CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Brighton and Hove City Council
Housing Management Consultative Sub-Committee, Tuesday 11 February 2014 at 3.00pm

Lettable Standard

Noted Committee 6 papers

Housing Management Consultative Sub-Committee noted this item on Tuesday 11 February 2014. Below is the council's own wording, with the papers it was decided on.

Item43

Resolved

RESOLVED – That the Housing Management Consultative Sub Committee note the recommendations.
Word for word from the decision Brighton and Hove published for this meeting. Source: democracy.brighton-hove.gov.uk

Follow this further

Built from Brighton and Hove's papers

What the report saysPro

Report to Housing Management Consultative Sub-Committee

Appendix 1

Lettable Standard comparison table compiled from the ‘Empty Homes Technical Lettable Standard’

Number Void Standard September 2001 (Current) Proposed Standard

1 General General

Dwelling to be free from: Dwelling should be free from • infestation • rising or penetrating damp • All types of infestation • failure or damage to the structure • Rising or penetrating damp • Failure or damage All fixtures fittings wall and base units, worktops, floor coverings, etc must be in All fixtures fittings wall and base units, worktops, floor coverings must be in good good working order and fit for purpose. working order and fit for purpose. 2 Electrics Electrics and Energy Performance

Inspection and testing, once completed a An electrical inspection to be carried out and an energy performance certificate certificate should be issued. completed.

3 Gas Gas inspection

A CORGI registered contractor to test and Completed, passed and landlords safety certificate issued. undertake any work needed. On completion a certificate should be issued. 4 Floors Floors

Any unlevel and unsafe floor will be made Any unlevel and unsafe floor will be made good. good. Where new metric boards are used to carry out repairs, then the gap between any Any unsafe areas of floor screed shall be adjacent boards shall be no more than 6mm width. made good using a latex levelling screed. Any unsafe areas of floor screed shall be made good using a latex levelling screed. All loose/lifting floor tiles shall be securely re-fixed using appropriate adhesive. Where solid floors exist, they will be repaired with matching material, this applies to finished surfaces and unfinished surfaces in the dwelling. There should be impervious flooring in the bathroom, kitchen and WC. All loose/lifting floor tiles shall be securely re-fixed using an approved adhesive where they are a suitable and safe material, the tile/s remain in tact (complete) and the flooring surface can be made safe. Where appropriate defective tile locations can be in filled with latex. This does not apply to the Kitchen, bathroom or WC.

In exceptional circumstances where a vinyl sheet cannot be fitted a vinyl tile will be considered with the council’s approval.

All laminate or engineering flooring should be assessed for suitability, to reduce nuisance noise to neighbours; if this type of flooring is in multiple occupancy buildings then it should be removed. 5 Walls and Ceilings Walls and Ceilings

All to be left fit to receive decorating. All wall and ceiling finishes are to be left in-situ to receive a decorative finish by the incoming tenant. Where there is wall or ceiling paper of a suitable quality to Damaged areas are to be hacked off and re- be painted, will remain in-situ. plastered. The Empty homes surveyor will assess the surfaces, identifying areas of blown or Should the previous tenant have artexed the spalling plaster. 200mm² or greater then the area will be repaired. walls, it should be hacked off and recharged to the previous tenant. Damaged areas are to be hacked off and re-plastered.

Should the ceiling be in a poor condition, The painting or decoration is the responsibility of the incoming tenant. consideration should be given to applying an Other wall or ceiling coverings will remain in-situ where it is found. artex finish. Polystyrene coving or tiles will be removed and the surfaces made good. Damaged or missing skirting boards to be replaced. If there is an artexed ceiling or wall which is in need of repair and this repair cannot be done without disturbing the existing artex, then the supplier by default will follow their safety processes. If the report comes back positive for asbestos then the repair should be carried out in the most cost effective way.

All missing/defective sections of skirting board and door architrave to be replaced.

6 Kitchens Kitchens

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Item 43 Appx 1Report 109 KB DownloadRead as text
PDF
Item 43 Appx 2Report 49 KB Download
PDF
Lettable StandardReport 73 KB Download
PDF
View as HTML (43./2) 122 KBReport 122 KB Download
PDF
View as HTML (43./3) 63 KBReport 63 KB Download
PDF
View item 43. as HTML 84 KBReport 84 KB Download

At this meeting

Whole meeting

More from Brighton and Hove Housing Management Consultative Sub-Committee

All decisions
MeetingDecisionOutcome
1 Apr 2014 Procedural BusinessRESOLVED - That the press and public be not excluded from the meeting. Decided Open
1 Apr 2014 Call-overRESOLVED – That all items be reserved for discussion Decided Open
1 Apr 2014 Response to Tenant Scrutiny Panel report on Standard LettersRESOLVED – ( 1) That the evidence, findings and recommendations of the Tenant Scrutiny Panel relating to standard let... Noted Open
1 Apr 2014 Housing Management Performance Report Quarter 3 2013/14RESOLVED – That the report be noted. Noted Open
1 Apr 2014 Lessons taken from the experience of relocating Manor Place Housing OfficeRESOLVED - T hat the learning taken from Manor Place and applied to the planning of the Selsfield Drive Housing Offic... Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies