Resolved
(A) That the application be referred to Council as a proposal that is a technical departure from the Development Plan that the Development Control Committee are not disposed to refuse the restoration as the extension to the building is on land for which the original storage use was granted under the Unitary Development Plan and it would not be so detrimental to the surrounding countryside. (B) That if Council resolve to approve the proposal then the following conditions be included on the consent: 1. Notwithstanding the time limit given to implement planning permissions as prescribed by Sections 31 and 32 of the 1990 Town and Country Planning Act (as amended) this permission, being a retrospective permission as prescribed by Section 73A of the above Act, shall have been deemed to have been implemented on 27 April 2016. Reason: To comply with Section 73A of the above Act. 2. Within 1 month of the date of this consent a scheme of remedial works to treat any areas of shallow mine workings present beneath the extension shall be submitted to and agreed in writing with the Local Planning Authority. Any remedial works identified shall be implemented within 3 months of the date of this consent. Reason: To ensure the safety and stability of this development within the Development High Risk Area. 3. The development shall be carried out in accordance with condition 1. above and the approved plans labelled DRAWING: PLAN AND SECTION and DRAWING: ELEVATIONS and date stamped 27 April 2016. Reason: To avoid doubt and confusion as to the nature and extent of the approved development.