P/16/603/BCB - Land off Penprysg Road, Pencoed

Approved Planning 1 paper

Development Control Committee approved this item on Thursday 29 September 2016. Below is the council's own wording, with the papers it was decided on.

Item810

Resolved

That in accordance with Regulation 4 of the Town and Country Planning General Regulations 1992, that permission be deemed to be granted for the following application, subject to the Conditions contained in the report of the Corporate Director Communities:- Code No. Proposal P/16/603/BCB New Primary School and site access works Subject to the following:- Combine conditions 2-5, amend conditions 10-12, 15 and 19, remove conditions 16 and 17 and add a note. For ease of reference the revised conditions and notes are as follows:- 1. The development shall be carried out in accordance with the following approved plans and documents:- ARCHITECTURAL DRAWINGS A001 - Site Location Plan A002 - Existing Site Layout / Topographical Survey A100 - Proposed Site Layout Overall A101 - Proposed Site Layout Area 1 A102 - Proposed Site Layout Area 2 A103 - Proposed General Arrangement Ground Floor Plan A104 - Proposed General Arrangement First Floor Plan A105 - Proposed General Arrangement Elevations A119 - Site Layout Contractors Constraints A120 - Hoarding Details / Temporary Works / Site Sign Board A123 - Proposed 3D Model A600 - External Signage A909 - Fencing Details (Sheet 1) A910 - Fencing Details (Sheet 2) A911 - External Works – Sections (Sheet 1) A912 - External Works – Sections (Sheet 2) A913 - External Works – Sections (Sheet 3) A916 - External Works – Play Area (Sheet 1) A917 - External Works – Play Area (Sheet 2) A918 - External Works – Planting (Sheet 1) A919 - External Works – Planting (Sheet 2) A920 - Nursery Store / PE Store DRAINAGE ENGINEERING DRAWINGS PCD-CAP-00-00-DR-P-506 Rev P00 - Proposed Surface Water Drainage Layout PCD-CAP-00-000-DR-P-507 Rev P01 - Proposed Foul Drainage Layout HIGHWAYS ENGINEERING DRAWINGS GC2347-CAP-61-XX-DR-C-001 - General Arrangement Planning GC2347-CAP-61-XX-DR-C-002 - Contours & Detailed Sections GC2488-CAP-61-XX-DR-C-001 - General Arrangement Traffic Calming GC2347-CAP-61-XX-DR-E-001 - Proposed Lighting Arrangements OTHER DOCUMENTS Ecological Appraisal & Summary of BREEAM Ecology Credits Ecology BREEAM Summary Report BREEAM Pre-Assessment Report Drainage Strategy Report Traffic Impact Assessment Site Investigation Report Reason: To avoid doubt and confusion as to the nature and extent of the approved development. 2. No development shall take place, including any works of site clearance until a Construction Method Statement has been submitted to and agreed in writing by the Local Planning Authority. The statement shall provide for:- The routeing of HGV construction traffic to/from the site The parking of vehicles of site operatives and visitors; A scheme for the provision of a compound and car park for construction vehicles Loading and unloading of plant and materials; Storage of plant and materials used in constructing the development; Mechanical, automatically operated, self-contained wheel washing facilities A temporary/permanent access road/hardstanding Measures to control the emission of dust and dirt during construction; The provision of temporary traffic management during the construction period; No construction vehicles entering or leaving the site during the periods of half hour either side of the times school commencing and ending. The construction works and site clearance shall thereafter be undertaken in accordance with the agreed ... view the full minutes text for item 810.
Word for word from the decision Bridgend published for this meeting. Source: democratic.bridgend.gov.uk

Follow this further

Built from Bridgend's papers

What the report saysPro

Report to Development Control Committee

REFERENCE: P/16/603/BCB

APPLICANT: Bridgend County Borough Council Director of Education & Family Support Level 2 Civic Offices, Angel Street, Bridgend CF31 4WB

LOCATION: Land off Penprysg Road, Pencoed CF35 6RH

PROPOSAL: New primary school and site access works

RECEIVED: 28 July 2016

SITE INSPECTED: 19 September 2016

APPLICATION/SITE DESCRIPTION The site is situated to the northern end of the village of Pencoed. It has a total area of 34,222 sq m with approximately 2,500 sq m in the eastern corner of the site b e i n g dense woodland. The site is accessed via a narrow lane from Penprysg Road which has residential properties each side (numbers 38 and 40 Penprysg Road).

The site changes in level by approximately 10m from the north corner to the south corner. Currently on site are school buildings, located to the south western corner of the site, which comprise a 2 class teaching block, a sports hall (with associated changing facilities) and a kitchen/canteen facility.

The rear gardens for numbers 40 to 70 Penprysg Road back directly onto the site along the western boundary, some of which appear to have gated access into the site.

The proposal is to provide a new 2.5 f orm e ntry Primary School with additional Special Educational Needs (SEN) accommodation and Nursery.

The Pencoed Scheme is a key element in the Authority’s Schools Modernisation Programme and also forms part of Band A of the Authority’s submission to the Welsh Government’s (WG) 21st Century Schools Programme.

The application is accompanied by:- • Ecological Appraisal & Summary of BREEAM Ecology Credits • Ecology BREEAM Summary Report • BREEAM Pre-Assessment Report • Drainage Strategy Report • Traffic Impact Assessment • Site Investigation Report

RELEVANT HISTORY P/16/463/DPN - Prior notification to demolish single storey canteen block, gymnasium block, teaching block and 2 storey house at 38 Penprysg Road : Under the provisions of the Town and County Planning (General Permitted Development) Order 1995 (As Amended), the demolition works constitute permitted development and the Council does not seek to prior approve the proposed method of demolition and the proposed restoration of the site. PENPR

D FRW TAN TCB -Y-B

MINF

1 RYN Application Number

13 36 )

1 19 4

43 38

44 74 2

1 P/16/603/FUL

1 38a

72 48 ) LB

35 11 el ap

5 9 Ty-newdd Ch

7 61

IL O Ty Saith yn

21 EFA 6 R Ton Bach

6 w

C

37 G Farm

H Ty

C AE T 39

AR

E'R

CA DC 51.6m

L

E CA 35

'R B ALCEN 36

5 3 31

ER LLA 13

11 16 11 2

N 4 1 Penuel Baptist Play Area Chapel Highfield

26 Avoncroft 68

16 ry

19 ete

AD m Ce

RO SG RY NP PE

St David's Church 47.0m Playing Field 40

MP 186.25 Pencoed 38

Primary School Garage ale nd Gle

36 30

27 1 Bont Newydd 17

PE 17 NT 132

RE Ty Su b es ug 120 HO El 9

W Nicholas S ta Ga EL 108 37.3m L 98 idg e 86 Br

74 Tregroes Bungalow

10 72

Yard

AD 2

RO 64 Builders

NT Y BO N PE 54 k ac Tr

Liby 48 Track 9

Mark Shephard Scale 1:2,000 Corporate Director-Communities (c) Crown Copyright and database rights (2016) Ordnance Survey (100023405)

 Date Issued: 23/09/2016

Development-Mapping Communities Directorate, Bridgend County Borough Council, Civic Offices, Angel Street, Bridgend CF31 4WB.

O/Drive/Plandraw/new MI layouts/ (c) Hawlfraint a hawliau cronfa ddata'r Goron (2016) Rhif Trwydded yr Arolwg Ordnans (100023405)

(c) Cities Revealed Aerial Photography copyright, The Geoinformation Group (2009) Tel: 01656 643176 Committee DC Plan PUBLICITY The proposal has been advertised on site and in the press. Neighbours have been notified of the receipt of the application. The period allowed for response to consultations/publicity expired on 26 August 2016

CONSULTATION RESPONSES Welsh Water Developer Services has no objection subject to a condition and advisory notes.

Natural Resources Wales express concern with regard to European Protected Species but no other objection provided conditions in this respect are attached to any consent.

Head of Street Scene (Highways) has no objections subject to conditions.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
P/16/603/BCB: Land off Penprysg Road, PencoedReport 458 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

13 of 27 attended
NC
Councillor Norah ClarkeCommittee Member, present
PD
Councillor Pam DaviesCommittee Member, apologies
WD
Councillor Wyn Davies MBECommittee Member, apologies
RD
Rhodri DaviesPublic, in attendance
LE
Councillor Luke EllisCommittee Member, absent
CF
craig flowerOfficer, in attendance
MG
Mark GalvinOfficer, in attendance
TG
Tony GodsallOfficer, in attendance
CG
Councillor Cheryl GreenCommittee Member, present
JJ
Julie JenkinsOfficer, in attendance
RJ
Rod JonesOfficer, in attendance
DL
Councillor David LewisCommittee Member, apologies

All 27 on the meeting page

On this subject at Bridgend

Search all
  1. P/16/603/BCB - Land off Penprysg Road, PencoedThis decision
  2. P/20/307/BCB - Land off Isfryn Industrial Estate (access from A4093),Blackmill, Bridgend, CF35 6EQDecided
  3. P/19/466/BCB - Land At Brynteg Upper School, Ewenny Road, BridgendApproved
  4. P/16/930/bcb - land off north road, bridgend industrial estateAgreed
  5. BCBC - Joint Housing Land Availability Study 2016Noted
  6. P/16/385/BCB - Land Rear 297 - 311 Erw Hir, BracklaDecided

More from Bridgend Development Control Committee

All decisions
MeetingDecisionOutcome
19 Oct 2023 Site VisitsThat a date for any site visits agreed by the Committee or identified in advance of the next meeting by the Chairpers... Agreed Open
19 Oct 2023 Approval of MinutesThat the Minutes of a meeting of the Development Control Committee dated 7 September 2023, be approved as a true and ... Approved Open
19 Oct 2023 Amendment SheetThe was accepted by the Chairperson as an urgent item under Part 4, paragraph 4 of the Council Procedure Rules. Decided Open
19 Oct 2023 Development Control Committee GuidanceThat the report of the Corporate Director – Communities, outlining the be noted. Noted Open
19 Oct 2023 P/23/147/FUL - Rear of 82 Merthyr Mawr Road, Bridgend, CF31 3NSThat the above application be granted, subject to the Conditions contained in the report of the Corporate Director – ... Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies