RESOLVED that the planning application be refused for the following reasons: 01. By reason of its bulk, massing and appearance the proposed development would be incongruous and prominent within the street scene, out of keeping with the surrounding pattern and form of development to the detriment of the character and visual amenities of the area. The proposed development would therefore be contrary to paragraphs 16, 49 and 69 of PPS3, Policy CC6 of the South East Plan, Policy EN20 of the Bracknell Forest Borough Local Plan and to Policy CS7 of the Core Strategy Development Plan Document. 02. The proposed development would unacceptably increase the pressure on highways and transportation infrastructure, public open space, recreational facilities, educational facilities and the Thames Basin Heath Special Protected Area. In the absence of a planning obligation in terms that are satisfactory to the Local Planning Authority, and which secure contributions towards integrated transport and highway safety measures, open space, recreations and educational facilities and mitigation for the Thames Basin Heath, the proposal is contrary to Policies CC7 and NRM6 of the South East Plan, Policies R5 and M4 of the Bracknell Forest Borough Local Plan and CS6, CS8, CS14 and CS24 of the Core Strategy Development Plan Document and to Supplementary Planning Document Limiting the Impact of Development (adopted July 2007).
Word for word from the decision Bracknell Forest published for this meeting.Source: democratic.bracknell-forest.gov.uk
ITEM NO: 7 Application No. Ward: Date Registered: Target Decision Date: 10/00848/OUT Ascot 5 January 2011 2 March 2011 Site Address: 121 - 123 Fernbank Road Ascot Berkshire SL5 8JT Proposal: Outline application for the erection of 8 x 2 bed flats within 2 x 2 storey blocks following demolition of existing bungalows. Applicant: Woodbury Homes Agent: [name removed] Officer: Laura Rain, 01344 352000 [email protected]
Site Location Plan (for identification purposes only, not to scale)
Planning & Highways Committee 17th March 2011 1 RELEVANT PLANNING HISTORY (If Any)
04/01045/OUT Validation Date: 02.12.2004 Outline application (including design, landscaping and means of access) for the erection of 2no. blocks comprising 8no. two bedroom and 4no. one bedroom flats with associated parking, cycle and bin stores accessed from Fernbank Road following demolition of existing dwellings. Withdrawn
07/00209/OUT Validation Date: 23.02.2007 Outline application for the erection of 12no. two bedroom flats and 2no. one bedroom flats with associated parking, including details of access on to Fernbank Road and demolition of 121, 123 and 125 Fernbank Road. Refused
08/00576/OUT Validation Date: 14.06.2008 Outline application (including details of access, appearance, layout and scale) for the erection of two buildings accommodating 8no. two bedroom flats with associated parking following demolition of existing dwellings. Withdrawn
08/00943/OUT Validation Date: 10.10.2008 Outline application (including details of access, appearance, layout and scale) for the erection of two buildings accommodating 8no. two bedroom flats with associated parking following demolition of existing dwellings. Refused
09/00072/OUT Validation Date: 09.02.2009 Outline application (including details of access, appearance, layout and scale) for the erection of two buildings accommodating 8no. two bedroom flats with associated parking following demolition of existing dwellings. Refused – Appeal Dismissed
10/00406/FUL Validation Date: 21.06.2010 Erection of 8no. two bedroom flats in two blocks following demolition of 2 no. exsiting detached bungalows. Refused
10/00645/OUT Validation Date: 24.09.2010 Erection of 8 x 2 bed flats within 2 x 2 storey blocks following demolition of existing bungalows. Refused
2 RELEVANT PLANNING POLICIES
Key to abbreviations
BFBCS Core Strategy Development Plan Document BFBLP Bracknell Forest Borough Local Plan RMLP Replacement Minerals Local Plan WLP Waste Local Plan for Berkshire
SPG Supplementary Planning Guidance SPD Supplementary Planning Document PPG (No.) Planning Policy Guidance (Published by DCLG) PPS (No.) Planning Policy Statement (Published by DCLG) MPG Minerals Planning Guidance DCLG Department for Communities and Local Government
Planning & Highways Committee 17th March 2011 SEP Plan South East Plan
Plan Policy Description (May be abbreviated) BFBLP EN1L Protecting Tree And Hedgerow Cover BFBLP EN20 Design Considerations In New Development BFBLP M4L Highway Measures New Development BFBLP M9 Vehicle And Cycle Parking BFBLP R5 Publicy Usable OS For Small Sites BFBCS CS1 Sustainable Development Principles BFBCS CS6 Limiting the Impact of Development BFBCS CS7 Design BFBCS CS8 Recreation and Culture BFBCS CS23 Transport BFBCS CS10 Sustainable Resources BFBCS CS12 Renewable Energy BFBCS CS14 Thames Basin Heaths Special Protection Area SEP CC4 Sustainable Design and Construction SEP CC6 Sustainable Communities and Character of the Environment SEP CC7 Infrastructure and Implementation SEP H5 Housing Design and Density SEP NRM5 Conservation and Improvement of Biodiversity SEP NRM6 Thames Basins Heath Special Protection Area 3 CONSULTATIONS (Comments may be abbreviated)
Winkfield Parish Council
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.