That for the purposes of Regulation 4 of the Town and Country Planning Regulations 1992, permission be deemed to be granted for the above application, subject to the Conditions contained in the report of the Corporate Director – Communities:- Proposal Erection of 8 new build industrial units in a single block consisting of 3 large units and 5 small units with associated vehicular and cycle parking.
Word for word from the decision Bridgend published for this meeting.Source: democratic.bridgend.gov.uk
REFERENCE: P/20/159/BCB APPLICANT: Bridgend County Borough Council c/o KEW Planning, PO Box 5245, Cardiff CF5 9GQ LOCATION: Plot 50a Village Farm Road Village Farm Industrial Estate Pyle CF33 6BN PROPOSAL: Erection of 8 new build industrial units in a single block consisting of 3 large units and 5 small units with associated vehicular and cycle parking. RECEIVED: 19 February 2020
APPLICATION/SITE DESCRIPTION The application seeks full planning permission for the erection of 8 new build industrial units in a single block consisting of 3 large units and 5 small units with associated vehicular and cycle parking at Plot 50a Village Farm Road, Village Farm Industrial Estate, Pyle, Bridgend.
The application site is located within the existing Village Farm Industrial Estate and is surrounded by similarly designed buildings and industrial uses as to that subject of this application. The site is currently an open, grassed, vacant area and is used for informal parking by the surrounding industrial units with vehicular access to the site gained via Village Farm Road.
Figure 1 – Site Location Plan:
The proposed scheme comprises 8 new build industrial units with a combined gross internal floor area of 634 sq m. The scheme proposes a single block building consisting of three larger units (111 sq m) and five smaller units (56 sq m) with associated vehicular and cycle parking. The proposed building is to be single storey measuring approximately 63.5m x 10.5m and to a height of 7.8m with a pitched roof to the front and a cat slide roof to the rear. The building will be finished with standing seam metal roofing, profile metal cladding, polycarbonate glazed windows and metal door sets with accent coloured roller shutters for each individual unit. The majority of the windows will be located in the rear elevation of the building with a number of velux roof lights located within the roof slope.
Figure 2 - Proposed Elevations and Floor Plan:
The application proposes the use of the starter units to fall within B1, B2 and B8 uses of the Town and Country Planning Act (Use Classes Order) 1987.
The site will be accessed off an existing access known as Village Farm Road with 18 off- street parking spaces located to the front of the units, one disabled parking space and 2 cycle stands which will be located to the side of the proposed building. There will be an attenuation pond located at the entrance to the site with small scale landscaping also proposed within the site. The application site is also located within a Flood C2 Zone.
Figure 3 - Proposed Site Layout:
The following documents has been submitted in support of the application: Transport Assessment prepared by Curtins; Interim Travel Plan; Flood Consequence Assessment and Drainage Strategy prepared by Curtins; Landscaping Details; Detailed Elevations and Floor Plans; Design and Access Statement
RELEVANT HISTORY None
PUBLICITY The application was advertised on site. Neighbours have been notified of the receipt of the application. The period allowed for response to consultations/publicity expired on 24 April 2020.
CONSULTATION RESPONSES Transportation Officer (Highways) – No objection subject to a number of conditions and a Traffic Order for a scheme for road markings (double yellow lines and double kerb lines) and signage at the site.
Land Drainage Officer – No objection subject to a condition for the submission of a comprehensive drainage scheme prior to development commencing on site.
Natural Resource Wales (NRW) –objection to the proposed development as the Flood Consequence Assessment (FCA) fails to demonstrate the risks and consequences of flooding and how they can be managed to an acceptable level in line with TAN15 and there has been no assessment of third party impacts.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.