Resolved
RESOLVED – That the Housing Management Consultative Sub Committee note the recommendations.
Housing Management Consultative Sub-Committee noted this item on Tuesday 11 February 2014. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED – That the Housing Management Consultative Sub Committee note the recommendations.
Appendix 1
Lettable Standard comparison table compiled from the ‘Empty Homes Technical Lettable Standard’
Number Void Standard September 2001 (Current) Proposed Standard
1 General General
Dwelling to be free from: Dwelling should be free from • infestation • rising or penetrating damp • All types of infestation • failure or damage to the structure • Rising or penetrating damp • Failure or damage All fixtures fittings wall and base units, worktops, floor coverings, etc must be in All fixtures fittings wall and base units, worktops, floor coverings must be in good good working order and fit for purpose. working order and fit for purpose. 2 Electrics Electrics and Energy Performance
Inspection and testing, once completed a An electrical inspection to be carried out and an energy performance certificate certificate should be issued. completed.
3 Gas Gas inspection
A CORGI registered contractor to test and Completed, passed and landlords safety certificate issued. undertake any work needed. On completion a certificate should be issued. 4 Floors Floors
Any unlevel and unsafe floor will be made Any unlevel and unsafe floor will be made good. good. Where new metric boards are used to carry out repairs, then the gap between any Any unsafe areas of floor screed shall be adjacent boards shall be no more than 6mm width. made good using a latex levelling screed. Any unsafe areas of floor screed shall be made good using a latex levelling screed. All loose/lifting floor tiles shall be securely re-fixed using appropriate adhesive. Where solid floors exist, they will be repaired with matching material, this applies to finished surfaces and unfinished surfaces in the dwelling. There should be impervious flooring in the bathroom, kitchen and WC. All loose/lifting floor tiles shall be securely re-fixed using an approved adhesive where they are a suitable and safe material, the tile/s remain in tact (complete) and the flooring surface can be made safe. Where appropriate defective tile locations can be in filled with latex. This does not apply to the Kitchen, bathroom or WC.
In exceptional circumstances where a vinyl sheet cannot be fitted a vinyl tile will be considered with the council’s approval.
All laminate or engineering flooring should be assessed for suitability, to reduce nuisance noise to neighbours; if this type of flooring is in multiple occupancy buildings then it should be removed. 5 Walls and Ceilings Walls and Ceilings
All to be left fit to receive decorating. All wall and ceiling finishes are to be left in-situ to receive a decorative finish by the incoming tenant. Where there is wall or ceiling paper of a suitable quality to Damaged areas are to be hacked off and re- be painted, will remain in-situ. plastered. The Empty homes surveyor will assess the surfaces, identifying areas of blown or Should the previous tenant have artexed the spalling plaster. 200mm² or greater then the area will be repaired. walls, it should be hacked off and recharged to the previous tenant. Damaged areas are to be hacked off and re-plastered.
Should the ceiling be in a poor condition, The painting or decoration is the responsibility of the incoming tenant. consideration should be given to applying an Other wall or ceiling coverings will remain in-situ where it is found. artex finish. Polystyrene coving or tiles will be removed and the surfaces made good. Damaged or missing skirting boards to be replaced. If there is an artexed ceiling or wall which is in need of repair and this repair cannot be done without disturbing the existing artex, then the supplier by default will follow their safety processes. If the report comes back positive for asbestos then the repair should be carried out in the most cost effective way.
All missing/defective sections of skirting board and door architrave to be replaced.
6 Kitchens Kitchens
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Item 43 Appx 1Report | 109 KB | DownloadRead as text |
PDF |
Item 43 Appx 2Report | 49 KB | Download |
PDF |
Lettable StandardReport | 73 KB | Download |
PDF |
View as HTML (43./2) 122 KBReport | 122 KB | Download |
PDF |
View as HTML (43./3) 63 KBReport | 63 KB | Download |
PDF |
View item 43. as HTML 84 KBReport | 84 KB | Download |
Follow Housing Management Consultative Sub-Committee at Brighton and Hove and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 1 Apr 2014 | Procedural BusinessRESOLVED - That the press and public be not excluded from the meeting. | Decided | Open |
| 1 Apr 2014 | Call-overRESOLVED – That all items be reserved for discussion | Decided | Open |
| 1 Apr 2014 | Response to Tenant Scrutiny Panel report on Standard LettersRESOLVED – ( 1) That the evidence, findings and recommendations of the Tenant Scrutiny Panel relating to standard let... | Noted | Open |
| 1 Apr 2014 | Housing Management Performance Report Quarter 3 2013/14RESOLVED – That the report be noted. | Noted | Open |
| 1 Apr 2014 | Lessons taken from the experience of relocating Manor Place Housing OfficeRESOLVED - T hat the learning taken from Manor Place and applied to the planning of the Selsfield Drive Housing Offic... | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.