CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
London Borough of Brent
Planning Committee, Wednesday 8 June 2016 at 7.00pm

All Units, Watling Gate, Edgware Road, Kingsbury, London, NW9 6NB (Ref. 15/3639)

Refused Planning 2 papers

Planning Committee refused this item on Wednesday 8 June 2016. Below is the council's own wording, with the papers it was decided on.

Item3

Resolved

DECISION: Refused planning permission as recommended. (Voting: unanimous).
Word for word from the decision Brent published for this meeting. Source: democracy.brent.gov.uk

Follow this further

Built from Brent's papers

What the report saysPro

Report to Planning Committee

COMMITTEE REPORT Planning Committee on 8 June, 2016 Item No Case Number 15/3639

SITE INFORMATION RECEIVED: 20 August, 2015

WARD: Fryent

PLANNING AREA: Brent Connects Kingsbury & Kenton

LOCATION: All Units, Watling Gate, Edgware Road, Kingsbury, London, NW9 6NB

PROPOSAL: Demolition of existing four storey building used as offices (Use class B1) and adult learning centre (Use class D1) and erection of part 5, 6 and 7 storey building providing 43 residential units (21 x 1bed, 12 x 2bed and 10 x 3bed) and office space (Use class B1) on the ground floor with associated basement level car parking, cycle parking spaces, alterations to existing vehicular crossover, landscaping and amenity space

APPLICANT: Handover Ltd

CONTACT: Churchill Hui Architects

PLAN NO'S: 5475 P500 - Location Plan

5475 EX2 101 - Existing Basment Floor Plan 5475 EX2 102 - Existing Upper Ground Floor Plan 5475 EX2 103 - Existing First Floor Plan 5475 EX2 104 - Existing Second Floor Plan 5475 EX2 105 - Existing Third Floor Plan 5475 EX3 101 - Existing Site Elevation North East 5475 EX3 102 - Existing Site Elevation North West 5475 EX3 103 - Existing Site Elevation South West 5475 EX3 104 - Existing Site Elevation South East

5475 P501 Rev A - Site Layout & Roof Plan 5475 P502 Rev A - Contextual Elevations 5475 P503 Rev A - Contextual Sections 5475 P504 Rev A - Floor Plan Basement (Level 0) 5475 P505 Rev A - Floor Plan Ground Floor (Level 1) 5475 P506 - Floor Plan First Floor (Level 2) 5475 P507 - Floor Plan Second & Third Floors (Levels 3-4) 5475 P508 - Floor Plan Fourth Floor (Level 5) 5475 P509 Rev A - Floor Plan Fifth Floor (Level 6) 5475 P510 Rev A - Floor Plan Sixth Floor (Level 7) 5475 P511 Rev A - Roof Plan

Accompanying documents

Environmental Noise Report - prepared by Sharps Redmore Acoustic Consultants Travel Plan prepared by TTP Consulting Residential Travel Plan prepared by TTP Consulting Car Park Amendments prepared by TTP Consulting Contaminated Land Risk Assessment - Phase 1 Desk Top Study prepared by Soil Environment Services Ltd with Appendix A and B Air Quality Assessment prepared by Air Quality Consultants

DocRepF Document Imaged Ref: 15/3639 Page 1 of 31 Energy Statement prepared by energy test Sustainable Drainage Assessment prepared by Fairhurst Consulting Engineers Summary of Compliance Criteria for Building Regulation Part G prepared by energy test

LINK TO When viewing this on an Electronic Device DOCUMENTS Please click on the link below to view ALL document associated to case ASSOCIATED TO <https://pa.brent.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=DCAPR_123699> THIS APPLICATION When viewing this as an Hard Copy

Please use the following steps

1. Please go to pa.brent.gov.uk 2. Select Planning and conduct a search tying "15/3639" (i.e. Case Reference) into the search Box 3. Click on "View Documents" tab

__________________________________________________________ SITE MAP Planning Committee Map Site address: All Units, Watling Gate, Edgware Road, Kingsbury, London, NW9 6NB

© Crown copyright and database rights 2011 Ordnance Survey 100025260

This map is indicative only. SELECTED SITE PLANS SELECTED SITE PLANS

Site Layout plan

DocRepF Document Imaged Ref: 15/3639 Page 2 of 31 Proposed ground floor and site plan Proposed basement plans (Level -1 and Level 0) Proposed first floor plan

DocRepF Document Imaged Ref: 15/3639 Page 3 of 31 Proposed fifth floor plan Proposed sixth floor plan

Proposed east (front) elevation Proposed north elevation

Proposed west elevation

Proposed sections

DocRepF Document Imaged Ref: 15/3639 Page 4 of 31 Massing model

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
All Units, Watling Gate, Edgware Road, Kingsbury, London, NW9 6NB (Ref. 15/3639)Report 922 KB DownloadRead as text
PDF
Supp 3 Watling Gate 15-3639Report 93 KB Download

At this meeting

Whole meeting

Who was there

10 of 13 attended
SM
Councillor Sarah MarquisChair, present
AA
Councillor Amer Agha MB BS, MSc, PHCMVice-Chair, present
MD
Councillor Mary DalyCommittee Member, present as substitute
OH
Councillor Orleen HyltonCommittee Member, present
JL
Councillor Janice LongCommittee Member, apologies, sent representative
SK
Councillor Sandra KabirCommittee Member, present as substitute
JM
Councillor Joshua Mitchell MurrayCommittee Member, present
RM
Councillor Ruth MoherCommittee Member, apologies, sent representative
BP
Councillor Barbara PitruzzellaCommittee Member, present
MM
Councillor Michael MauriceCommittee Member, present
BC
Councillor Bernard Collier MBA, DMS, BA (Hons)Committee Member, in attendance
RP
Councillor Rameshchandra PatelCommittee Member, in attendance

All 13 on the meeting page

On this subject at Brent

Search all
  1. All Units, Watling Gate, Edgware Road, Kingsbury, London, NW9 6NB (Ref. 15/3639)This decision
  2. 23/0176 - All Units at Dowlings Parade, HNS Autos and Delta Hand Car Wash, Bridgewater Road, Wembley, HA0 1AJAgreed
  3. 20/3156 1-26A, Coachworks & Storage areas, Abbey Manufacturing Estate, all units Edwards Yard, Mount Pleasant, Wembley, HA0Decided
  4. 18/4777 All Units at 4-9 INC, and Garages rear of 4-9 Gladstone Parade, Edgware Road, Cricklewood, LondonDecided
  5. 18/4919 1-26A, coachworks & storage areas, Abbey Manufacturing Estate, all units Edwards Yard, Mount Pleasant, Wembley, HA0Deferred
  6. 18/4919. 1-26A, coachworks & storage areas, Abbey Manufacturing Estate, all units Edwards Yard, Mount Pleasant, Wembley, HA0Deferred

More from Brent Planning Committee

All decisions
MeetingDecisionOutcome
5 Aug 2026 Apologies for AbsenceApologies for absence were received from Councillor Gallagher with Councillor Ahmadi-Moghaddam substituting. Apologie... Decided Open
5 Aug 2026 Declarations of interestsNo declarations of interest were made during the meeting. Decided Open
5 Aug 2026 Minutes of the previous meetingRESOLVED that the minutes of the previous meeting held on Thursday 2 July 2026 be approved as a correct record of the... Approved Open
5 Aug 2026 26/0225 - Brent NHS Primary Care Trust, Wembley Centre For Health & Care, 116 Chaplin Road, Wembley, HA0 4UZGranted planning permission subject to: (1) The prior completion of a satisfactory legal agreement; and (2) The condi... Agreed Open
5 Aug 2026 Any Other Urgent BusinessThere was no other urgent business. Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies