Resolved
That in accordance with Regulation 4 of the Town and Country Planning General Regulations 1992, that permission be deemed to be granted for the following application, subject to the Conditions contained in the report of the Corporate Director Communities:- Code No. Proposal P/16/603/BCB New Primary School and site access works Subject to the following:- Combine conditions 2-5, amend conditions 10-12, 15 and 19, remove conditions 16 and 17 and add a note. For ease of reference the revised conditions and notes are as follows:- 1. The development shall be carried out in accordance with the following approved plans and documents:- ARCHITECTURAL DRAWINGS A001 - Site Location Plan A002 - Existing Site Layout / Topographical Survey A100 - Proposed Site Layout Overall A101 - Proposed Site Layout Area 1 A102 - Proposed Site Layout Area 2 A103 - Proposed General Arrangement Ground Floor Plan A104 - Proposed General Arrangement First Floor Plan A105 - Proposed General Arrangement Elevations A119 - Site Layout Contractors Constraints A120 - Hoarding Details / Temporary Works / Site Sign Board A123 - Proposed 3D Model A600 - External Signage A909 - Fencing Details (Sheet 1) A910 - Fencing Details (Sheet 2) A911 - External Works – Sections (Sheet 1) A912 - External Works – Sections (Sheet 2) A913 - External Works – Sections (Sheet 3) A916 - External Works – Play Area (Sheet 1) A917 - External Works – Play Area (Sheet 2) A918 - External Works – Planting (Sheet 1) A919 - External Works – Planting (Sheet 2) A920 - Nursery Store / PE Store DRAINAGE ENGINEERING DRAWINGS PCD-CAP-00-00-DR-P-506 Rev P00 - Proposed Surface Water Drainage Layout PCD-CAP-00-000-DR-P-507 Rev P01 - Proposed Foul Drainage Layout HIGHWAYS ENGINEERING DRAWINGS GC2347-CAP-61-XX-DR-C-001 - General Arrangement Planning GC2347-CAP-61-XX-DR-C-002 - Contours & Detailed Sections GC2488-CAP-61-XX-DR-C-001 - General Arrangement Traffic Calming GC2347-CAP-61-XX-DR-E-001 - Proposed Lighting Arrangements OTHER DOCUMENTS Ecological Appraisal & Summary of BREEAM Ecology Credits Ecology BREEAM Summary Report BREEAM Pre-Assessment Report Drainage Strategy Report Traffic Impact Assessment Site Investigation Report Reason: To avoid doubt and confusion as to the nature and extent of the approved development. 2. No development shall take place, including any works of site clearance until a Construction Method Statement has been submitted to and agreed in writing by the Local Planning Authority. The statement shall provide for:- The routeing of HGV construction traffic to/from the site The parking of vehicles of site operatives and visitors; A scheme for the provision of a compound and car park for construction vehicles Loading and unloading of plant and materials; Storage of plant and materials used in constructing the development; Mechanical, automatically operated, self-contained wheel washing facilities A temporary/permanent access road/hardstanding Measures to control the emission of dust and dirt during construction; The provision of temporary traffic management during the construction period; No construction vehicles entering or leaving the site during the periods of half hour either side of the times school commencing and ending. The construction works and site clearance shall thereafter be undertaken in accordance with the agreed ... view the full minutes text for item 810.