Thames Basin Heaths Special Protection Area - Avoidance and Mitigation Strategy

Approved Executive 5 papers

Executive approved this item on Tuesday 5 June 2007. Below is the council's own wording, with the papers it was decided on.

Item4b

Resolved

RESOLVED 1 That the implementation of the Thames Basin Heaths Special Protection Area Technical Background Document to the Core Strategy Development Plan Document be approved through appropriate Section 106 obligations and contributions, as set out in Appendix 1 of the Director of Environment & Leisure’s report. 2 That the implementation mechanism be approved, subject to the approval of detailed open space management plans to be drawn up in consultation with Natural England. 3 That authority be delegated to the Director of Environment and Leisure to approve open space management plans. 4 That the use of the Section 106 contributions in the manner set out in section 5.3 of the Director of Environment & Leisure’s report be approved.
Word for word from the decision Bracknell Forest published for this meeting. Source: democratic.bracknell-forest.gov.uk

Follow this further

Built from Bracknell Forest's papers

What the report saysPro

Report to Executive

Horseshoe Lake Special Protection Area (SPA) Mitigation Works

CONTENTS

1. Introduction

2. Site Management Statement

3. Site Proposals

4. Annotated Site Plan

5. SANGs Criteria Assessment

6. Costings Breakdown 1 Introduction

1.1The Thames Basin Heaths SPA

The Thames Basin Heaths Special Protection Area (SPA) is a network of heathland sites designated to protect the habitat of the internationally important bird species of woodlark, nightjar and Dartford warbler.

Bracknell Forest Borough Council is legally obliged to make sure that no adverse effect on the integrity of the SPA will arise from new development. As a result, the SPA Technical Background Document to the Core Strategy (hereafter referred to as SPA TBD) was produced, which identifies measures to avoid and mitigate adverse effects arising from proposed new development. The collection of financial contributions towards such measures, and putting these measures in place, will ensure that there will be no adverse effect upon the integrity of the SPA.

A component of the Section 106 contribution will provide funding for specific works to enhance identified areas of open space in line with the SPA TBD.

1.2Open Space Management Plans

This report comprises an open space management plan which expands upon the enhancements works required within the SPA TBD. This will also enable avoidance and mitigation measures to be closely linked to Section 106 contributions from specific developments.

1.3Identification of Suitable Accessible Natural Greenspace (SANGS)

The SPA TBD went through an extensive process to identify areas of open space as suitable alternatives to the SPA. Section 20 and Appendix 8 of the SPA TBD provide a rationale for the identification of areas of open space and Appendix 9 makes an appraisal of the necessary quality enhancements.

Therefore, this report builds upon the information and research presented within the SPA TBD to provide more detailed works and costings on how Horseshoe Lake could be brought up to a suitable standard to provide an alternative to the SPA.

1.4Horseshoe Lake as an alternative to the SPA

After considering the evidence, the SPA TBD concluded that:

“This site [Horseshoe Lake] is an excellent alternative area of open space, as it has a large catchment of visitors, traveling by car for recreational purposes and dog walking. It has been identified by the current users as not a busy area and this belief is borne out by the low visitor numbers collected. It is a semi-natural site with good links and a range of habitats, which could be enhanced to encourage additional visitors away from the SPA as existing users go to these areas too.” 2 Bracknell Forest Parks & Countryside Service Management Statement: Horseshoe Lake 2007

1. SITE DESCRIPTION

1.1Location

A flooded gravel pit situated off Mill Lane in Sandhurst parish, Bracknell Forest borough.

OS Grid Ref.: SU820624.

1.2Adjacent Land

Horseshoe Lake is part of a large complex of flooded gravel pits along the Blackwater Valley. The River Blackwater adjoins the southern boundary of the site and also forms the Borough boundary.

The site lies within the project area of the Blackwater Valley Countryside Partnership (BVCP). The western boundary adjoins Moor Green Lakes, a nature reserve managed by the BVCP. To the west lies Moor Green Lakes, a nature reserve managed by the BVCP, and to the east Church Farm flooded gravel pits which are currently being restored for nature conservation and low key recreation.

1.3Access (pedestrians, cycles, cars, disabled)

There is a vehicular access into the site from Mill Lane, into two small car parks, one of which serves the watersports centre. The site can be accessed by 7 formal entrances including the car park, with pedestrian access points from Mill Lane, Lower Sandhurst Road, the junction of Lower Sandhurst Road / Ambarrow Lane and the riverside path.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Horseshoe Lake SPA management plan 22-02-07Report 3.6 MB DownloadRead as text
PDF
Thames Basin Heaths SPA Avoidance and Mitigation Strategy: Appendix 1Appendix 1.1 MB Download
PDF
Thames Basin Heaths SPA Avoidance and Mitigation Strategy: Appendix 3Appendix 146 KB Download
PDF
Thames Basin Heaths SPA Avoidance and Mitigation Strategy: Appendix 4Appendix 76 KB Download
PDF
Thames Basin Heaths Special Protection Area: Avoidance and Mitigation StrategyReport 79 KB Download

At this meeting

Whole meeting
3Minutes - 8 & 13 March 2007Decided 4aHealth and Wellbeing StrategyApproved
4bThames Basin Heaths Special Protection Area - Avoidance and Mitigation StrategyThis decision
7Decision RecordsOn the agenda

Who was there

6 of 8 attended
PB
Councillor Paul Bettison OBE CONChair, apologies
AW
Alan Ward CONVice-Chair, apologies
DB
Councillor Dale Birch CONCommittee Member, present
MM
Councillor Mrs Mary Ballin CONCommittee Member, present
GB
Councillor Gareth Barnard CONCommittee Member, present
DH
Councillor Dorothy Hayes CONCommittee Member, present
AK
Councillor Alan Kendall CONCommittee Member, present
IM
Iain McCracken CONCommittee Member, present

On this subject at Bracknell Forest

Search all
  1. Thames Basin Heaths Special Protection Area - Avoidance and Mitigation StrategyThis decision
  2. Thames Basin Heaths Special Protection Area Supplementary Planning DocumentApproved
  3. Thames Basin Heaths Special Protection Area Supplementary Planning DocumentApproved
  4. Thames Basin Heaths Special Protection Area Supplementary Planning DocumentApproved
  5. Thames Basin Heaths Special Protection Area Supplementary Planning Document ConsultationApproved
  6. Thames Basin Heaths Special Protection Area Avoidance and Mitigation Supplementary Planning Document AdoptionApproved

More from Bracknell Forest Executive

All decisions
MeetingDecisionOutcome
17 Sep 2024 Town Centre Off Street Day Rate Car Park ChargesRESOLVED that i. the Executive noted the options on charging tariffs for The Avenue, Braccan Walk and Weather Way car... Noted Open
17 Sep 2024 Housing Supplementary Planning Document (SPD) consultationRESOLVED that i. the content of the Draft Housing SPD is agreed. ii. a public consultation on the Draft Housing SPD b... Agreed Open
17 Sep 2024 Approval of Biodiversity Action Plan 2024-2029RESOLVED that the Bracknell Forest Biodiversity Action Plan (BAP) 2024-2029 and supporting summary document is approved. Approved Open
17 Sep 2024 Council Plan Overview Report Q1RESOLVED that the performance of the council over the period from April to June 2024 highlighted in the Overview Repo... Noted Open
17 Sep 2024 Quarterly update on SEND ImprovementRESOLVED that the Executive: i. notes the progress made on implementing the SEND WSOA to improve services to children... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies