Bracknell Forest Council
Joint Waste Disposal Board, Thursday 1 July 2010 at 6.00pm

Progress Report

Noted Committee 1 paper

Joint Waste Disposal Board noted this item on Thursday 1 July 2010. Below is the council's own wording, with the papers it was decided on.

Item39

Resolved

RESOLVED that 1 Progress made on the Project since the meeting of the Joint Waste Disposal Board on 24 February 2010 be noted. 2 That information be provided on the ferrous content of Bottom Ash from the Lakeside Energy from Waste facility be provided. 3 The Project Director provide details of implications of the overall waste tonnage falling below 190,000 tonnes. 4 That further details, regarding consultancy costs, be reported to the Board. . 5 That the Project Director bring the draft budget proposals for 2011/12 to the next meeting. 6 An update regarding the use of the re3 facilities by West Berkshire residents be brought to the next meeting.
Word for word from the decision Bracknell Forest published for this meeting. Source: democratic.bracknell-forest.gov.uk

Follow this further

Built from Bracknell Forest's papers

What the report saysPro

Report to Joint Waste Disposal Board

Recommendations

2.1To note progress made since the last meeting on 24th February 2010.

3. SUPPORTING INFORMATION

Operations and Facilities

3.1Officers have ascertained the destination of the waste output from the Lakeside Energy from Waste (EfW) facility. Bottom Ash from the process (equivalent to 19% of total inputs) is recovered and, following the removal of the ferrous content, is used in the production of building blocks. The ‘Fly’ Ash (equivalent to 3% of total inputs) is sent to a landfill which is able to receive hazardous waste.

3.2The production of building blocks from the Bottom Ash is not, according to the methodological requirements of the NI (National Indicator) Targets, recorded as recycling.

3.3In order to ensure compliance with appropriate legislation, the Contractor has instigated, with the support of council officers, a new regime for the receipt of sheet asbestos from residents.

3.4Under the new regime, residents wishing to deposit sheet asbestos will be received within two time-slots each day (9.00am – 10.00am and 2.00pm – 3.00pm).

3.5The time slots allow the on-site staff to adorn the required protective equipment (suitable for instances where repeated work with asbestos is the norm), without the requirement to wear it all day or change into and out of it at random. The retained requirement for residents to phone ahead also ensures that the site has capacity to store the material within the specific containers as it cannot be stored loose in the open air.

3.6The re3 Project Team have been in liaison with the Contractor to find a suitable replacement for the Retail Outlet referred to within the contract. Members will receive a presentation from the Contractor on the Household Waste Recycling Centre Retail Outlet replacement service.

3.7Works are due to begin, during July, on the improvements to the fire detection and prevention system primarily within Smallmead MRF.

3.8Members will be aware that the councils and contractor co-commissioned an independent assessment of the existing fire detection and prevention system. The report made recommendations around the protection of ‘shielded’ areas (i.e. those where a fire could start without a clear route for the product of the fire to reach the detection system). Following the works, these areas will be protected by additional sprinklers. 3.9 Throughout the period since the independent report was received, the contractor has put in place increased levels of monitoring on the MRF to ensure safe operation.

3.10The contractor has also maintained a regular and appropriate level of contact with the facility’s insurers, the Fire Service and the councils to ensure that all parties are aware of progress.

Finance and Performance

3.11The Project is reporting a collective under-spend against the individual budgets of £940,000 for 2009/10. See Appendix 1.

3.12One reason for the under spend is the dramatic fall in overall waste tonnage over the year. Based on an assessment of likely waste generation, undertaken with the contractor, the predicted tonnage was 207,600 tonnes. However, in all probability in large part due to the recession, the actual for the year was significantly lower at 193,800 tonnes.

3.13Recycling was 11,000 tonnes under forecast, and composting 7,000 tonnes under forecast. However residual waste was 5,000 tonnes above forecast.

3.14Another factor in the under spend is that at the time of building the budget (September 2008) inflation was running at 4%. By April 2009 it had fallen to 1.7%.

3.15In addition, business rates for 2009/10 were cautiously estimated at £650,000. The recent revaluation of the sites produced a much lower rateable value than anticipated, resulting in a cost for the year of £397,000.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Progress ReportReport 81 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

14 of 14 attended
RS
Councillor Rob StantonWokingham Borough Council, present
GC
Councillor Gary CowanWokingham Borough Council, present
MD
Councillor Mrs Dorothy Hayes MBE CONBracknell Forest Councillor, present
IM
Councillor Iain McCracken CONBracknell Forest Councillor, present
WS
Councillor Warren SwaineReading Borough Council, present
TS
Councillor Tom StanwayReading Borough Council, present
OB
Oliver BurtOfficer, present
PB
Pete BaveystockOfficer, present
JD
Janet DowlmanOfficer, present
DF
Dave FisherOfficer, present
KH
Kevin HolyerOfficer, present
SL
Steve LoudounOfficer, present

All 14 on the meeting page

On this subject at Bracknell Forest

Search all
  1. Progress ReportThis decision
  2. re3 Progress ReportNoted
  3. Progress ReportNoted
  4. Update on the progress of the Joint Strategic Needs Assessment (JSNA) and Joint Health and Wellbeing Strategy (JHWS)Noted
  5. Carers' Strategy Annual Progress Report 2025Noted
  6. re3 Progress ReportNoted

More from Bracknell Forest Joint Waste Disposal Board

All decisions
MeetingDecisionOutcome
11 Jun 2026 Election of ChairRESOLVED that Councillor Finn McGoldrick be elected Chair of the Board for the municipal year 2026/27. Decided Open
11 Jun 2026 Election of Vice-ChairRESOLVED that Councillor Stephen Newton be elected Vice-Chair of the Board for the municipal year 2026/27. Decided Open
11 Jun 2026 re3 Progress ReportRESOLVED that 1 the contents of this report be noted. 2 a proposal on the simplification of the DIY charging structur... Noted Open
11 Jun 2026 re3 Strategy ReportRESOLVED that 1 the re3 Strategy 2026–2031 be approved and progressed through each partner council’s decision-making ... Approved Open
11 Jun 2026 re3 Finance Report - part oneRESOLVED that the year end financial position for FY25/26 be noted. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies