It was agreed that the full results of the User Satisfaction Survey would be circulated to the Board. The Board noted the update on the progress of Green Machine the community paint recycling scheme. It was acknowledged that having an easily accessible retail facility would boost the profile of the facility and that thought would need to be given to how Council’s marketing teams could help publicise the service more widely. Green Machine would be invited to the Board’s next meeting. RESOLVED that: 1. The contents of the Project Director’s report be noted 2. The plans to facilitate the planned Scottish and Southern Energy cabling works as described at paragraphs 3.7, 3.8 and 3.9 of the Project Director’s report be approved
Word for word from the decision Bracknell Forest published for this meeting.Source: democratic.bracknell-forest.gov.uk
2.2That Members approve the plan to facilitate the planned SSE cabling works as described at 3.7, 3.8 and 3.9 below.
3. SUPPORTING INFORMATION
Performance
3.1The Contractor has recently undertaken some repair works to the concrete ‘push’ walls in the Transfer Station at Smallmead.
3.2The work involved the closure of successive material bays within the Transfer Station (and associated closure of each bay for material from the HWRC). The work was undertaken on a phased basis over the course of [x] weeks. The Transfer Station and HWRC remained open throughout.
3.3Equivalent works are planned for Longshot Lane and are currently scheduled to take place in March 2014.
3.4Throughout the last year, Scottish and Southern Energy (SSE) have been undertaking works in Bracknell to connect the Bracknell Primary Substation with Wokingham. Works are due to recommence in early 2014 and when they do, there will be some significant access implications to the re3 facility on Longshot Lane.
3.5Discussions have been ongoing between SSE and their agents, officers of Bracknell Forest Borough Council and the re3 partnership. A solution, that we believe to be the least disruptive to services but which adequately enables the works to be undertaken, has been developed.
3.6In order to facilitate the works, there is likely to be two-week period in which traffic controls will be in place along Longshot Lane.
3.7Within that two-week period, at the point that trench-works are immediately adjacent to the entrance to the re3 facility, it is likely that the Longshot Lane HWRC will need to be closed.
3.8A further likely measure that will be adopted is the delivery of some waste, collected by Bracknell Forest Borough Council, to the re3 facility at Smallmead in Reading.
3.9Subject to Member approval of the plans, officers will liaise with the PFI Contractor, other elements of the relevant councils (for example: the public relations teams), SSE and their agents to ensure that any planned disruption is appropriately articulated to HWRC users and the council waste collection contractors.
3.10Subject to any additional requirements being identified, Members are asked to endorse the proposed plan to facilitate the SSE works.
3.11As part of the re3 waste PFI contract, the Contractor is required to undertake an annual User Satisfaction Survey.
3.12The survey is usually undertaken during September or October each year and the results of the most recent survey are now known. A summary table of results is included, for each facility, at Appendix 3.
3.13The headline indicator, (the percentage of users rating the facility as either ‘good’ or ‘very good’) has remained above 90% as in previous years. The average score in this indicator over the six years of the contract is 94% for Longshot Lane and 97% for Smallmead.
3.14Officers will work with the Contractor to address any areas of service which have been identified as requiring improvement via the annual survey.
Green Machine
3.15Green Machine is now approaching the end of the second year of the paint reuse scheme that the re3 councils have been supporting.
3.16Between January and October 2013, Green Machine has collected 72 tonnes of paint from the two Household Waste Recycling Centres. This represents 19% of the total paint available at the two facilities.
3.17The average cost per tonne for paint processed by Green Machine is £849 per tonne, compared with FCC’s cost of £614 per tonne.
3.18Green Machine are to be invited to attend the March 2014 Joint Waste Disposal Board meeting and make a presentation to Members on their progress and performance.
Finance
3.19The year to date projected outturn for 2013/14 is attached under Appendix 1.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.