Resolved

RESOLVED that planning permission be G RANTED in accordance with the recommendation set out in the Officer’s report as updated by the Committee Addendum Sheet. Voting: For – 6, Against – 5, Abstain – 0 Notes: Cllr D Flagg did not take part in this item as he had been prevented from attending the Committee Site Visit held on 16 August due to a delayed train. The Chair subsequently clarified the voting figures to confirm that Cllr Flagg had not taken part rather than abstaining from the vote. Cllr Dr F Rice left the meeting at the end of this item.
Word for word from the decision Bournemouth, Christchurch and Poole published for this meeting. Source: democracy.bcpcouncil.gov.uk

Follow this further

Built from Bournemouth, Christchurch and Poole's papers

What the report saysPro

Report to Planning Committee

Planning Committee

Application Address The Quay Thistle Hotel, The Quay, Poole, BH15 1HD Proposal Demolition of the existing hotel building and redevelopment to provide a mixed use scheme of five buildings providing flexible commercial units at ground floor with 179 residential units above and a hotel with ancillary bar/restaurant, plus basement level car parking, cycle parking, hard and soft landscaping, revised access and associated works. Application Number APP/23/00011/F Applicant MHA Burleigh Poole (Propco) Ltd Agent Montagu Evans Date Application Valid 1 February, 2023 Ward and Ward Poole Town Member(s)

Members: • Cllr Sue Aitkenhead • Cllr Andy Hadley • Cllr Mark Howell Summary of Grant planning permission, subject to the recommended Recommendation conditions and planning obligations, for the reasons set out in this report.

Reason for Referral to Applications where the Council is the applicant or landowner Planning Committee for major development proposals as defined in the Development Management Procedures Order in accordance with Paragraph 2.2.4 of Part 3, Section 2 of BCP Council’s Constitution. and Applications where there have been 20 or more representations from third parties that count toward that number in accordance with Paragraph 2.2.8 of Part 3, Section 2 of BCP Council’s Constitution. Case Officer Gareth Ball

1 1 DESCRIPTION OF PROPOSAL

1.1Proposal

1.1.1 Full planning permission is sought for the demolition of the existing 70-bedroom hotel and all ancillary structures on the Site and the construction of five buildings (ranging between three to seven storeys) to provide a 146-bedroom hotel, 179 residential flats and two commercial units at ground floor.

1.1.2 A plan demonstrating the location of the proposed uses is provided in Figure 2 of this report. Blocks A to D are residential uses. Blocks B and C have commercial use on the ground floor.

1.1.3 The application follows a recent proposal on the site seeking a 118 bedroom hotel, 228 flats and three commercial units which was refused at committee and dismissed at appeal.

1.1.4 The proposal would have multiple public pedestrian access points, from The Quay, East Quay Road in the northwest and Ballard Road in the northeast. Ballard Road would provide the only vehicle access to the Site. The proposal would provide a pedestrian route through the Site, linking The Quay with East Quay Road.

1.1.5 The 179 residential units are proposed in the following size mix:

• 65 x one bed units (36 per cent) • 104 x two bed units (58 per cent) • 10 x three bed units (6 per cent)

1.1.6 Extensive landscaping is proposed within the Site. No protected trees would be removed. 32 other trees would be removed, with 206 new trees being planted in replacement.

1.1.7 The proposal would be constructed across three phases comprising:

• Phase 1 - Demolition and excavation • Phase 2 - Construction of podium level and site access • Phase 3 - Construction of residential and hotel blocks (including landscaping)

1.1.8 The residential and commercial elements of the proposal would not have any dedicated car parking. The hotel would be provided with 73 car parking spaces within a basement. A policy-compliant number of 316 cycle parking spaces would be provided to the uses within the proposal, located across the basement and ground floor levels. Two residential car club spaces would be provided offsite.

1.1.9 The proposed design utilises two main front blocks within the centre of the Site on Poole Quay, a shorter block on the west, a perpendicular block to the north at the rear of the Site and the hotel block located in the east. CGI images of the proposed scheme are provided below:

2 Figure 1 Proposed scheme viewed from the south

Figure 2 Proposed block layout

1.1.10 A phasing plan of the proposal are provided in Appendix 1

1.2Revised Plans

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Quay Thistle Hotel combined plans (1)Plan 18 MB Download
PDF
Quay Thistle Hotel, The Quay, Poole BH15 1HDReport 4.8 MB DownloadRead as text

At this meeting

Whole meeting

Who was there

14 of 18 attended
P
Presentthe member of the committee was present as expected at the meeting
A
Apologiesthe member of the committee was unable to attend and reported their apologies in advance (substitute
A
Absentthe member of the committee was not present and did not apologise for their absence
IA
In attendancea councillor, who was not a member of the committee, was also in attendance
ML
Councillor Marion Le PoidevinChair, present
PH
Councillor Paul HilliardVice-Chair, present
CA
Councillor Cameron AdamsCommittee Member, present
SC
Councillor Sharon Carr-BrownCommittee Member, present
JC
Councillor Jo ClementsCommittee Member, present
JC
Councillor John ChallinorCommittee Member, apologies
DF
Councillor David FlaggCommittee Member, present
MG
Councillor Matthew GillettCommittee Member, apologies

All 18 on the meeting page

On this subject at Bournemouth, Christchurch and Poole

Search all
  1. Quay Thistle Hotel, The Quay, Poole BH15 1HDThis decision
  2. Quay Thistle, The Quay, Poole, BH15 1HDRefused

More from Bournemouth, Christchurch and Poole Planning Committee

All decisions
MeetingDecisionOutcome
18 Apr 2024 Hawkwood Road Main Car Park, car park rear of 629-633 Christchurch Road and 625 Christchurch Road, Boscombe, Bournemouth BH5 1BYResolved to GRANT permission in accordance with the recommendation and reasons set out in the officer’s report, but s... Agreed Open
18 Apr 2024 56A and 58 Danecourt Road, Poole BH14 0PQRESOLVED to REFUSE permission in accordance with the recommendation and reasons set out in the officer’s report: Voti... Refused Open
18 Apr 2024 Tayfield House, 38 Poole Road, Bournemouth BH4 9DWRESOLVED to GRANT permission in accordance with the recommendation and reasons set out in the officer’s report as upd... Agreed Open
18 Apr 2024 506-508 Charminster Road, Bournemouth BH8 9SJRESOLVED to GRANT permission in accordance with the recommendation and reasons set out in the officer’s report. Votin... Decided Open
18 Apr 2024 Clubhouse, Christchurch Sailing Club, Wick Lane, Christchurch BH23 1BYRESOLVED to GRANT permission in accordance with the recommendation and reasons set out in the officer’s report. Votin... Decided Open