Resolved
That the content of the report and the 2017 Audit of Outdoor Sport and Children’s Playing Space attached at Appendix 1, be noted.
Development Control Committee noted this item on Thursday 17 August 2017. Below is the council's own wording, with the papers it was decided on.
Resolved
That the content of the report and the 2017 Audit of Outdoor Sport and Children’s Playing Space attached at Appendix 1, be noted.
3.1The Planning and Compulsory Purchase Act 2004 requires Local Planning Authorities (LPAs) to prepare Local Development Plans. Section 61 of the Act requires LPAs to keep under review all matters that are expected to affect development of its area in order that policies and proposals are founded on a thorough understanding of the area’s needs, opportunities and constraints. This duty requires Authorities to maintain and continually develop an up-to-date information base, concerning economic, environmental and social characteristics of their areas.
3.2As part of this statutory duty the LPA has updated previous Audits of Outdoor Sport and Children’s Playing Space which were undertaken in 2009.
3.3The updated 2017 Audit of Outdoor Sport and Children’s Playing Space is attached at Appendix 1 to this report.
3.4The Audit compares the provision of Outdoor Sport and Children’s Playing Space with the benchmark standards endorsed by Fields in Trust (FIT) which are also the standards of provision set out in the Council’s LDP, Policy COM 11 (relating to the provision of Outdoor Recreational Facilities).
3.5The adopted standards are:-
• 1.6 hectares per 1000 population for Outdoor Sport; and
• 0.8 hectares per 1000 population for Children’s Playing Space
This equates to an overall standard of 2.4 hectares per 1000 population. 3.6 The provision of Equipped Children’s Playgrounds is also assessed as part of this updated Audit as a ‘sub-set’ of overall Children’s Playing Space, at a separate FIT benchmark standard of 0.25 hectares per 1000 population.
4. Current Situation
4.1The overall findings for the County Borough as a whole is that there is a surplus of approximately 7.5 hectares of Outdoor Sport and Children’s Playing Space (based on the 2016 MYE population) and a surplus of 16.5 hectares of Outdoor Sport and Children’s Playing Space (based on the 2011 Census population).
4.2The Sub-Area and Ward analysis included in the document is based on the 2011 Census population (due to the unavailability of more up-to-date population data at the sub Local Authority level).
4.3At the Sub-Area level, the overall surplus of provision across the County Borough is translated into overall deficits within the Llynfi Valley, Garw Valley, Valleys Gateway and Porthcawl with surpluses in overall provision in the Sub-Areas of the Ogmore Valley, Pencoed, Bridgend and Pyle-Kenfig.
4.4There is considerable variation across the County Borough in terms of the different types of Outdoor Recreation Facility provision (Outdoor Sport and Children’s Playing Space), as well as for Equipped Children’s Play.
These are:-
Sub-Area Level
• In terms of Outdoor Sport, there are deficits of provision in every Sub-Area across the County Borough.
• There is a much better picture with respect to overall Children’s Playing Space, with the Garw Valley being the only Sub-Area with an “overall” deficit.
• However, these findings in terms of overall Children’s Playing Space mask deficits in Equipped Children’s Playing Space in every Sub-Area across the County Borough.
Ward Level
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Bridgend Local Development Plan Evidence Base Outdoor Sport and Children's Playing Space Audits 2017Report | 39 MB | DownloadRead as text |
Follow Development Control Committee at Bridgend and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 19 Oct 2023 | Site VisitsThat a date for any site visits agreed by the Committee or identified in advance of the next meeting by the Chairpers... | Agreed | Open |
| 19 Oct 2023 | Approval of MinutesThat the Minutes of a meeting of the Development Control Committee dated 7 September 2023, be approved as a true and ... | Approved | Open |
| 19 Oct 2023 | Amendment SheetThe was accepted by the Chairperson as an urgent item under Part 4, paragraph 4 of the Council Procedure Rules. | Decided | Open |
| 19 Oct 2023 | Development Control Committee GuidanceThat the report of the Corporate Director – Communities, outlining the be noted. | Noted | Open |
| 19 Oct 2023 | P/23/147/FUL - Rear of 82 Merthyr Mawr Road, Bridgend, CF31 3NSThat the above application be granted, subject to the Conditions contained in the report of the Corporate Director – ... | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.