The Chairperson accepted the Development Control Committee as an urgent item in accordance with Part 4 (paragraph 4) of the Council Procedure Rules, in order to allow for the Committee to consider necessary modifications to the Committee report, so as to take account of late representations and revisions that are required to be accommodated.
Word for word from the decision Bridgend published for this meeting.Source: democratic.bridgend.gov.uk
AMENDMENT SHEET The Chairperson accepts the amendment sheet in order to allow for Committee to consider necessary modifications to the Committee report to be made so as to take account of late representations and corrections and for any necessary revisions to be accommodated.
ITEM NO. PAGE NO. APPLICATION NO.
8 13 P/19/531/FUL
A Full Committee Site Visit was undertaken on Wednesday 15 January, 2020.
The Local Ward Member and representatives of the applicant (Homestyle Care Ltd.) attended the site visit.
In addition, DC Committee Members received a late representation from an objector at 7.56pm on Monday 13th January, 2020.
The email is as follows:
I would be grateful if you could spare me some of your valuable time to read this email as I will be unable to fulfil my intention to speak against this proposal as I am currently abroad.
In my opinion much of the contents of the Report for this application is misleading and does not accurately reflect many of the written and spoken points that I have made,mainly with Alexandra Richards ,during the course of this lengthy application(which actually expired on 13 January 2020).
A request to [name removed] to appoint a Case Officer other than [name removed] was deemed unnecessary. A limited context for this request is outlined below:-
• P/07/89/FUL Approval to build two properties at Briary Wood- Conservation Design justified objection to this application was not considered or posted on the BCBC portal:
• P/07/1145/FUL Conservation & Design letter included but ignored;
• P/15/183/FUL - Land drainage condition as outlined in P/09/645/FUL (never met) not included by the case officer;
• P/19/531/FUL - Land drainage condition excluded again - Justified apparently by Building Inspectorate who are happy with the 'existing system' albeit this has never been shown on any plans associated with this development.
• Is it worth the professional officers at Land Drainage actually contributing to this process?
More specifically I would like you to consider the following points:
1. I made several references to various contents of the Welsh Audit Office official report covered at the 24 October 2019 DCC Meeting including the point made in section 4 regarding 'Developers' upper hand. The Agent for this application is a Senior Planning Officer at Swansea City Council and is obviously fully familiar with the need to make Planning Applications as accurate as possible from the outset. I am uncomfortable that this person is known to several of the staff at BCBC planning but no doubt this should not have any benefit in this process.
2. The plans for this application together with a copy of the Planning Inspectors appeal were submitted by the Agent. I have presumed that the Agent was familiar with the breach of Conditions 2& 4 of this Appeal (breach acknowledged by [name removed]) which I had raised with both the Case Officer and Enforcement Officer. This resulted in a request for the Agent to supply new accurate plans of the development. These revised plans were simply copies of those submitted in 2016 and were rejected immediately by [name removed] with a subsequent request which resulted in the amended 'plans' received on 18 November 2019.
3. On 20 November 2019 a revised proposal was posted on the BCBC planning portal to include the 'retention of a two-storey extension with dormer addition'.
4. I wrote to [name removed] expressing my concern that this change (retrospective application) should be considered separately to the original proposal based upon:-
5. Paragraph m of the DCC Guidance Standard Notes issued at every meeting and which clearly state 'changes which conflict with a condition' require a fresh application. Whether the dormer window is within 21m of an existing building is also a consideration.
6. The Applicant has significantly changed the recreational facilities for residents by changing the 'rebound room' into 'bedroom 7' and halving the size of the sensory room;
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.