That the above application be granted, subject to the Conditions contained in the report of the Corporate Director Communities. Proposal Re-profiling and landscaping of earth bank on southern side of playing fields. Subject to Condition 4 of the report being amended as follows:- 4. Notwithstanding the approved plans, within three months of the date of this consent, a full landscaping scheme for the earth bank to the southern side of the sports pitches and MUGA, including a scheme of drainage, shall be submitted to and agreed in writing with the Local Planning Authority. Development shall be carried out in accordance with the agreed details.
Word for word from the decision Bridgend published for this meeting.Source: democratic.bridgend.gov.uk
REFERENCE: P/18/929/RES APPLICANT: Persimmon Homes West Wales Dragon House, Parc Y Ddraig, Penllergaer Business Park, Swansea, SA4 9HJ LOCATION: Playing fields at Parc Derwen Bridgend PROPOSAL: Reprofiling and landscaping of earth bank on southern side of playing fields RECEIVED: 23 November 2018 SITE INSPECTED: 14 January 2019
APPLICATION/SITE DESCRIPTION
This application was deferred from the Development Control Committee on 14 February 2019 to allow for a site visit to be undertaken. Reproduced below is a copy of the report:-
‘The application seeks approval of Reserved Matters in respect of the provision of a MUGA and sports playing fields including the retention of the reprofiling and landscaping of the earth bank on the southern side of the playing fields at the Parc Derwen Development Site, Coity.
The original approval for the playing fields (P/16/501/RES) required the development to be undertaken in accordance with approved plans, one of which related to the finished levels for the site. This plan indicated that there would be a gradual slope of the land to the south of the MUGA and playing fields down to the mature hedgerow running along the southern site boundary.
The variation of condition application included a plan showing spot heights across the area of land to the south of the MUGA and included the finished floor levels of the properties in Trem Y Llwyfen facing onto this site. From a review of that plan it was evident that land levels adjacent to the southern boundary of the MUGA increased between approximately 1m-1.8m over a distance of 16m.
Photograph showing land levels in relation to the MUGA. (April 2018)
Further to the south, the land levels fall more steeply by 6.8m over a distance of approximately 31m down to the hedgerow, which marks the northern boundary of the footpath.
Photograph show slope from top of mound to hedgerow (April 2018)
The application was refused in June 2018 for the following reasons:- 1. The development is detrimental to local visual amenities by reason of its scale, siting and external appearance in a prominent location forming part of, and lying adjacent to, public playing fields and a recreation area, a multi-use games area, public footway and a cycle path and in full view of the occupiers of adjoining residential properties in Trem Y Llwyfen contrary to Policy SP2 of the Bridgend Local Development Plan (2013).
2. The development by reasons of its land profile and appearance would be generally out of character with the surrounding landscape to the detriment of the visual amenities of the area contrary to Policy SP2 of the Bridgend Local Development Plan (2013).
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.