RESOLVED that 1 Progress made on the Project since the meeting of the Joint Waste Disposal Board on 24 February 2010 be noted. 2 That information be provided on the ferrous content of Bottom Ash from the Lakeside Energy from Waste facility be provided. 3 The Project Director provide details of implications of the overall waste tonnage falling below 190,000 tonnes. 4 That further details, regarding consultancy costs, be reported to the Board. . 5 That the Project Director bring the draft budget proposals for 2011/12 to the next meeting. 6 An update regarding the use of the re3 facilities by West Berkshire residents be brought to the next meeting.
Word for word from the decision Bracknell Forest published for this meeting.Source: democratic.bracknell-forest.gov.uk
2.1To note progress made since the last meeting on 24th February 2010.
3. SUPPORTING INFORMATION
Operations and Facilities
3.1Officers have ascertained the destination of the waste output from the Lakeside Energy from Waste (EfW) facility. Bottom Ash from the process (equivalent to 19% of total inputs) is recovered and, following the removal of the ferrous content, is used in the production of building blocks. The ‘Fly’ Ash (equivalent to 3% of total inputs) is sent to a landfill which is able to receive hazardous waste.
3.2The production of building blocks from the Bottom Ash is not, according to the methodological requirements of the NI (National Indicator) Targets, recorded as recycling.
3.3In order to ensure compliance with appropriate legislation, the Contractor has instigated, with the support of council officers, a new regime for the receipt of sheet asbestos from residents.
3.4Under the new regime, residents wishing to deposit sheet asbestos will be received within two time-slots each day (9.00am – 10.00am and 2.00pm – 3.00pm).
3.5The time slots allow the on-site staff to adorn the required protective equipment (suitable for instances where repeated work with asbestos is the norm), without the requirement to wear it all day or change into and out of it at random. The retained requirement for residents to phone ahead also ensures that the site has capacity to store the material within the specific containers as it cannot be stored loose in the open air.
3.6The re3 Project Team have been in liaison with the Contractor to find a suitable replacement for the Retail Outlet referred to within the contract. Members will receive a presentation from the Contractor on the Household Waste Recycling Centre Retail Outlet replacement service.
3.7Works are due to begin, during July, on the improvements to the fire detection and prevention system primarily within Smallmead MRF.
3.8Members will be aware that the councils and contractor co-commissioned an independent assessment of the existing fire detection and prevention system. The report made recommendations around the protection of ‘shielded’ areas (i.e. those where a fire could start without a clear route for the product of the fire to reach the detection system). Following the works, these areas will be protected by additional sprinklers. 3.9 Throughout the period since the independent report was received, the contractor has put in place increased levels of monitoring on the MRF to ensure safe operation.
3.10The contractor has also maintained a regular and appropriate level of contact with the facility’s insurers, the Fire Service and the councils to ensure that all parties are aware of progress.
Finance and Performance
3.11The Project is reporting a collective under-spend against the individual budgets of £940,000 for 2009/10. See Appendix 1.
3.12One reason for the under spend is the dramatic fall in overall waste tonnage over the year. Based on an assessment of likely waste generation, undertaken with the contractor, the predicted tonnage was 207,600 tonnes. However, in all probability in large part due to the recession, the actual for the year was significantly lower at 193,800 tonnes.
3.13Recycling was 11,000 tonnes under forecast, and composting 7,000 tonnes under forecast. However residual waste was 5,000 tonnes above forecast.
3.14Another factor in the under spend is that at the time of building the budget (September 2008) inflation was running at 4%. By April 2009 it had fallen to 1.7%.
3.15In addition, business rates for 2009/10 were cautiously estimated at £650,000. The recent revaluation of the sites produced a much lower rateable value than anticipated, resulting in a cost for the year of £397,000.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.