Resolved
That the application be granted subject to the conditions contained in the report of the Corporate Director Communities.
Development Control Committee decided this item on Thursday 7 January 2016. Below is the council's own wording, with the papers it was decided on.
Resolved
That the application be granted subject to the conditions contained in the report of the Corporate Director Communities.
RECOMMENDATION : GRANT WITH CONDITIONS
REFERENCE: P/15/594/FUL APPLICANT: MR NATHAN HILL 4 HEOL CROES FAEN PORTHCAWL
LOCATION: 4 HEOL CROES FAEN NOTTAGE PORTHCAWL
PROPOSAL: CREATE NEW FIRST FLOOR BY ALTERING ROOF PITCH, NEW TWO STOREY SIDE EXTENSION AND DORMER EXTENSIONS
RECEIVED: 9th September 2015
SITE INSPECTED: 30th September 2015
APPLICATION/SITE DESCRIPTION
The application seeks consent to increase the pitch of the roof of the bungalow to create floorspace at first floor level. This would transform the property into a dormer bungalow. The overall height of the property would increase by 2.2m (from 4.8m to 7m).
As part of the development, a two-storey extension would be constructed on the south-eastern (side) elevation of the property, thereby altering the footprint of the dwelling to an L-shape. This would consist of a single-storey element with dormers in the loft space. This extension would measure 2.6m x 6.3m, reaching maximum heights of 2.5m (eaves) and 6m (ridge).
Four dormer-type extensions would be located on the roof of the property, all of which would be identical in scale, design and appearance (3m wide, maximum projection of 2.7m, with a pitched roof reaching a maximum height of 2.5m). Two of the dormers would be located on the north- western (side) elevation of the main roof of the property, whilst two dormers would be located on either side of the roof of the proposed two-storey extension.
RELEVANT HISTORY
None.
PUBLICITY
Neighbours have been notified of the receipt of the application. The period allowed for response to consultations/publicity expired on 27 October 2015.
NEGOTIATIONS
The agent was requested to submit amended plans to amend the design and appearance of the development, with particular regards to windows, the appearance of the front elevation and external finishes.
CONSULTATION RESPONSES Town/Community Council Observations Notified on 29th September 2015 No objections to the proposal.
Head Of Street Scene (Highways) No objections to the proposal. Destination & Countryside Management No objections to the proposal subject to advisory notes. Welsh Water Developer Services No objections to the proposal subject to an advisory note.
REPRESENTATIONS RECEIVED Objections have been received from the following residents:
10, 11, 12, 14, 15, 18, 19, 20, 21, 22, 24, 26, 27, 31, 32, 34, 36, 38, 39 Heol Croes Faen
1. The proposal would set an undesirable precedent within the street since the bungalows are predominantly one level with the same roof line. The development, therefore, would be out of character with its surroundings, including the adjacent Nottage Conservation Area.
2. Insufficient space for off-street parking to accommodate the extended dwelling and highway safety.
COMMENTS ON REPRESENTATIONS RECEIVED
Refer to the appraisal section of the report with regards to the response to the objections received.
APPRAISAL
The application is reported to Committee in view of the number of objections received.
The application property forms part of an estate in which the street-scene appearance has largely remained unaltered since originally constructed. Having regard to the layout of the estate, the application site is located at the end of the cul-de-sac rather than being part of the prevalent fabric of the street which is characterised by a long straight road extending to the north.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
P/15/594/FUL: 4 HEOL CROES FAEN NOTTAGE PORTHCAWLReport | 1.1 MB | DownloadRead as text |
Follow Development Control Committee at Bridgend and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 19 Oct 2023 | Site VisitsThat a date for any site visits agreed by the Committee or identified in advance of the next meeting by the Chairpers... | Agreed | Open |
| 19 Oct 2023 | Approval of MinutesThat the Minutes of a meeting of the Development Control Committee dated 7 September 2023, be approved as a true and ... | Approved | Open |
| 19 Oct 2023 | Amendment SheetThe was accepted by the Chairperson as an urgent item under Part 4, paragraph 4 of the Council Procedure Rules. | Decided | Open |
| 19 Oct 2023 | Development Control Committee GuidanceThat the report of the Corporate Director – Communities, outlining the be noted. | Noted | Open |
| 19 Oct 2023 | P/23/147/FUL - Rear of 82 Merthyr Mawr Road, Bridgend, CF31 3NSThat the above application be granted, subject to the Conditions contained in the report of the Corporate Director – ... | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.