Resolved
It was RESOLVED that, following the completion of planning obligation(s) under Section 106 of the Town and Country Planning Act 1990 relating to: measures to avoid and mitigate the impact of residential development upon the Thames Basins Heath Special Protection Area (SPA); and to secure access through the site for all occupiers and their visitors; That the Head of Planning be authorised to APPROVE the application subject to the following condition(s):- 01. The development hereby permitted shall be begun before the expiration of three years from the date of this permission. REASON: To comply with Section 91 of the Town and Country Planning Act 1990. 02. The development hereby permitted shall be carried out only in accordance with the following approved plans received by the Local Planning Authority on 5 April 2016: FD15-1349-110: Plots 5-9 Ground Floor Plan FD15-1349-111: Plots 5-9 First Floor Plan FD15-1349-112: Plots 5-9 Roof Plan FD15-1349-115: Plots 5-9 Front and Left Flank Elevations FD15-1349-116: Plots 5-9 Rear and Right Flank Elevations And the following approved plans received by the Local Planning Authority on 15 September 2016: FD15-1349-100 Rev A: Plots 1-4 Ground Floor Plans FD15-1349-101 Rev A: plots 1-4 First Floor Plan FD15-1349-102 Rev A: Plots 1-4 Second Floor Plan FD15-1349-103 Rev A: Plots 1-4 Roof Plan FD15-1349-105 Rev A: Plots 1-4 Front and Left Flank Elevations FD15-1349-106 Rev A: Plots 1-4 Rear and Right Flank Elevation And the following plan received by the Local Planning Authority on 19 September 2016: FD15-1349-55 Rev G: Proposed Site Layput REASON: To ensure that the development is carried out only as approved by the Local Planning Authority. 03. The following details shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of above ground construction works: a) Sample panel of all facing materials, including a sample panel of brickwork which demonstrates brick type, colour, texture, face bond, mortar mix and pointing, to be erected on site and maintained there during the course of construction; b) Samples and/or manufacturer's details of the roof materials for the proposed works are to be provided on site and retained on site during the course of the works; c) Plan, elevation and section drawings, with materials annotated, of new windows and window openings (including surrounds) at a minimum scale of 1:10; and d) Plan, elevation and section drawings, with materials annotated, of all new doors at a minimum scale of 1:10. The relevant part of the works shall be carried out only in accordance with the ... view the full minutes text for item 59.