CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Bracknell Forest Council
Executive, Tuesday 20 October 2009 at 5.30pm

Thames Basin Heaths SPA - Review of Existing Strategy

Noted Executive 3 papers

Executive noted this item on Tuesday 20 October 2009. Below is the council's own wording, with the papers it was decided on.

Item25c

Resolved

RESOLVED 1 That the changes in the policy position as a result of regional and sub-regional progress be noted. 2 That the alterations to the approach in SPA mitigation be supported, namely: · Reduction in the SANGs standard from 12ha to 8ha per 1000 new residents; · Allows for maintenance of SANGs in perpetuity; · Allows for collection of contribution for the Strategic Access Management and Monitoring Project; · Inclusion of implementation information within the SPAAM SPD. 3 That the draft SPAAM SPD (Annexe 1) be endorsed for the purpose of public consultation.
Word for word from the decision Bracknell Forest published for this meeting. Source: democratic.bracknell-forest.gov.uk

Follow this further

Built from Bracknell Forest's papers

What the report saysPro

Report to Executive

Bracknell Forest Borough Local Development Framework

Thames Basin Heaths Special Protection Area Avoidance and Mitigation Draft Supplementary Planning Document

Bracknell Forest Council September 2009 ii Contents Page no. SECTION 1. INTRODUCTION 1.1 Document status 10 1.2 Natural resource management 11 1.3 The impact of development on natural resources 11 1.4 Spatial policy framework 12 1.5 Scope of the SPD 13 1.6 How to use this document 13 SECTION 2. INTRODUCTION TO HABITATS REGULATIONS ASSESSMENT 2.1 Background 15 2.2 Plan level assessment 16 2.3 Relevance to Bracknell Forest Council 16 2.4 Integration with the Sustainability Appraisal and Strategic 17 Environmental Assessment (SA/SEA) process 2.5 Methodology 17 SECTION 3. SCREENING AND APPROPRIATE ASSESSMENT UNDER THE HABITATS REGULATIONS 3.1 Screening exercise 19 3.2 Next stages 20 SECTION 4. SUMMARY OF THE FINDINGS OF THE APPROPRIATE ASSESSMENT SECTION 5. SPA AVOIDANCE AND MITIGATION STRATEGY 5.1 Strategic sites identified in the Core Strategy 24 5.2 Suitable Alternative Natural Greenspace (SANGs) 25 5.3 Strategic SPA Visitor Access Management 34 5.4 Presumption against residential development within 400 metres 36 of the SPA boundary 5.5 Education 39 5.6 Loss of supporting habitats and lay-back land 40 5.7 Restrictions on pet ownership 41 5.8 Bespoke solutions 43 5.9 Summary of avoidance and mitigation measures 44 5.10 Monitoring 46 SECTION 6. IMPLEMENTATION 6.1 Development Plan Policy 47 6.2 Background 47 6.3 Legal considerations 47 6.4 Proposed development within 400 m of the SPA boundary 48 6.5 Residential developments between 400m and 5km from the SPA 49 boundary 6.6 Bespoke SPA protection measures 50 6.7 Payment contributions towards Avoidance and Mitigation 51 SPD

iii 6.8 Contribution calculation 52 6.9 Timing of contribution 53 6.10 Off-site mitigation on sites owned or leased to/by the Council 54 6.11 Monitoring SPA Avoidance and Mitigation measures 55 6.12 Managed Housing – Additional SPA Avoidance and Mitigation 55 measures SECTION 7. CONSULTATION

Tables Page no. Table 1. Screening opinion consultation responses 19 Table 2. Excluded sites from the regional open space review 27 Table 3. Suitable areas of SANGs 29 Table 4. Calculation of open space use 32 Table 5. Mitigation carrying capacity of SANGS 33 Table 6. Summary of avoidance and mitigation measures 45 Table 7. Applications for development within the 400m zone 49 Table 8. Applications for development between 400m and 5km from 52 SPA boundary Table 9. Contribution Calculation 53

Figures Page no. Figure 1. Proportion of dwellings by type 43

Appendix 1: Thames Basin Heaths Special Protection Area Delivery Framework Appendix 2: Appropriate Assessment Appendix 3: Flowchart of decision-making process under the Habitats Regulations 1994 Appendix 4: Screening Opinion Appendix 5: Natural England SANGs Quality Guidance Appendix 6 : Full Assessment of SANGs Appendix 7: SANGs Enhancement Works Appendix 8: SAMM Monitoring Strategy Appendix 9: Map of SPA within Sub-region Appendix 10: SPA Avoidance and Mitigation Costs Appendix11 : Model S106 Agreement

iv EXECUTIVE SUMMARY

The Thames Basin Heaths Special Protection Area (SPA) was designated in March 2005 and is protected from adverse impact under European and UK law. Natural England research conducted in 2005 indicated that the existing level of recreational pressure is having a detrimental effect on the three species of Annex I birds (nightjar, woodlark and Dartford warbler) for which the SPA was designated. These ground- nesting birds which breed on the SPA are subject to disturbance from people and their pets using the SPA for recreational purposes and this affects their breeding success.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
07 Thames Basin Heaths SPA: Draft SPDReport 430 KB DownloadRead as text
PDF
07 Thames Basin Heaths SPA: Draft SPD AppendicesReport 5.1 MB Download
PDF
Thames Basin Heaths SPA: Review of Existing StrategyReport 88 KB Download

At this meeting

Whole meeting

Who was there

5 of 9 attended
PB
Councillor Paul Bettison OBE CONChair, apologies
AW
Alan Ward CONVice-Chair, present
MM
Councillor Mrs Mary Ballin CONCommittee Member, present
GB
Councillor Gareth Barnard CONCommittee Member, apologies
DB
Councillor Dale Birch CONCommittee Member, present
DH
Councillor Dorothy Hayes CONCommittee Member, present
AK
Councillor Alan Kendall CONCommittee Member, apologies
IM
Iain McCracken CONCommittee Member, present
DM
Derek MorganClerk, expected

On this subject at Bracknell Forest

Search all
  1. Thames Basin Heaths SPA - Review of Existing StrategyThis decision
  2. Thames Basin Heaths Special Protection Area Supplementary Planning DocumentApproved
  3. Thames Basin Heaths Special Protection Area Supplementary Planning DocumentApproved
  4. Thames Basin Heaths Special Protection Area Supplementary Planning DocumentApproved
  5. Thames Basin Heaths Special Protection Area Supplementary Planning Document ConsultationApproved
  6. Thames Basin Heaths Special Protection Area Avoidance and Mitigation Supplementary Planning Document AdoptionApproved

More from Bracknell Forest Executive

All decisions
MeetingDecisionOutcome
17 Sep 2024 Town Centre Off Street Day Rate Car Park ChargesRESOLVED that i. the Executive noted the options on charging tariffs for The Avenue, Braccan Walk and Weather Way car... Noted Open
17 Sep 2024 Housing Supplementary Planning Document (SPD) consultationRESOLVED that i. the content of the Draft Housing SPD is agreed. ii. a public consultation on the Draft Housing SPD b... Agreed Open
17 Sep 2024 Approval of Biodiversity Action Plan 2024-2029RESOLVED that the Bracknell Forest Biodiversity Action Plan (BAP) 2024-2029 and supporting summary document is approved. Approved Open
17 Sep 2024 Council Plan Overview Report Q1RESOLVED that the performance of the council over the period from April to June 2024 highlighted in the Overview Repo... Noted Open
17 Sep 2024 Quarterly update on SEND ImprovementRESOLVED that the Executive: i. notes the progress made on implementing the SEND WSOA to improve services to children... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies