CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Jan27Thursday

Climate Change Advisory Panel

Bracknell ForestHeldPapers from democratic.bracknell-forest.gov.uk
Thursday 27 January 2022, 6.30pmHeld 1758 days ago.
Online Only - Via Zoom Open to the public.
6 items, 7 papersAbout 4.7 MB, led by Local Renewable Power Generation: Anaerobic Digestion Plant High Level Feasibility.
No exempt items listedEvery item is due to be heard in public.
This meeting was held27 January 2022
6items
7papers
–decisions
–exempt
Running order, sized by papersItem 29 to 34
ReportsProcedureExempt parts

The agenda, item by item

What the committee will consider, in order, with every paper attached to its item. Local Renewable Power Generation: Anaerobic Digestion Plant High Level Feasibility is the main business.

29
Procedure

Declarations of Interest

Members are asked to declare any disclosable pecuniary or affected interests in respect of any matter to be considered at this meeting. Any Member with a Disclosable Pecuniary Interest in a matter should withdraw from the meeting when the matter is under consideration and should notify the Democratic Services Officer in attendance that they are withdrawing as they have such an interest. If the Disclosable Pecuniary...

30
Report

Minutes

To approve as a correct record the minutes of the meeting of the Climate Change Panel on 3 November 2021. : The minutes of the Climate Change Advisory Panel meeting held on 27 January 2022 were confirmed as a correct record.

1 paper, 218 KBSearch inside with Pro
PackMinutes218 KBDownload
31
Procedure

Urgent Items of Business

Any other items which, pursuant to Section 100B(4)(b) of the Local Government Act 1972, the Chairman decides are urgent.

32
ReportMain business

Local Renewable Power Generation: Anaerobic Digestion Plant High Level Feasibility

To update Climate Change Advisory Panel on the outcome of the Atkins report into the high-level feasibility of building an anaerobic digestion (AD) plant in the Borough.

5 papers, 2.8 MBSearch inside with Pro
AppendixAppendix A: Final1.4 MBDownload
AppendixAppendix B: Final283 KBDownload
ReportCCAP AD Jan 2022: final753 KBDownload
ReportLocal Renewable Power Generation: Anaerobic Digestion Plant High Level Feasibility317 KBDownload
ReportView item 32. as HTML 41 KB41 KBCopy on its way
33
Report

Feedback from the Climate Change Advisory Panels visits

To received feedback on the visits to Lakeside Energy from Waste plant on the 30 November 2021 and Wallingford Anaerobic Digestor plant on the 1 December 2021.

1 paper, 1.7 MBSearch inside with Pro
ReportFeedback from the Climate Change Advisory Panels visits1.7 MBDownload
34
Procedure

Date of Next Meeting

Read inside all 7 papersPro opens every page, searches every appendix, and keeps the papers if the council removes them.

The main business: Local Renewable Power Generation: Anaerobic Digestion Plant High Level Feasibility

Item 32 is where most of this meeting's papers sit: 5 papers, about 2.8 MB.

Item 32

Local Renewable Power Generation: Anaerobic Digestion Plant High Level Feasibility

To update Climate Change Advisory Panel on the outcome of the Atkins report into the high-level feasibility of building an anaerobic digestion (AD) plant in the Borough.

What is in the pack5 papers, about 2.8 MB
Appendix A
FinalSupporting paper
1.4 MB
Appendix B
FinalSupporting paper
283 KB
Report
CCAP AD Jan 2022: finalThe report to the committee
753 KB
Report
Local Renewable Power Generation: Anaerobic Digestion Plant High Level FeasibilityThe report to the committee
317 KB
Report
View item 32. as HTML 41 KBThe report to the committee
41 KB
Read and search every page of this itemPro opens all 5 papers, and keeps them if the council removes them.

How this item got here

This is the first time this subject appears in the meetings we have read.

27 January 2022Local Renewable Power Generation: Anaerobic Digestion Plant High Level FeasibilityThis meeting.

Every paper for this meeting

All 7 papers in one list, with the item each belongs to, its size, and our copy of it. Download any paper from our archive once signed in; read and search it here with Pro.

PaperSizeOur copy
MinutesItem 30, Minutes
218 KB
Kept 3 Oct
FinalAppendix A, item 32, Local Renewable Power Generation: Anaerobic Digestion Plant High Level Feasibility
1.4 MB
Kept 3 Oct
FinalAppendix B, item 32, Local Renewable Power Generation: Anaerobic Digestion Plant High Level Feasibility
283 KB
Kept 3 Oct
CCAP AD Jan 2022: finalItem 32, Local Renewable Power Generation: Anaerobic Digestion Plant High Level Feasibility
753 KB
Kept 3 Oct
Local Renewable Power Generation: Anaerobic Digestion Plant High Level FeasibilityItem 32, Local Renewable Power Generation: Anaerobic Digestion Plant High Level Feasibility
317 KB
Kept 3 Oct
View item 32. as HTML 41 KBItem 32, Local Renewable Power Generation: Anaerobic Digestion Plant High Level Feasibility
41 KB
Copy queued
Copy on its wayRead here
Feedback from the Climate Change Advisory Panels visitsItem 33, Feedback from the Climate Change Advisory Panels visits
1.7 MB
Kept 3 Oct

Last time, and what carried over

The committee last met on 3 November 2021. 1 of its items lead into this meeting; 3 items are new. Point at any item to follow a thread. Procedural items are left out.

Nov3
3 November 20218 items, 7 papers
Held
carried over
Jan27
27 January 20226 items, 7 papers
Held
22
MinutesTo approve as a correct record the minutes of the meeting of the...
25
Update on the Council's decarbonation plansThe Advisory Panel will receive an update from Kevin Gibbs, Executive...
28
Date of next Meeting11 January 2022
30
MinutesNew this time
32
Local Renewable Power Generation: Anaerobic Digestion Plant High Level FeasibilityNew this time
33
Feedback from the Climate Change Advisory Panels visitsNew this time
34
Date of Next Meeting

The threads

  • Date of next Meeting leads to item 34, Date of Next Meeting

Not carried over

Update on the Council's decarbonation plans do not return this time.

See the 3 November meeting

This committee over time

Every Climate Change Advisory Panel meeting we have read, the dates it has set for the future, and each time those dates have changed.

12 meetings, 2021 to 2023Dot size shows the number of papers
202120222023
HeldThis meeting
MeetingItemsPapers
7 Jun 2023Wednesday
0items
0papers
HeldOpen
9 Mar 2023Thursday
7items
3papers
HeldOpen
26 Jan 2023Thursday
5items
2papers
HeldOpen
7 Dec 2022Wednesday
7items
2papers
HeldOpen
10 Oct 2022Monday
8items
8papers
HeldOpen
8 Jun 2022Wednesday
9items
9papers
HeldOpen
25 Apr 2022Monday
8items
3papers
HeldOpen
9 Mar 2022Wednesday
5items
5papers
HeldOpen
27 Jan 2022Thursday, this meeting
6items
7papers
3 Nov 2021Wednesday
8items
7papers
HeldOpen
20 Sep 2021Monday
10items
8papers
HeldOpen
9 Jun 2021Wednesday
10items
2papers
HeldOpen

Follow the Climate Change Advisory Panel

Choose what you want to hear about. The preview is built from this committee's real papers and changes, so you can see what would have reached you.

What should we tell you?

Bracknell Forest, Climate Change Advisory Panel

Climate Change Advisory Panel: 3 kinds of updateBracknell Forest, sent the same day
PDF
7 papers published for 27 JanuaryLocal Renewable Power Generation: Anaerobic Digestion Plant High Level Feasibility and 6 more papers
DAT
Meeting dates updatedAny date added, moved or dropped
DEC
Decisions from 27 JanuaryThe committee's resolutions, the day they are recorded
ABC
"local" found in 1 paperLocal Renewable Power Generation: Anaerobic Digestion Plant High Level Feasibility
Each update links to the paper and the council's own copy
Free: one weekly alert. Pro: every option, the same day. Pro Plus: straight into your own systems.

Free

One alert, sent weekly, on titles and decisions.

£0for good
  • 1 alert, weekly summary
  • Titles and decisions
  • Link to every official paper
Save this alert free
Most chosen

Pro

Unlimited alerts the same day, searching every page.

£99per user a month
  • Unlimited alerts, same day
  • Matches inside every page and appendix
  • Every council, not just this one

Pro Plus

Your team, with every match pushed into your own tools.

£449a month, 3 users included
  • Everything in Pro, for 3 users
  • Alerts as webhooks into Slack or a CRM
  • API key and bulk export of this council

Data licence

Every council's records in your own products and research.

£12,000a year, from
  • Unlimited API and full archive delivery
  • Rights to use the data in your products
  • Back to 2000, every council
Talk to us

Never miss what this committee decides

Papers, decisions and date changes for the Climate Change Advisory Panel, and every other committee you follow, the day they appear.

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies