15 items, 20 papersPapers appear here as the council publishes them.
1 item with exempt partsAnnual Report of Internal Audit Counter Fraud Work and Whistleblowing Referrals 2024/25 may be taken in private.
This meeting was held16 October 2025
15items
20papers
9decisions
1exempt
Running order, sized by papersItem 40 to 54
ReportsProcedureExempt parts

AI summaryWhat Audit and Governance Committee decided

Checked against 16 papers PDF briefing Pro
9decisions 6agreed1approved1noted 2with money Topicsgovernance, finance, procurement, community safety
46
Agreed
External Auditor – Audit Progress & Sector UpdateAudit and Governance Committee noted Grant Thornton's progress update on the 2024/25 external audit, with the Audit Findings Report and Value for Money findings due at the November meeting.
–
Read in full
47
Agreed
Treasury Management Monitoring update for Quarter 2 2025/26Bournemouth, Christchurch and Poole Council's Audit and Governance Committee noted treasury management activity for April to September 2025, with a forecast underspend of £0.3m.
£0.3mQ2 2025/26 underspend forecast
Read in full
48
Agreed
Procurement and Contract Management - Delivery Plan Progress ReportAudit and Governance Committee notes progress on BCP Procurement and Contract Management Strategy 2024 to 2028, with 29 of 57 commitments completed, and delegates target-setting for nine measures to the Procurement Board.
–
Read in full
49
Agreed
Risk Management - Corporate Risk Register UpdateBCP Council's Audit and Governance Committee noted the latest Corporate Risk Register update, including a lower children and safeguarding risk score, a higher budget risk target, and a new Local Plan risk.
–
Read in full
50
Agreed
Health and Safety UpdateBCP Council's Audit and Governance Committee noted continued progress on Health and Safety governance and agreed to keep receiving annual updates.
–
Read in full
51
Agreed
Emergency planning and business continuity annual reportBCP Council's Audit and Governance Committee noted the annual emergency planning and business continuity report, including improved team resourcing and the national resilience context. The item was agreed with no dissent.
–
Read in full
52
Decided
Internal Audit – Quarterly Audit Plan UpdateThe Audit and Governance Committee noted second quarter progress on the 2025/26 Internal Audit Plan, with 18 audits finalised. It also asked for further assurance on recommendations originally dated 2024, while the Revenues team recovered £306,425 in council tax yield.
£306,425Additional council tax yield since December 2024
Read in full
53
Noted
Annual Report of Internal Audit Counter Fraud Work and Whistleblowing Referrals 2024/25BCP's Audit and Governance Committee noted Internal Audit's 2024/25 counter fraud work and two whistleblowing referrals, agreeing with no dissent.
–
Read in full
54
Approved
Forward Plan (refresh)Plain-English summary not ready yet. The council's wording: RESOLVED that the Audit & Governance Committee approves the Forward Plan for 2025/26 as set out at Appendix A. Voting: Agreed with no dissent
–
Council decision
Written by AI from the council's own reports and checked against them before publishing. Each decision page shows the sources, paragraph by paragraph.Report a problem

The agenda, item by item

What the committee will consider, in order, with every paper attached to its item.

40
Procedure

Apologies

To receive any apologies for absence from Councillors.

41
Procedure

Substitute Members

To receive information on any changes in the membership of the Committee. Note – When a member of a Committee is unable to attend a meeting of a Committee or Sub-Committee, the relevant Political Group Leader (or their nominated representative) may, by notice to the Monitoring Officer (or their nominated representative) prior to the meeting, appoint a substitute member from within the same Political Group. The...

42
Procedure

Declarations of Interests

Councillors are requested to declare any interests on items included in this agenda. Please refer to the workflow on the preceding page for guidance. Declarations received will be reported at the meeting.

43
Report

Confirmation of Minutes

To confirm and sign as a correct record the minutes of the meeting held on 24 July 2025.

PackMinutes Public Pack, 24/07/2025 Audit and Governance CommitteeCopy on its way
44
Report

Action sheet

To consider any outstanding actions from previous meetings.

ReportAction Sheet: Audit and Governance CommitteeCopy on its way
45
Procedure

Public Issues

To receive any public questions, statements or petitions submitted in accordance with the Constitution. Further information on the requirements for submitting these is available to view at the following link:- https://democracy.bcpcouncil.gov.uk/ieListMeetings.aspx?CommitteeID=151&Info=1&bcr=1 The deadline for the submission of public questions is midday on Friday 10 October 2025 [midday 3 clear working days before...

46
Report

External Auditor – Audit Progress & Sector Update

Grant Thornton, as the Council’s appointed External Auditors, have produced a report (Appendix A) which provides an update to Audit & Governance Committee on their progress to date in delivering their responsibilities. The report includes an update on their 2024/25 audit work. Key points of note are: Financial Statements Audit 2024/25 – Grant Thornton aims to present their Audit Findings Report for 2024/25 to the...

Decision: RESOLVED that the Audit & Governance Committee notes the External Auditor’s progress to date in delivering their responsibilities and the sector update provided. Voting: Agreed with no dissent Decision page

AppendixAppendix A: Audit Progress & Sector UpdateCopy on its way
ReportExternal Auditor: Audit Progress & Sector UpdateCopy on its way
47
Report

Treasury Management Monitoring update for Quarter 2 2025/26

The report sets out the quarter two position for 2025/26 which forecasts an underspend of £0.3m due to the Council’s ability to borrow in the local authority market at lower than budgeted interest rates.

Decision: RESOLVED that the Audit and Governance Committee notes the reported activity of the Treasury Management function for April to September 2025. Voting: Agreed with no dissent Decision page

ReportTreasury Management Monitoring update for Quarter 2 2025/26Copy on its way
48
Report

Procurement and Contract Management - Delivery Plan Progress Report

BCP Council’s Head of Procurement and Contract Management has produced a presentation (Appendix A) which provides an update to Audit & Governance Committee on progress to date in delivering BCP’s Procurement and Contract Management Strategy 2024 - 2028. The presentation includes an update on progress made during the first year of delivery of BCP’s Procurement and Contract Management Strategy. Key points of note are...

Decision: RESOLVED that: (i) The Audit & Governance Committee notes progress to date in delivering BCP’s Procurement and Contract Management Strategy 2024 – 2028 and the update provided; (ii) The Audit and Governance Committee agrees the approval mechanism to refine the (9) measures described in Section 5.5 of the Procurement and Contract Management Strategy 2024 – 2028. (iii) The Audit and Governance Committee delegates authority to the Procurement and Contract Management Board to set the targets (for... Decision page

AppendixAppendix A: Delivery Plan Progress Report for Audit and GovernanceCopy on its way
ReportProcurement and Contract Management: Delivery Plan Progress ReportCopy on its way
49
Report

Risk Management - Corporate Risk Register Update

This report updates councillors on the position of the Council’s Corporate Risk Register. The main updates are as follows: The net score for CR02 – We may fail to achieve appropriate outcomes and quality of service for children and young people including potential inadequate safeguarding, has reduced from 12 to 8. The risk CR09 – We may fail to maintain a safe and balanced budget for the delivery of services, and...

Decision: RESOLVED that the Audit and Governance committee notes the update provided in the report relating to corporate risks Voting: Agreed with no dissent Decision page

AppendixAppendix 1: for Risk Management: Corporate Risk Register UpdateCopy on its way
AppendixAppendix 2: for Risk Management: Corporate Risk Register UpdateCopy on its way
AppendixAppendix 3: for Risk Management: Corporate Risk Register UpdateCopy on its way
AppendixAppendix 4: for Risk Management: Corporate Risk Register UpdateCopy on its way
AppendixAppendix 5: for Risk Management: Corporate Risk Register UpdateCopy on its way
ReportRisk Management: Corporate Risk Register UpdateCopy on its way
50
Report

Health and Safety Update

This report details the progress made on the delivery of the Health and Safety governance arrangements for BCP Council and highlights: The implementation of the Governance Framework continues to be embedded and is working effectively. The framework includes the Health and Safety and Fire Safety Board and other meetings at the agreed frequency with generally good attendance.

Decision: RESOLVED that: (a) the Audit and Governance Committee notes the continued progress in implementing the Health and Safety governance arrangements and operational updates; (b) Health and Safety ongoing governance arrangements updates continue to be reported annually to the Audit and Governance Committee. Voting: Agreed with no dissent Decision page

ReportHealth and Safety UpdateCopy on its way
51
Report

Emergency planning and business continuity annual report

Emergency planning and business continuity are statutory duties for BCP Council. This annual monitoring report gives an overview of key activity in relation to these duties over the period concerned and provides assurance to Audit and Governance Committee with regard to these statutory duties.

Decision: RESOLVED that the Audit and Governance Committee notes: (a) the emergency planning and business continuity activity that has taken place during the monitoring period; (b) the improved resourcing position within the Emergency Planning Team which has enabled the team to refocus on the work programme in support of the organisation; (c) the background information on the national context for resilience and how this is likely to direct local level activity. Voting: Agreed with no dissent Decision page

ReportEmergency planning and business continuity annual reportCopy on its way
52
Report

Internal Audit – Quarterly Audit Plan Update

This report details progress made on delivery of the 2025/26 Audit Plan for the 2 nd quarter (July to September 2025 inclusive). The report highlights that: 18 audit assignments have been finalised, including 16 ‘Reasonable’ and two ‘Partial’ audit opinions; 25 audit assignments are in progress, including 3 at draft report stage; Progress against the audit plan is on track and will be materially delivered to support...

Decision: RESOLVED that the Audit and Governance Committee: a) notes progress made and issues arising on the delivery of the 2025/26 Internal Audit Plan and b) notes the explanations provided for non-implemented recommendations (Appendix 1) and requests further explanation and assurance from the Service/Corporate Director for recommendations with the original date in 2024. Voting: Unanimous Decision page

ReportInternal Audit: Quarterly Audit Plan UpdateCopy on its way
53
Exempt parts

Annual Report of Internal Audit Counter Fraud Work and Whistleblowing Referrals 2024/25

This report details counter fraud work carried out by Internal Audit during 2024/25 to provide assurance on the Council’s response to combating fraud and corruption. Internal Audit have investigated all allegations of suspected fraud or financial irregularity in a proportionate manner. Two formal whistleblowing referrals were received and investigated during 2024/25. The BCP Anti-Fraud & Corruption Policy has been...

Decision: RESOLVED that: a) the counter fraud work & investigations carried out by Internal Audit during 2024/25 be noted; b) the whistleblowing referrals received during 2024/25 be noted. Voting: Agreed with no dissent Decision page

ReportAnnual Report of Internal Audit Counter Fraud Work and Whistleblowing Referrals 2024/25Copy on its way
AppendixAppendix B: Anti-Fraud & Corruption Policy (updated September 25)Copy on its way
54
Report

Forward Plan (refresh)

This report sets out the refreshed list of reports to be considered by the Audit & Governance Committee for the 2025/26 municipal year in order to enable it to fulfil its terms of reference.

Decision: RESOLVED that the Audit & Governance Committee approves the Forward Plan for 2025/26 as set out at Appendix A. Voting: Agreed with no dissent Decision page

AppendixAppendix 1: Refreshed Forward Plan 2025/26Copy on its way
ReportForward Plan (refresh)Copy on its way
Read inside all 20 papersPro opens every page, searches every appendix, and keeps the papers if the council removes them.

Every paper for this meeting

All 20 papers in one list, with the item each belongs to, its size, and our copy of it. Download any paper from our archive once signed in; read and search it here with Pro.

PaperSizeOur copy
Minutes Public Pack, 24/07/2025 Audit and Governance CommitteeItem 43, Confirmation of Minutes
Copy queued
Copy on its wayRead here
Action Sheet: Audit and Governance CommitteeItem 44, Action sheet
Copy queued
Copy on its wayRead here
Audit Progress & Sector UpdateAppendix A, item 46, External Auditor – Audit Progress & Sector Update
Copy queued
Copy on its wayRead here
External Auditor: Audit Progress & Sector UpdateItem 46, External Auditor – Audit Progress & Sector Update
Copy queued
Copy on its wayRead here
Treasury Management Monitoring update for Quarter 2 2025/26Item 47, Treasury Management Monitoring update for Quarter 2 2025/26
Copy queued
Copy on its wayRead here
Delivery Plan Progress Report for Audit and GovernanceAppendix A, item 48, Procurement and Contract Management - Delivery Plan Progress Report
Copy queued
Copy on its wayRead here
Procurement and Contract Management: Delivery Plan Progress ReportItem 48, Procurement and Contract Management - Delivery Plan Progress Report
Copy queued
Copy on its wayRead here
for Risk Management: Corporate Risk Register UpdateAppendix 1, item 49, Risk Management - Corporate Risk Register Update
Copy queued
Copy on its wayRead here
for Risk Management: Corporate Risk Register UpdateAppendix 2, item 49, Risk Management - Corporate Risk Register Update
Copy queued
Copy on its wayRead here
for Risk Management: Corporate Risk Register UpdateAppendix 3, item 49, Risk Management - Corporate Risk Register Update
Copy queued
Copy on its wayRead here
for Risk Management: Corporate Risk Register UpdateAppendix 4, item 49, Risk Management - Corporate Risk Register Update
Copy queued
Copy on its wayRead here
for Risk Management: Corporate Risk Register UpdateAppendix 5, item 49, Risk Management - Corporate Risk Register Update
Copy queued
Copy on its wayRead here
Risk Management: Corporate Risk Register UpdateItem 49, Risk Management - Corporate Risk Register Update
Copy queued
Copy on its wayRead here
Health and Safety UpdateItem 50, Health and Safety Update
Copy queued
Copy on its wayRead here
Emergency planning and business continuity annual reportItem 51, Emergency planning and business continuity annual report
Copy queued
Copy on its wayRead here
Internal Audit: Quarterly Audit Plan UpdateItem 52, Internal Audit – Quarterly Audit Plan Update
Copy queued
Copy on its wayRead here
Annual Report of Internal Audit Counter Fraud Work and Whistleblowing Referrals 2024/25Item 53, Annual Report of Internal Audit Counter Fraud Work and Whistleblowing Referrals 2024/25
Copy queued
Copy on its wayRead here
Anti-Fraud & Corruption Policy (updated September 25)Appendix B, item 53, Annual Report of Internal Audit Counter Fraud Work and Whistleblowing Referrals 2024/25
Copy queued
Copy on its wayRead here
Refreshed Forward Plan 2025/26Appendix 1, item 54, Forward Plan (refresh)
Copy queued
Copy on its wayRead here
Forward Plan (refresh)Item 54, Forward Plan (refresh)
Copy queued
Copy on its wayRead here

Last time, and what carried over

The committee last met on 24 September 2025. None of its items return this time; 11 items are new. Point at any item to follow a thread. Procedural items are left out.

Sep24
24 September 20256 items, 2 papers
Held
carried over
Oct16
16 October 202515 items, 20 papers
Held
38
Exclusion of Press and PublicIn relation to the confidential Appendix (Section F of the report) of...
39
PART A - BCP FuturePlaces Investigation Report (Scope items 1 to 4)This report details Part A - BCP FuturePlaces Ltd investigation...
43
Confirmation of MinutesNew this time
44
Action sheetNew this time
46
External Auditor – Audit Progress & Sector UpdateNew this time
47
Treasury Management Monitoring update for Quarter 2 2025/26New this time
48
Procurement and Contract Management - Delivery Plan Progress ReportNew this time
49
Risk Management - Corporate Risk Register UpdateNew this time
50
Health and Safety UpdateNew this time
51
Emergency planning and business continuity annual reportNew this time
52
Internal Audit – Quarterly Audit Plan UpdateNew this time
53
Annual Report of Internal Audit Counter Fraud Work and Whistleblowing Referrals 2024/25New this time
54
Forward Plan (refresh)New this time

The threads

  • No subject from last time returns at this meeting.

Not carried over

Exclusion of Press and Public, PART A - BCP FuturePlaces Investigation Report (Scope items 1 to 4) do not return this time.

See the 24 September meeting

This committee over time

Every Audit and Governance Committee meeting we have read, the dates it has set for the future, and each time those dates have changed.

70 meetings, 2019 to 2027Dot size shows the number of papers
20192021202320252027
HeldThis meeting
MeetingItemsPapers
14 Jan 2027Thursday
0items
0papers
UpcomingOpen
10 Dec 2026Thursday
0items
0papers
UpcomingOpen
15 Oct 2026Thursday
15items
21papers
HeldOpen
3 Sep 2026Thursday
9items
6papers
HeldOpen
30 Jul 2026Thursday
19items
30papers
HeldOpen
16 Jul 2026Thursday
5items
4papers
HeldOpen
28 May 2026Thursday
12items
4papers
HeldOpen
19 Mar 2026Thursday
15items
25papers
HeldOpen
26 Feb 2026Thursday
14items
24papers
HeldOpen
15 Jan 2026Thursday
18items
28papers
HeldOpen
3 Dec 2025Wednesday
6items
3papers
HeldOpen
27 Nov 2025Thursday
8items
12papers
HeldOpen
6 Nov 2025Thursday
6items
3papers
HeldOpen
16 Oct 2025Thursday, this meeting
15items
20papers
24 Sep 2025Wednesday
6items
2papers
HeldOpen
4 Sep 2025Thursday
0items
0papers
HeldOpen
29 May 2025Thursday
12items
10papers
HeldOpen
20 Mar 2025Thursday
12items
24papers
HeldOpen
27 Feb 2025Thursday
10items
15papers
HeldOpen
27 Jan 2025Monday
13items
17papers
HeldOpen
16 Jan 2025Thursday
0items
0papers
HeldOpen
30 May 2024Thursday
11items
7papers
HeldOpen
11 Apr 2024Thursday
11items
17papers
HeldOpen
7 Mar 2024Thursday
8items
11papers
HeldOpen
11 Jan 2024Thursday
13items
15papers
HeldOpen
30 Nov 2023Thursday
8items
7papers
HeldOpen
26 Oct 2023Thursday
14items
16papers
HeldOpen
7 Sep 2023Thursday
7items
5papers
HeldOpen
27 Jul 2023Thursday
18items
20papers
HeldOpen
8 Jun 2023Thursday
0items
0papers
HeldOpen
13 Apr 2023Thursday
0items
0papers
HeldOpen
9 Mar 2023Thursday
12items
18papers
HeldOpen
16 Feb 2023Thursday
10items
11papers
HeldOpen
12 Jan 2023Thursday
12items
15papers
HeldOpen
1 Dec 2022Thursday
7items
1papers
HeldOpen
27 Oct 2022Thursday
15items
17papers
HeldOpen
20 Oct 2022Thursday
8items
3papers
HeldOpen
8 Sep 2022Thursday
6items
1papers
HeldOpen
28 Jul 2022Thursday
17items
16papers
HeldOpen
9 Jun 2022Thursday
0items
0papers
HeldOpen
14 Apr 2022Thursday
10items
12papers
HeldOpen
31 Mar 2022Thursday
5items
5papers
HeldOpen
17 Mar 2022Thursday
10items
13papers
HeldOpen
10 Mar 2022Thursday
6items
2papers
HeldOpen
3 Feb 2022Thursday
6items
2papers
HeldOpen
13 Jan 2022Thursday
12items
15papers
HeldOpen
2 Dec 2021Thursday
10items
14papers
HeldOpen
1 Dec 2021Wednesday
5items
7papers
HeldOpen
28 Oct 2021Thursday
14items
16papers
HeldOpen
9 Sep 2021Thursday
6items
4papers
HeldOpen
29 Jul 2021Thursday
17items
20papers
HeldOpen
10 Jun 2021Thursday
8items
2papers
HeldOpen
22 Apr 2021Thursday
14items
24papers
HeldOpen
8 Apr 2021Thursday
0items
0papers
HeldOpen
11 Mar 2021Thursday
12items
21papers
HeldOpen
4 Mar 2021Thursday
0items
0papers
HeldOpen
21 Jan 2021Thursday
11items
16papers
HeldOpen
26 Nov 2020Thursday
12items
15papers
HeldOpen
22 Oct 2020Thursday
15items
19papers
HeldOpen
10 Sep 2020Thursday
7items
2papers
HeldOpen
30 Jul 2020Thursday
18items
20papers
HeldOpen
18 Jun 2020Thursday
0items
0papers
HeldOpen
30 Apr 2020Thursday
0items
0papers
HeldOpen
12 Mar 2020Thursday
9items
9papers
HeldOpen
20 Feb 2020Thursday
6items
2papers
HeldOpen
23 Jan 2020Thursday
16items
25papers
HeldOpen
19 Dec 2019Thursday
8items
2papers
HeldOpen
14 Nov 2019Thursday
6items
2papers
HeldOpen
10 Oct 2019Thursday
19items
22papers
HeldOpen
25 Jul 2019Thursday
19items
25papers
HeldOpen

Follow the Audit and Governance Committee

Choose what you want to hear about. The preview is built from this committee's real papers and changes, so you can see what would have reached you.

What should we tell you?

Bournemouth, Christchurch and Poole, Audit and Governance Committee

Audit and Governance Committee: 3 kinds of updateBournemouth, Christchurch and Poole, sent the same day
PDF
20 papers published for 16 OctoberApologies
DAT
Meeting dates updatedAny date added, moved or dropped
DEC
Decisions from 16 OctoberThe committee's resolutions, the day they are recorded
ABC
Your words found in the papersEvery match, with the page it is on
Each update links to the paper and the council's own copy
Free: one weekly alert. Pro: every option, the same day. Pro Plus: straight into your own systems.

Free

One alert, sent weekly, on titles and decisions.

£0for good
  • 1 alert, weekly summary
  • Titles and decisions
  • Link to every official paper
Save this alert free
Most chosen

Pro

Unlimited alerts the same day, searching every page.

£99per user a month
  • Unlimited alerts, same day
  • Matches inside every page and appendix
  • Every council, not just this one

Pro Plus

Your team, with every match pushed into your own tools.

£449a month, 3 users included
  • Everything in Pro, for 3 users
  • Alerts as webhooks into Slack or a CRM
  • API key and bulk export of this council

Data licence

Every council's records in your own products and research.

£12,000a year, from
  • Unlimited API and full archive delivery
  • Rights to use the data in your products
  • Back to 2000, every council
Talk to us

Never miss what this committee decides

Papers, decisions and date changes for the Audit and Governance Committee, and every other committee you follow, the day they appear.

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies