Granted planning permission subject to: (1) The application’s referral to the Mayor of London (Stage 2 referral) and the prior completion of a legal agreement to secure the planning obligations as detailed in the main and updated within the supplementary committee reports, together with: · Provision to include the requirement for an outdoor gym facility to be added within condition in the Community Use Agreement to be secured as part of the legal agreement; · Definition of intermediate housing within the legal agreement to capture a range of intermediate products; · The review mechanisms to be secured as part of the legal agreement to include the requirement to change intermediate housing to social housing where viability allows. (2) The conditions and informatives , as detailed in the main and amended within the supplementary committee reports.
Word for word from the decision Brent published for this meeting.Source: democracy.brent.gov.uk
Case Ref: 24/1804 Page 1 of 6 Supplementary Information 11 December, 2024
Agenda Item 04 Supplementary Information Planning Committee on 11 December, Case No. 24/1804 2024 __________________________________________________ Location College of North West London Willesden, Dudden Hill Lane, London, NW10 2XD Description Hybrid planning application comprising: Full planning permission for the demolition of existing buildings and structures within ‘Phase 1’ and all site preparation works, and redevelopment with mixed-use buildings providing residential homes (Use Class C3), flexible commercial, retail and leisure space (Class E), workspace (Use Class E(g)), associated cycle and vehicle parking, new and altered vehicular accesses and other associated highways works, hard and soft landscaping including creation of new and upgrades to existing public open space, and all associated ancillary and engineering works; and
Outline planning permission for the demolition of all existing buildings and structures within the rest of the Site, and redevelopment with a series of new mixed-use buildings accommodating residential homes (Use Class C3), flexible commercial, retail, workspace and leisure space (Class E), community space (Use Class F), and flexible nursery/community/medical floorspace (Use Classes F/E(e)/E(f)), associated cycle and vehicle parking, new and altered vehicular accesses and other associated highways works, hard and soft landscaping including creation of new and upgrades to existing public open space, and all associated ancillary and engineering works, with all matters reserved except for means of access.
Further explanation (not forming part of the formal description of development set out above):
The proposed development is formed of two phases: Phase 1 is applied for in detail, and includes the construction of 11 new blocks (Blocks C-H, J, K, V, W and Y) to provide 1,076 residential dwellings (Use Class C3), comprising heights of between 4, 5, 10, 11, 15, 17, 22, 24 and 28 storeys (up to 98.5 AODm). The development also proposes 3,354 sqm of flexible retail, commercial and leisure floorspace (Use Class E) (which includes 1,173 sqm of gym floorspace) at lower levels of these blocks.
Phase 2 is applied for in outline, and includes the provision of up to 3,500 sqm (GIA) of new land use floorspace within 11 new blocks (Blocks A, B, L-N, and P-U) comprising heights of between 4, 5, 6, 11, 14, 16 and 17 storeys (up to 100.2 AODm), with the maximum quantum as follows:
· flexible retail, commercial and leisure floorspace (Use Class E): up to a maximum of 1,500sqm · community floorspace (Use Class F): up to a maximum of 1,000sqm · nursery or local community/ medical floorspace (Use Class F/E(e)/E(f): up to a maximum of 1,000sqm, · C3 Residential: up to 57,500 sqm (approximately 551 homes).
Agenda Page Number: 5-82
Further representations
Two further representations have been received from adjoining occupiers, objecting to the proposed development. The comments raised are summarised as follows:
· Proposed development would result in excessive density and heights, causing overshadowing, loss of privacy and diminished quality of life to nearby residents, and heights out of character; · Increased fire safety risk due to tall buildings; · Detrimental impact on local infrastructure and services; · Lack of affordable housing to meet local need – too many proposed as social rent or shared ownership; DocSuppF Document Imaged Ref: 24/1804 Page 1 of 6 · Impact on adjoining SINC/ wider environmental impacts; · Lack of local benefit and catering too much for private market; · Proposed development would be harmful to townscape value; · Detrimental to public health and harm to local social infrastructure within the Borough. · Officer comments: These issues are all considered to be addressed in sufficient detail within the detailed considerations of the main committee report.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Minutes of the previous meetingRESOLVED that the minutes of the previous meeting held on Thursday 2 July 2026 be approved as a correct record of the...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.