CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Bridgend County Borough Council
Development Control Committee, Thursday 26 April 2018

P/17/816/FUL - Pyle Garden Centre 2 Heol Mostyn Pyle CF33 6BJ

Decided Planning 1 paper

Development Control Committee decided this item on Thursday 26 April 2018. Below is the council's own wording, with the papers it was decided on.

Item114

Resolved

That the following application be granted subject to the conditions contained in the report of the Corporate Director Communities:- Proposal Redevelopment and extension for extended coffee shop / restaurant area, farm shop, kitchen area, toilets and 2 new concession retail units.
Word for word from the decision Bridgend published for this meeting. Source: democratic.bridgend.gov.uk

Follow this further

Built from Bridgend's papers

What the report saysPro

Report to Development Control Committee

REFERENCE: P/17/816/FUL APPLICANT: Pyle Garden Centre 2 Heol Mostyn, Pyle, CF33 6BJ LOCATION: Pyle Garden Centre 2 Heol Mostyn Pyle CF33 6BJ PROPOSAL: Redevelopment and extension for extended coffee shop/restaurant area, farm shop, kitchen area, toilets and 2 new concession retail units RECEIVED: 26th September 2017 SITE INSPECTED: 16th October 2017

DESCRIPTION OF PROPOSED DEVELOPMENT This application seeks full planning permission for the redevelopment of the eastern edge of the application site to include an extension to the building, at Pyle Garden Centre, Pyle.

Figure 1

The redevelopment comprises an extension to the eastern section of the building to extend the existing ‘Olive Tree Restaurant’ area and provide toilet facilities. A coffee shop with delicatessen will replace the existing ‘Animal Emporium’ and ‘Aqualogic’.

In addition, two concession retail units are proposed to be erected which will operate within an A1 use class. The units are positioned on the eastern section of the existing building, and are proposed to measure 20 metres in width, 10 metres in depth and 5.6 metres in maximum height.

The east-facing elevation of the building will be finished in vertical treated timber stained in a grey colour, and will have a light grey polycarbonate cladded roof, as shown below: Tower Application Number Cott

P/17/816/FUL

YN ST O M L O HE El Sub Sta 21

Vict o 20

ria T erra 18

ce

36.0m Drain 16 17

Tanks 14 15

18 13 11 A 48

Garden Centre

5 1

rd Orcha ge a Cott

Pond

41.7m Afon Fach Sign al Lig ht )

El Su b Sta

TCB ) ) LB 43.4m 1

43.0m 42.8m Mile Post 196 ) A 48

) Posts ) Track 48.1m

Mark Shephard Scale 1:1,750 Corporate Director-Communities (c) Crown Copyright and database rights

 (2018) Ordnance Survey (100023405) Communities Directorate, Bridgend County Borough Date Issued: Council, Civic Offices, (c) Hawlfraint a hawliau cronfa ddata'r Goron (2018) Rhif Trwydded yr Arolwg Ordnans 20/04/2018 Angel Street, (100023405) Bridgend CF31 4WB.

(c) Cities Revealed Aerial Photography Development-Mapping O/Drive/Plandraw/new MI layouts/ copyright, The Geoinformation Group (2009) Tel: 01656 643176 Committee DC Plan Figure 2

In addition to the above, the application proposes to erect a storage building in the south western corner of the application site. The building will serve as a ‘goods in’ storage facility, and will measure 10.5 metres in width, 12.5 metres in depth and 5.2 metres in maximum height. It will be finished with powder coated box-profile steel sheeted elevations and a cladded polycarbonate steel roof.

The application also proposes an alteration to the internal vehicular and pedestrian circulation of the application site by introducing a one-way system. The existing car park located to the east of the garden centre, as shown by ‘Zona A’ in Figure 1 above, will be extended, and an exit for vehicles will be created onto Village Farm Road.

SITE DESCRIPTION The application site lies within the Main Settlement of Pyle, as defined by Policy PLA1 of Bridgend County Borough Council’s adopted Local Development Plan (2013). It is situated at the western-most point of Employment Site REG1 (36) Village Farm Industrial Estate which is allocated and protected for employment development falling within B1, B2 and B8 uses, and lies approximately 20 metres to the south of the Retail and Commercial Centre of Pyle.

The site’s western boundary lies adjacent to the A48 bypass road, whilst being positioned approximately 965 metres to the north of the M4 motorway. It is currently accessed via Heol Mostyn, which runs adjacent to the northern boundary of the application site.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
P/17/816/FUL: Pyle Garden Centre 2 Heol Mostyn Pyle CF33 6BJReport 3.2 MB DownloadRead as text

At this meeting

Whole meeting

Who was there

13 of 29 attended
CT
Cynghorydd Tom BeedleCommittee Member, present
CJ
Cynghorydd Jon-Paul BlundellCommittee Member, present
CN
Cynghorydd Nicole BurnettCommittee Member, present
CR
Cynghorydd Richard CollinsCommittee Member, absent
RD
Rhodri DaviesOfficer, in attendance
CS
Cynghorydd Sorrel DendyCommittee Member, present
CF
Craig FlowerOfficer, in attendance
RJ
Rod JonesOfficer, in attendance
CM
Cynghorydd Mike KearnCommittee Member, present
HK
Hayley KempOfficer, in attendance
IL
Ingrid LekajOfficer, in attendance
CD
Cynghorydd David LewisCommittee Member, apologies

All 29 on the meeting page

On this subject at Bridgend

Search all
  1. P/17/816/FUL - Pyle Garden Centre 2 Heol Mostyn Pyle CF33 6BJThis decision
  2. P/16/137/FUL - Plot 116 Village Farm Road, Village Farm Industrial Estate, PyleDecided
  3. P/12/796/FUL – Residential development of 94 dwellings and Outline application for Industrial/Commercial use on 2.23 HA - Land at Ty Draw Farm, Pyle, BridgendAgreed

More from Bridgend Development Control Committee

All decisions
MeetingDecisionOutcome
19 Oct 2023 Site VisitsThat a date for any site visits agreed by the Committee or identified in advance of the next meeting by the Chairpers... Agreed Open
19 Oct 2023 Approval of MinutesThat the Minutes of a meeting of the Development Control Committee dated 7 September 2023, be approved as a true and ... Approved Open
19 Oct 2023 Amendment SheetThe was accepted by the Chairperson as an urgent item under Part 4, paragraph 4 of the Council Procedure Rules. Decided Open
19 Oct 2023 Development Control Committee GuidanceThat the report of the Corporate Director – Communities, outlining the be noted. Noted Open
19 Oct 2023 P/23/147/FUL - Rear of 82 Merthyr Mawr Road, Bridgend, CF31 3NSThat the above application be granted, subject to the Conditions contained in the report of the Corporate Director – ... Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies