re3 Flexible Plastics Report

Noted Committee 1 paper

Joint Waste Disposal Board noted this item on Thursday 18 September 2025. Below is the council's own wording, with the papers it was decided on.

Item17

Resolved

RESOLVED that: 1 The contents of the report be noted 2 T he continuation of the flexible plastic service to the trial area in 2026/27 as described at 6.20 be approved 3 The indicative costs associated with continued use of bags and comingled collection during a full roll-out from 2027/28 be noted, and the Contractor’s costs of £21k for technical drawings of the MRF be approved so the table of costs can be finalised with capital costs, as described at 6.29.
Word for word from the decision Bracknell Forest published for this meeting. Source: democratic.bracknell-forest.gov.uk

Follow this further

Built from Bracknell Forest's papers

What the report saysPro

Report to Joint Waste Disposal Board

To: re3 Joint Waste Disposal Board Report 18th September 2025

Flexible Plastics Report Report of the re3 Project Director

1 Purpose of report 1.1 The purpose of this report is to brief the re3 Joint Waste Disposal Board on the outcomes of the re3 FlexCollect trial and the options available after the trial ends.

2 Chair Introduction 2.1 Not completed for this report.

3 Recommendation(s) 3.1 That Members note the contents of this report.

3.2That Members approve the continuation of the flexible plastic service to the trial area in 2026/27 as described at 6.20.

3.3That Members note the indicative costs associated with continued use of bags and comingled collection during a full roll-out from 2027/28, and approve the Contractor’s costs of £21k for technical drawings of the MRF so the table of costs can be finalised with capital costs, as described at 6.29.

4 Reasons for recommendation(s) 4.1 The purpose of this report is to brief the re3 Joint Waste Disposal Board on the outcomes of the re3 FlexCollect trial and the options available after the trial ends.

5 Alternative options considered 5.1 This report summarises the options considered.

6 Supporting information Introduction

6.1Simpler Recycling guidelines mean that residents across England, Scotland and Northern Ireland will be able to recycle the same set of materials; making recycling less confusing. Simpler Recycling will mean that all councils must offer kerbside collections of flexible plastics, including bags, film and wrappers from March 31st, 2027.

6.2The FlexCollect project is a research trial, seeking to understand key factors relating to the collection, sorting, processing and transport of high-volume flexible plastics, ahead of these changes to legislation. It is funded by the Flexible Plastic Fund (composed of a number of UK’s leading manufacturers), DEFRA (the Government Department of Environment, Food, and Rural Affairs) and UKRI (UK Research and Innovation). The trial covers different demographics, collection systems and geographies and aims to use insights into operations, yields, recyclability and communications to advance best practice and to stimulate the development of end markets.

6.3The re3 Partnership joined the fully-funded project in 2023 and rolled out kerbside collections of plastic films to ~10,000 properties in each of Bracknell Forest and Reading Borough Councils between September 2023 and July 2024. This represents about 10% of the total re3 households.

6.4Through the FlexCollect project, the re3 Partnership had an opportunity to collect flexible plastics in coloured bags and assess if this could be a way to comply with future legislation. These bags allow the films to clearly be identified as ‘target material’ and manually extracted from other recyclables in the Material Recovery Facility (MRF). The MRF was not designed to process loose plastic films and retrofitting the plant would have been expensive.

6.5The re3 Councils represent two of the ten Councils participating in the FlexCollect project. This report summarises the learning from the re3 trial and also draws upon the experiences of the wider project. It recommends a way forwards, both from 31st March 2026 (when the trial ends) and from 31st March 2027 (when Simpler Recycling requirements commence).

Data and Operational Learning

6.6Areas for the trial were based on waste collection rounds and were selected to representative of the authority areas. Households within the re3 trial areas were issued with 40 bags via doorstep delivery. This was accompanied by an instruction leaflet and cover letter. It was also preceded by an ‘introduction’ leaflet and followed by a ‘nudge’ leaflet, approximately six weeks after the service commencement. Residents can request more bags via a webform and these are delivered via post or doorstep delivery, a few weeks later.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
re3 Flexible Plastics ReportReport 168 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

5 of 6 attended
KR
Councillor Karen Rowland Reading Borough CouncilChair, present
HP
Councillor Helen Purnell Bracknell Forest CouncilVice-Chair, present
MT
Councillor Mary Temperton Bracknell Forest CouncilCommittee Member, present
LT
Councillor Liz Terry Reading Borough CouncilCommittee Member, present
MA
Councillor Martin Alder Wokingham Borough CouncilCommittee Member, apologies
KH
Councillor Katrin HardingCommittee Member, present

On this subject at Bracknell Forest

Search all
  1. re3 Flexible Plastics ReportThis decision
  2. Flexible Plastics ReportNoted

More from Bracknell Forest Joint Waste Disposal Board

All decisions
MeetingDecisionOutcome
11 Jun 2026 Election of ChairRESOLVED that Councillor Finn McGoldrick be elected Chair of the Board for the municipal year 2026/27. Decided Open
11 Jun 2026 Election of Vice-ChairRESOLVED that Councillor Stephen Newton be elected Vice-Chair of the Board for the municipal year 2026/27. Decided Open
11 Jun 2026 re3 Progress ReportRESOLVED that 1 the contents of this report be noted. 2 a proposal on the simplification of the DIY charging structur... Noted Open
11 Jun 2026 re3 Strategy ReportRESOLVED that 1 the re3 Strategy 2026–2031 be approved and progressed through each partner council’s decision-making ... Approved Open
11 Jun 2026 re3 Finance Report - part oneRESOLVED that the year end financial position for FY25/26 be noted. Noted Open