490 1904 www.medicalarchitecture.com [email removed] 1 to 10
CLIENT DHUFT
WEST 17
15 PROJECT
OVER CAMHS PICU Seastone
CLIF 1
F DRAWING TITLE 22 Planning - Location Plan
DRIV 20
E 1 PROJECT NUMBER SCALE @ A3 SUITABILITY REVISION DATE 18 964 1:1250 S4 16.12.22 63
D 30.5m ROAD ROA DENE UNT S OME EMO BRANK 2 LB ROS DRAWING NUMBER REVISION
CAMU-MAA-ZZ-XX-PL-A-0001 P5 Copyright. All rights reserved This work is copyright and cannot be produced or copied in any form or by any means (graphic, electronic or mechanical including photocopying) without written permission of the originator. Any license, express or implied, to use this document for any purpose whatsoever is restricted to the terms of the agreement or implied agreement between the originator and the instructing party.
DO NOT SCALE FROM THIS DRAWING. WORK ONLY FROM FIGURED DIMENSIONS. THIS DRAWING TO BE READ IN CONJUNCTION WITH RELEVANT CONSULTANTS DRAWINGS. REVISION DATE DESCRIPTION DRAWN CHK/AP
P1 12.08.22 For Client Information & Comment AC YO/BW P2 12.09.22 For Planning AG YO/BW P3 14.12.22 Issued as WIP. Boundary Line Updated AN YO/BW P4 15.12.22 Issued for Planning. Boundary Line Revised. Heat AN YO/BW Pump Location Added. Facade Revised. P5 16.12.22 Issued for Planning. Boundary Line Revised. AN YO/BW
1 to 1
8 35 AD RO
.7 T
m RS HU
El 55 UM AL
Su 1 to 14
b 74 AL
Sta UM HU RS TR 72 OA D
37 m .5 49 53
LODGE R OS
47 E
Lo
TC MOUN
dg
B e T ROA
43 D
GRAVEL
2 SURFACE 1 to 9
GRASS SURFACE EMERGENCY GENERATOR & SUBSTATION
DEMOLISHED PAVILLION GREENHOUSES
DRU RY R
1 OAD GRAVEL PARKING SURFACE
3 SHEDS
8 15
NIGHTINGALE HOUSE
SUBSTATION ELECTRICITY BUILDING KEY:
PROJECT BOUNDARY & PROPOSED DEVELOPMENT PEBBLE LODGE PARKING
PROJECT NUMBER SCALE @ A1 SUITABILITY REVISION DATE 964 1:500 S4 16.12.22 DRAWING NUMBER REVISION CAMU-MAA-ZZ-XX-PL-A-0002 P5 Copyright. All rights reserved This work is copyright and cannot be produced or copied in any form or by any means (graphic, electronic or mechanical including photocopying) without written permission of the originator. Any license, express or implied, to use this document for any purpose whatsoever is restricted to the terms of the agreement or implied agreement between the originator and the instructing party.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Planning Committee at Bournemouth, Christchurch and Poole and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.