(1) That the following recommendations be incorporated into the Brighton & Hove Property Standard, from April 2014: a) External security lights be fitted to all properties with a street entrance receiving an electrical rewire or upgrade as part of the planned programme and empty property works. b) A programme of hearing loop installations, where required, to communal lounges in sheltered housing schemes and community meeting rooms within HRA properties.
Word for word from the decision Brighton and Hove published for this meeting.Source: democracy.brighton-hove.gov.uk
That Housing Committee agree to the following recommendations being incorporated into the Brighton & Hove Property Standard, from April 2014:
2.1External security lights be fitted to all properties with a street entrance receiving an electrical rewire or upgrade as part of the planned programme and empty property works.
2.2A programme of hearing loop installations, where required, to communal lounges in sheltered housing schemes and community meeting rooms within HRA properties.
3. CONTEXT/ BACKGROUND INFORMATION
181 3.1 The recommendations in the original report were as follows:
3.1.1 That all individual sheltered homes with a street entrance be offered an external security light, when upgrading the electrics to that property.
3.1.2 That all sheltered housing schemes with communal lounges have a hearing loop installed when upgrading electrics to communal areas.
3.2This was based on the following information:
3.2.1 Sheltered lighting and hearing loops: External lighting to sheltered properties with a street entrance will incur an additional cost of around £115 per install. Hearing loops cost approx £500 to £600 to install. There are 23 lounges in sheltered schemes, ten of which already have hearing loops. A programme of 13 installs would cost £7,800 plus an annual service of around £55 per system.
4. ADDITIONAL INFORMATION & OPTIONS
4.1Security Lighting: The existing specification for external lighting to a dwelling when having a full rewire is as follows:
4.1.1 Vandal resistant low energy bulk head lights will be supplied and fitted to the principal entrance door position switched from inside the property.
4.1.2 All properties that have their own street entrance have an external, switched light fitted as standard as part of a full rewire.
4.2Homes that are having an electrical upgrade (consumer unit/ fuse board) do not currently have an external light fitted.
4.3During April 2013 to February 2014 there were 410 full rewires plus an additional 261 upgrades.
4.4A similar level of empty properties are expected during 2014-15, and this would have a potential increase in costs of £30,015 (261 upgrades x £115).
4.5Hearing Loops: Loops are not currently installed as part of the decent homes programme of work.
4.6The Repairs & Improvement Partnership with Mears does allow for installation of products for the disabled. The Sensory & Electrical contract with Housing Adaptations & Occupational Therapy Team does not include fitting hearing loops.
4.7The Equality Act 2010 requires local authorities to ensure their public meeting and community rooms are accessible. This provides an opportunity to include in the programme the installation and maintenance of hearing loops in up to 27 non-sheltered meeting rooms within HRA owned properties.
182 4.8 This would bring the total number of installations to a maximum of 50, with install costs of £30,000 plus annual servicing of £2,750.
5. FINANCIAL & OTHER IMPLICATIONS:
Financial implications
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.