CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Bridgend County Borough Council
Development Control Committee, Thursday 28 September 2017

Bridgend County Borough Council - Joint Housing Land Availability Study 2017

Noted Planning 1 paper

Development Control Committee noted this item on Thursday 28 September 2017. Below is the council's own wording, with the papers it was decided on.

Item43

Resolved

That the 2017 Joint Housing Land Availability Study be noted.
Word for word from the decision Bridgend published for this meeting. Source: democratic.bridgend.gov.uk

Follow this further

Built from Bridgend's papers

What the report saysPro

Report to Development Control Committee

Background

1.1The requirement to maintain a 5-year supply of readily developable housing land in each local planning authority across Wales is a key planning policy requirement of the Welsh Government. The planning system, through the LDP process, must provide the land that is needed to allow for new home building and local planning authorities are required to ensure that sufficient land is genuinely available to provide a 5-year supply of land for housing.

1.2The Joint Housing Land Availability Study (JHLAS) is the mechanism for local planning authorities to demonstrate that they have a five year housing land supply by providing an ‘agreed’ statement of housing land availability set against the housing requirements of an adopted local development plan.

1.3Technical Advice Note 1 (TAN 1) provides the guidance on how to prepare a JHLAS. The guidance reinforces the Welsh Government’s ‘plan-led’ system and advises that the JHLAS is a key mechanism for monitoring the effectiveness of the LDP. The housing supply figure from the JHLAS must be included in the LDP’s Annual Monitoring Report (AMR).

1.4As part of the AMR process, where there is a shortfall, i.e. less than a 5 year housing land supply, the Local Planning Authority should consider the reasons for the shortfall and whether the LDP should be reviewed in whole or in part.

1.5In terms of the development control process TAN 1 guidance also advises that the housing land supply figure will be treated as a material consideration in determining planning applications. When a study shows supply being less than 5 years the need to increase supply will be given considerable weight when dealing with planning applications.

1.6For those Local Planning Authorities who do not have an adopted LDP in place the ability to undertake a JHLAS and therefore demonstrate whether they have a 5 year supply of housing is removed.

2. Current situation

2.1Bridgend’s latest 2017 JHLAS is attached at Appendix 1. Set against the housing requirement of the adopted LDP the Study demonstrates that Bridgend County Borough has a 4.0 year housing land supply (representing a shortfall in the TAN 1, 5 year requirement) with a total land supply within the 5 year study period of 4237 units (for information purposes Past Completions Data and Previous Land Supply Data are attached as Appendices 2 and 3 respectively).

2.2As there are only 4 years remaining (up to 2021) of the LDP period, which is less than the 5 year JHLAS period up to 2022, a mathematical method prescribed by TAN 1 guidance has been used to calculate the annual average requirement as part of the 5 year land supply calculation.

2.3The Council is the responsible body for preparing the JHLAS which is subject to an agreed timetable. In preparing the document the Council consulted with the ‘Study Group’ which consisted of house builders’ representatives, including the Home Builders Federation (HBF), landowners, Registered Social Landlords, statutory undertakers and infrastructure providers.

2.4A Study Group meeting took place on 10th May 2017. In consultation with the ‘Study Group’ the Council subsequently prepared a Statement of Common Ground, setting out the extent of agreement on site delivery.

2.5Two sites remained in dispute at the end of the consultation process and it was therefore necessary for an appointed Planning Inspector to look at the evidence submitted as part of a Statement of Common Ground and resolve matters in connection with the disputed sites.

2.6The Inspector determined that the land supply figure for Bridgend County Borough Council is 4.0 years. The Inspector’s report and recommendations in response to the evidence submitted is included as Appendix 4 of the 2017 JHLAS.

3. Next Steps

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Bridgend County Borough Council: Joint Housing Land Availability Study 2017Report 1.1 MB DownloadRead as text

At this meeting

Whole meeting

Who was there

17 of 28 attended
TB
Councillor Tom BeedleCommittee Member, present
JB
Councillor Jon-Paul BlundellCommittee Member, present
NB
Councillor Nicole BurnettCommittee Member, present
RC
Councillor Richard CollinsCommittee Member, present
RD
Rhodri DaviesOfficer, in attendance
SD
Councillor Sorrel DendyCommittee Member, present
CF
Craig FlowerOfficer, in attendance
MG
Mark GalvinOfficer, in attendance
JG
Councillor Jane GebbieCommittee Member, present
TG
Tony GodsallOfficer, in attendance
RJ
Rod JonesOfficer, in attendance
SJ
Susan JonesOfficer, in attendance

All 28 on the meeting page

On this subject at Bridgend

Search all
  1. Bridgend County Borough Council - Joint Housing Land Availability Study 2017This decision
  2. Election of Vice Chairperson (from Bridgend County Borough Council members)Decided
  3. To elect the Leader of Bridgend County Borough CouncilDecided
  4. Service Level Agreement between HM Prison and Probation Service (HMPPS) and Bridgend County Borough Council for Children and Young People held at HM Prison Parc Young Offenders Institution (YOI)Agreed
  5. Play Sufficiency Duty, Assessment and Action Plan to Secure Sufficient Opportunities in Bridgend County BoroughDecided
  6. Update on the Care Inspectorate Wales Inspection of Bridgend County Borough Council's Children's Residential Homes in 2022Noted

More from Bridgend Development Control Committee

All decisions
MeetingDecisionOutcome
19 Oct 2023 Site VisitsThat a date for any site visits agreed by the Committee or identified in advance of the next meeting by the Chairpers... Agreed Open
19 Oct 2023 Approval of MinutesThat the Minutes of a meeting of the Development Control Committee dated 7 September 2023, be approved as a true and ... Approved Open
19 Oct 2023 Amendment SheetThe was accepted by the Chairperson as an urgent item under Part 4, paragraph 4 of the Council Procedure Rules. Decided Open
19 Oct 2023 Development Control Committee GuidanceThat the report of the Corporate Director – Communities, outlining the be noted. Noted Open
19 Oct 2023 P/23/147/FUL - Rear of 82 Merthyr Mawr Road, Bridgend, CF31 3NSThat the above application be granted, subject to the Conditions contained in the report of the Corporate Director – ... Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies