Application No 19/00327/FUL - Land At South West Of Abbey Place, Abbey Place, Warfield

Approved Planning 1 paper

Planning Committee approved this item on Thursday 10 September 2020. Below is the council's own wording, with the papers it was decided on.

Item43

Resolved

RESOLVED that the Head of Planning be authorised to APPROVE the application subject to the following conditions amended, added to or deleted as the Head of Planning considers necessary and following the required consultation with the applicant in relation to pre-commencement conditions: - 01. The development hereby permitted shall be begun before the expiration of three years from the date of this permission. REASON: To comply with Section 91 of the Town and Country Planning Act 1990 (as amended). 2. The development hereby permitted shall be carried out only in accordance with the following approved plans received by the Local Planning Authority: Block Plan AP-BP- 01 Site Layout AB-SL_9U-01C - Rec. 26.5.2020 Site Layout Coloured - AB-CSL_9U- 01 - Rec. 12.6.2020 Plot 1 - Plans and Elevations AB-PE_9U - 01 - Rec. 7.8.2020 Plot 2 - Plans and Elevations AB-PE_9U - 02 - Rec. 7.8.2020 Plot 3 - Plans and Elevations AB-PE_9U - 03 - Rec. 7.8.2020 Plots 4-9 - Plans and Elevations AB-PE_9U - 04A - Rec 12.6.2020 Streetscene - AB-SS - 01- 02 - Rec. 7.8.2020 Drainage Strategy C200 Rev 5 - Rec. 3. 8. 2020 Existing Ditch Engineering works BR- 533-0037 C203A - Rec. 29.1.2020 Flood Risk Assessment Calibro Report Ref BR-537-0037 Rev 02 - Rec 3.2.2020 Tree Protection Plan TMC - 13075 - L/C - Rec. 11.5.2020 Tree Survey and Constraints Plan TMC - 13075 - S/C - Rec 11.5.2020 Arboricultural Impact Statement 13075- AIA - C - Rec.11.5.2020 Phase 1 Geo Environmental Risk Assessment - Rec 8.4.2019 Sustainability Statement - Rec 30.4.2020 REASON: To ensure that the development is carried out only as approved by ... view the full minutes text for item 43.
Word for word from the decision Bracknell Forest published for this meeting. Source: democratic.bracknell-forest.gov.uk

Follow this further

Built from Bracknell Forest's papers

What the report saysPro

Report to Planning Committee

Unrestricted Report

ITEM NO: 07 Application No. Ward: Date Registered: Target Decision Date: 19/00327/FUL Binfield With Warfield 8 April 2019 8 July 2019 Site Address: Land At South West Of Abbey Place Abbey Place Warfield Bracknell Berkshire Proposal: Erection of 9 dwellings with associated access, parking and landscaping. Applicant: [name removed]: (There is no agent for this application) Case Officer: Hilary Coplestone, 01344 352000 [email protected]

Site Location Plan (for identification purposes only, not to scale)

© Crown Copyright. All rights reserved. Bracknell Forest Borough Council 100019488 2004

Planning Committee 10th September 2020 1. SUMMARY

1.1This application seeks full planning permission for the erection of 9 dwellings.

1.2The site is allocated for residential development in the Site Allocations Local Plan and falls within the strategic allocation of Warfield. The proposed development is acceptable in terms of its impact on the character and appearance of the area and on the living conditions of nearby residents. There are no overriding highway concerns. The development of this site will accord with the strategic site allocation and supporting policies.

RECOMMENDATION Planning permission be granted subject to the conditions in Section 11 of this report and a section 106 agreement relating to mitigation measures for the SPA, affordable housing and other contributions and measures.

2. REASON FOR REPORTING APPLICATION TO COMMITTEE

2.1This application is reported to Planning Committee as more than 5 objections have been received.

3. PLANNING STATUS AND SITE DESCRIPTION

PLANNING STATUS Within settlement boundary Allocated site: SALP Policy SA9 Sites on site boundary covered by area TPO 1152 Within 5km buffer of the Thames Basins Heaths Special Protection Area

3.1The application site is located within the Warfield strategic development area (Policies Core Strategy CS5; SALP SA9 and Warfield SPD refers). The strategic development area is divided into three sub areas, numbered 1, 2 and 3 as shown on Plan 1 below:

Plan 1 – Warfield Development Areas.

Planning Committee 10th September 2020 3.2 The site is located on the north eastern edge of Area 1 adjacent to the existing housing development within Old Farmhouse Row and Abbey Place.

3.3The site is largely devoid of vegetation except for groups of trees along the western and southern boundaries of the site. There is a change of level across the site as it falls gently from south to north with the level difference being just over 1m at the greatest point. The site is covered by an area Tree Preservation Order – TPO 1152 (Dated December 2013). The TPO covers all trees of all species on land to the north of Watersplash Lane and East of Newell Green and Farmhouse Row, Warfield.

4. RELEVANT SITE HISTORY

4.1The most recent application in respect of this site is application 14/00980/FUL for the erection of 10 dwellings and associated car ports and landscaping. This was refused on 2nd February 2015 and a subsequent appeal was dismissed on 9th February 2016. In this decision the Inspector concluded that:

i) The line of small trees on the western side of the site ‘appear to be remnants of a neglected hedge and are of limited landscape value’. The planting contributes ‘to the landscape setting of the development area, but is not of such quality for its complete retention to be a significant benefit’. (para 12 refers).

ii) The development (subject to overcoming the ransom strip along the boundary of the site) would have the potential to provide an access on the boundary and thereby integrate with the wider development area.

iii) Due to the limitations imposed by CIL Regulation 123 (i.e. the pooling restrictions) the proposal would endanger the comprehensive approach to the delivery of the Warfield Strategic development as set out in policies CS5 and SA9.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Application No 19/00327/FUL: Land At South West Of Abbey Place, Abbey Place, WarfieldReport 890 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

19 of 20 attended
CD
Councillor Colin Dudley CONChair, present
MB
Councillor Michael Brossard CONVice-Chair, present
RA
Councillor Robert Angell CONCommittee Member, present
DG
Councillor Dr Gareth Barnard CONCommittee Member, present
AS
Councillor Ankur Shiv Bhandari CONCommittee Member, present
DB
Councillor Dale Birch CONCommittee Member, present
TB
Councillor Tricia Brown LABCommittee Member, present
MG
Councillor Michael Gbadebo CONCommittee Member, present
JG
Councillor Jennie Green CONCommittee Member, present
MD
Councillor Mrs Dorothy Hayes MBE CONCommittee Member, present
PH
Councillor Peter Heydon CONCommittee Member, apologies
MI
Councillor Mrs Isabel Mattick CONCommittee Member, present

All 20 on the meeting page

On this subject at Bracknell Forest

Search all
  1. Application No 19/00327/FUL - Land At South West Of Abbey Place, Abbey Place, WarfieldThis decision
  2. Application No 22/00613/FUL - Land to the rear of Oak Tree Nursery, Cocks Lane, WarfieldApproved
  3. Application No 22/00868/FUL - 34 The Broadway, SandhurstApproved
  4. Application No 22/00898/FUL - 45 Forest End Road, SandhurstApproved
  5. Application No 23/00097/FUL - Acre House, 12 Broom Acres, SandhurstApproved
  6. Application No 22/00545/3 - Land At Peacock Meadows, Fulmar Square and Jennetts Hill, BracknellApproved

More from Bracknell Forest Planning Committee

All decisions
MeetingDecisionOutcome
13 Aug 2026 PA/2026/0294 - High Street Car Park, The Ring, Bracknell, RG12 1GNRESOLVED that the application be APPROVED subject to the amended conditions raised both in the supplementary report a... Approved Open
16 Jul 2026 PS 25/00616/REM - White Gates Mushroom Castle Winkfield Row Bracknell Berkshire RG42 7PLRESOLVED that the application be APPROVED subject to the following conditions as amended and added to at the meeting ... Approved Open
16 Jul 2026 24/00724/FUL - Land Adjacent To Silver Trees Birch Lane Ascot SL5 8RFRESOLVED that the application be REFUSED for the following reasons: 01. The proposal is for the construction of a new... Refused Open
16 Jul 2026 PA/2026/0438 - 7 Alben Road, Binfield, Bracknell, RG42 4HURESOLVED that the application be APPROVED subject to the following conditions: 1. The development hereby permitted sh... Approved Open
11 Jun 2026 PS 25/00616/REM - White Gates Mushroom Castle Winkfield Row Bracknell Berkshire RG42 7PLRESOLVED that the application be DEFERRED for further consideration of the design and height of the apartment buildin... Deferred Open