Development Control Committee, Thursday 30 September 2021

P/21/237/RLX - Stormy Down Anaerobic Digestion Facility, Stormy Down

Agreed Planning 1 paper

Development Control Committee agreed this item on Thursday 30 September 2021. Below is the council's own wording, with the papers it was decided on.

Item524

Resolved

(1) That having regard to the above application, the applicant enters into a Deed of Variation/Section 106 Agreement to:- (i) include a routeing agreement for heavy goods vehicles operating to and from the AD plant and digestate lagoon; (ii) require the operator of the AD plant to keep a record of complaints and publish a report of any breaches to the routeing agreement. (2) The Corporate Director Communities be given delegated powers to issue a decision notice granting consent in respect of this proposal once the applicant has entered into the aforementioned Section 106 Agreement, subject to the Conditions contained in the report of the Corporate Director - Communities:- Proposal Variation of conditions 1 and 7 of P/17/1047/RLX to permit an increase in food waste tonnage and associated layout amendments.
Word for word from the decision Bridgend published for this meeting. Source: democratic.bridgend.gov.uk

Follow this further

Built from Bridgend's papers

What the report saysPro

Report to Development Control Committee

REFERENCE: P/21/237/RLX

APPLICANT: Severn Trent Green Power (Bridgend) Ltd The Stables, Radford, Chipping Norton, OX7 4EB

LOCATION: Stormy Down Anaerobic Digestion Facility Stormy Down CF33 4RS

PROPOSAL: Variation of conditions 1 and 7 of P/17/1047/RLX to permit an increase in food waste tonnage and associated layout amendments

RECEIVED: 17 March 2021

APPLICATION/SITE DESCRIPTION Severn Trent Green Power (Bridgend) Ltd currently operate an Anaerobic Digestion Facility (AD) on land at Stormy Down under a consent originally granted in May 2015 (P/14/700/FUL refers) and subsequently amended in 2018 (P/17/1047/RLX refers). This application seeks to vary condition 1 which listed the plans for the development and 7 which controlled the tonnage of waste that could be processed on site. The conditions are reproduced in full below:

1. The development shall be carried out in accordance with the following approved plans and documents: plan numbers A312.1000 P001C, A312.1000 P003B, A312.1000 P004B and A312.1000 P005A received on 21 October 2014 and the Screen Planting Plan - DWG SD/02 (Revision A) received on 14 May 2018.

Reason: To avoid doubt and confusion as to the nature and extent of the approved development.

7. No more than 48,500 tonnes of waste annually shall be imported into the site for processing in the Anaerobic Digester operation hereby approved. Written records of tonnages imported into the site shall be available for inspection by Planning and Public Protection Officers on request at all reasonable times.

Reason: In the interests of highway safety.

The revisions to condition 1 relate to the approved site plan and includes an extension on the southern side of the main reception building, measuring 10m x 8m. It will accommodate two pasteurisation tanks. The extension is identical in height and finishes to the main building. The other site amendment, as detailed on the Flare General Amendment drawing, is a minor increase in the height of the Gas Flare installed on site to a total height of 10m. The increase is approximately 100mm and is to enable the safe management of the additional biogas produced by the proposed increase in processing tonnage. The gas flare is only utilised in exceptional circumstance when the biogas cannot be processed through the Combined Heat and Power Engines.

The revision to condition 7 seeks to increase the waste tonnage processed in the facility from 48,500 to 95,000 tonnes of food waste per annum. A companion application has been submitted to Natural Resources Wales to vary the terms of the Environmental Permit for the facility.

The Planning statement submitted in support of this application confirms that the AD facility has been operational since December 2016, originally under the management of Agrivert Limited and since December 2018 under the ownership and management of Severn Trent Green Power (Bridgend) Limited. The table below sets out the annual waste tonnages the site has received since it began operating: Fig. 1: Annual Waste Tonnages received at the site since it began operating

The AD facility processes household waste from Bridgend, Swansea, Ceredigion, Powys, Pembrokeshire, Monmouthshire, Blaenau Gwent and Torfaen Councils. In 2018, waste from long-term Council contracts accounted for approximately 80% of the total waste inputs. In the future, it is expected population recycling rates in these areas will increase and therefore, the increase to 95,000 tonnes per annum is proposed to provide required capacity to continue treating the waste as close as possible to where it was created.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
P/21/237/RLX: Stormy Down Anaerobic Digestion Facility, Stormy DownReport 257 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

12 of 31 attended
CJ
Cynghorydd Jon-Paul BlundellCommittee Member, present
C
Cabinet_CommitteeOfficer, expected
R-
Room - Council ChamberOfficer, expected
CN
Cynghorydd Norah ClarkeCommittee Member, present
CR
Cynghorydd Richard CollinsCommittee Member, apologies
RD
Rhodri DaviesOfficer, in attendance
CS
Cynghorydd Sorrel DendyCommittee Member, present
CK
Cynghorydd Keith EdwardsCommittee Member, present
LE
Lee EvansOfficer, expected
CF
Craig FlowerOfficer, in attendance
CR
Cynghorydd Richard GranvilleCommittee Member, present
CA
Cynghorydd Altaf HussainCommittee Member, present

All 31 on the meeting page

On this subject at Bridgend

Search all
  1. P/21/237/RLX - Stormy Down Anaerobic Digestion Facility, Stormy DownThis decision
  2. P/20/423/RLX - Newton Down Windfarm, Stormy Lane, PorthcawlDecided

More from Bridgend Development Control Committee

All decisions
MeetingDecisionOutcome
19 Oct 2023 Site VisitsThat a date for any site visits agreed by the Committee or identified in advance of the next meeting by the Chairpers... Agreed Open
19 Oct 2023 Approval of MinutesThat the Minutes of a meeting of the Development Control Committee dated 7 September 2023, be approved as a true and ... Approved Open
19 Oct 2023 Amendment SheetThe was accepted by the Chairperson as an urgent item under Part 4, paragraph 4 of the Council Procedure Rules. Decided Open
19 Oct 2023 Development Control Committee GuidanceThat the report of the Corporate Director – Communities, outlining the be noted. Noted Open
19 Oct 2023 P/23/147/FUL - Rear of 82 Merthyr Mawr Road, Bridgend, CF31 3NSThat the above application be granted, subject to the Conditions contained in the report of the Corporate Director – ... Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies