( i ) Cabinet approved the investment of £2m in 2016/17 of Brent capital funding as summarised in Section 6. (ii) Cabinet approved that the major footway upgrade programme element of £1.3m be carried out with pavement slabs being replaced with tarmac (instead of a like-for-like replacement as has been the practice up until now, see section 3.2.1). (iii) Cabinet approved the proposed additional highways investment programme for 2016-17 as detailed in Appendix B. (iv) Cabinet approved that, the major footway upgrade programme of £1.510m approved in the Highways Capital Scheme Programme 2016-17, approved at the 14th March 2016 Cabinet, is carried out with the pavement slabs being replaced with tarmac as a default. Category 1 &2 footways and conservation areas will be considered on a case by case basis, but will normally be replaced like for like. (Appendix E)(see section 3.2.12) (iv) Cabinet agreed that the “Footway upgrades – short sections” pavement allocation of £ 0.150m approved in the Highways Capital Scheme Programme 2016-17, approved at the 14th March 2016 Cabinet, is carried out with: a) in conservation areas or Category 1 & 2 footways, considered on a road by road basis but generally slabs (See section 3.2.12); b) where the length to be replaced is junction to junction, the pavement slabs being replaced with tarmac – even though it may only be only side of the street only; c) otherwise, for sections shorter than junction to junction, pavement surface to be replaced like for like.
Word for word from the decision Brent published for this meeting.Source: democracy.brent.gov.uk
1.1Our highways infrastructure (including roads and pavements) is the asset most used by the public and the most visible. In common with other Highway Authorities, Brent has an increasing maintenance requirement which cannot be met through a standstill budget. Currently estimated in Brent at £100m, more defects are appearing year on year. Against this, public expectations are rising with more customer reports of highways defects every year asking for these to be repaired.
1.2An increase in the level of investment to maintain the highway network is required to respond to public concerns, make it safer and fit-for-purpose, and to improve public satisfaction.
1.3The Highways Capital Scheme Programme 2016-17, approved at the 14th March 2016 Cabinet, set out proposals to allocate £3.55m of Brent capital to maintain the highway network. At that time the report noted that future investment would be required to:
achieve greater equality in condition between roads and pavements; address localised conditions in an area patching programme to extend the life of roads; accommodate members’ requests to regenerate High Streets by giving them greater priority, so improving their look and feel; and consider alternative materials, for instance replacing slabs with tarmac when doing full pavement renewals, to make limited resources stretch further.
Proposals for further investment of £2m in the highway network (roads and pavements) are set out in this report.
Cabinet 23 May 2016 Version 8.1 10 May 2016 1.4 As well as increased investment, we can improve how we manage our highway infrastructure and offer a better customer service experience to our residents and businesses. We have made a start in implementing an asset management approach through establishing a Highway Asset Management Plan.
1.5Being more efficient in how and where the investment is spent, requires confidence in our information and the ability to analyse it, including budget vs condition level modelling scenarios. We are investigating a “Brent Asset Management Tool”, a computer tool which would allow funding allocations to be better targeted for the best effect, including indicative treatment types from the condition data that will optimize the life of roads and pavements.
1.6Improvement in our asset management processes could also help secure future grant allocations, should TfL follow the DfT in changing the basis for funding allocation, as anticipated. Over a 5 year period the DFT will increase the proportion of Incentive funding that is based on “performance” (as measured by the level of asset management maturity reached); whilst the proportion that is based on ‘need’ will lessen. TfL are considering reforming the allocation of maintenance funding for Principal Roads in London to be along the same lines as the DfT model.
Recommendations
2.1That the Cabinet approves the investment of £2m in 2016/17 of Brent capital funding as summarised in Section 6.
2.2That the major footway upgrade programme element of £1.3m is carried out with pavement slabs being replaced with tarmac (instead of a like-for-like replacement as has been the practice up until now, see section 3.2.1).
2.3That the Cabinet approves the proposed additional highways investment programme for 2016-17 as detailed in Appendix B.
2.4That, the major footway upgrade programme of £1.510m approved in the Highways Capital Scheme Programme 2016-17, approved at the 14th March 2016 Cabinet, is carried out with the pavement slabs being replaced with tarmac as a default. Category 1 &2 footways and conservation areas will be considered on a case by case basis, but will normally be replaced like for like. (Appendix E)(see section 3.2.12)
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Minutes of the Previous MeetingCabinet RESOLVED that the minutes of the previous meeting held on Monday 12 October 2026 be approved as a correct rec...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.