It was RESOLVED that 1 the contents of this report be noted 2 a report be requested for the June meeting of the Joint Waste Disposal Board setting out proposals for reducing residual waste tonnages at the Recycling Centres, as described at paragraph 6.9 of the report. 3 the proposed route for Council promotion of third-party doorstep collections be endorsed, as described from 6.21.
Word for word from the decision Bracknell Forest published for this meeting.Source: democratic.bracknell-forest.gov.uk
To: re3 Joint Waste Disposal Board Report 24th April 2025
Progress Report Report of the re3 Project Director
1 Purpose of report 1.1 The purpose of this report is to brief the re3 Joint Waste Disposal Board on progress in the delivery of the re3 Joint Waste PFI Contract.
2 Chair Introduction 2.1 Not completed for this report.
3 Recommendation(s) 3.1 That Members note the contents of this report.
3.2That Members request that a report is bought to the June meeting of the JWDB setting out proposals for reducing residual waste tonnages at the Recycling Centres, as described at 6.9.
3.3That Members endorse the proposed route for Council promotion of third-party doorstep collections, as described from 6.21.
4 Reasons for recommendation(s) 4.1 The purpose of this report is to brief Members in relation to progress in delivery of the re3 Joint Waste PFI Contract.
5 Alternative options considered 5.1 None for this report.
6 Supporting information re3 and Council Performance Statistics
6.1The provisional full year recycling rates for 2024/25 are presented below, alongside a comparison for 2023/24.
April 2023- April 2024 - Change March 2024 March 2025 BFC 55.7% 53.6% -2.1% RBC 49.8% 49.3% -0.5% WBC 55.4% 58.2% 2.8%
6.2A full breakdown of the tonnages, for each council, is presented in Appendix One.
6.3Members will observe that the total waste arisings have increased for each council. In Bracknell and Reading the non-recyclable (residual) tonnes have increased more than the recyclable tonnes, leading to a decline in the recycling rate. In Wokingham, the opposite is true, leading to an increase.
6.4In Bracknell, there has been a significant increase in residual waste. This is both in the weighed kerbside waste, and in the apportioned recycling centre waste. There has also been an increase in apportioned rejects from the Material Recycling Facility (MRF) which means that the tonnage of recycled Mixed Dry Recyclables (MDR) has decreased. Overall garden waste tonnes have fallen, and there has been a significant reduction in street sweepings; both of which have contributed to the decline in performance. A slight increase in kerbside food waste tonnages have been seen however, and this may relate to continued work with flats.
6.5In Reading, there has also been an increase in residual waste, both at the kerbside and the recycling centre, but this is to a slightly lesser extent than in Bracknell. As in Bracknell, there has also been an increase in apportioned rejects from the MRF resulting in fewer tonnes of MDR recycled. Reading has not seen the same decline in garden waste that Bracknell has seen but instead has seen a reduction in glass collected at the bring banks. However, in similarity with Bracknell, there has been a positive increase in the kerbside food waste tonnages. Reading had some issues with the delivery of street sweepings in 2023/24, and the correction of that issue in 2024/25 has also had a positive impact.
6.6In Wokingham, there has been an increase in apportioned residual waste from the recycling centres, but this is offset by a significant reduction at the kerbside. A significant proportion of food waste would appear to have been diverted from the residual waste. This follows on from the introduction of alternate weekly collections and the addition of residual waste bins in August 2024. The change in the MDR tonnes have been much less than the food and the increase in apportioned rejects from the MRF has resulted in fewer tonnes of MDR recycled, as seen in Bracknell and Reading. As in Bracknell, overall garden waste tonnes have also fallen.
6.7Members should note that MRF rejects are apportioned across the partnership and the increase is partly affected by changes in processing of this material stream (required to help meet contractual obligations). Officers are also in the process of seeking further detail and analysis from the Contractor.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.