CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Brighton and Hove City Council
Housing Committee (pre 2015), Wednesday 30 April 2014 at 4.00pm

Brighton & Hove Property Standard: Additional Information

Decided Committee 2 papers

Housing Committee (pre 2015) decided this item on Wednesday 30 April 2014. Below is the council's own wording, with the papers it was decided on.

Item15

Resolved

(1) That the following recommendations be incorporated into the Brighton & Hove Property Standard, from April 2014: a) External security lights be fitted to all properties with a street entrance receiving an electrical rewire or upgrade as part of the planned programme and empty property works. b) A programme of hearing loop installations, where required, to communal lounges in sheltered housing schemes and community meeting rooms within HRA properties.
Word for word from the decision Brighton and Hove published for this meeting. Source: democracy.brighton-hove.gov.uk

Follow this further

Built from Brighton and Hove's papers

What the report saysPro

Report to Housing Committee (pre 2015)

Recommendation

That Housing Committee agree to the following recommendations being incorporated into the Brighton & Hove Property Standard, from April 2014:

2.1External security lights be fitted to all properties with a street entrance receiving an electrical rewire or upgrade as part of the planned programme and empty property works.

2.2A programme of hearing loop installations, where required, to communal lounges in sheltered housing schemes and community meeting rooms within HRA properties.

3. CONTEXT/ BACKGROUND INFORMATION

181 3.1 The recommendations in the original report were as follows:

3.1.1 That all individual sheltered homes with a street entrance be offered an external security light, when upgrading the electrics to that property.

3.1.2 That all sheltered housing schemes with communal lounges have a hearing loop installed when upgrading electrics to communal areas.

3.2This was based on the following information:

3.2.1 Sheltered lighting and hearing loops: External lighting to sheltered properties with a street entrance will incur an additional cost of around £115 per install. Hearing loops cost approx £500 to £600 to install. There are 23 lounges in sheltered schemes, ten of which already have hearing loops. A programme of 13 installs would cost £7,800 plus an annual service of around £55 per system.

4. ADDITIONAL INFORMATION & OPTIONS

4.1Security Lighting: The existing specification for external lighting to a dwelling when having a full rewire is as follows:

4.1.1 Vandal resistant low energy bulk head lights will be supplied and fitted to the principal entrance door position switched from inside the property.

4.1.2 All properties that have their own street entrance have an external, switched light fitted as standard as part of a full rewire.

4.2Homes that are having an electrical upgrade (consumer unit/ fuse board) do not currently have an external light fitted.

4.3During April 2013 to February 2014 there were 410 full rewires plus an additional 261 upgrades.

4.4A similar level of empty properties are expected during 2014-15, and this would have a potential increase in costs of £30,015 (261 upgrades x £115).

4.5Hearing Loops: Loops are not currently installed as part of the decent homes programme of work.

4.6The Repairs & Improvement Partnership with Mears does allow for installation of products for the disabled. The Sensory & Electrical contract with Housing Adaptations & Occupational Therapy Team does not include fitting hearing loops.

4.7The Equality Act 2010 requires local authorities to ensure their public meeting and community rooms are accessible. This provides an opportunity to include in the programme the installation and maintenance of hearing loops in up to 27 non-sheltered meeting rooms within HRA owned properties.

182 4.8 This would bring the total number of installations to a maximum of 50, with install costs of £30,000 plus annual servicing of £2,750.

5. FINANCIAL & OTHER IMPLICATIONS:

Financial implications

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Brighton & Hove Property Standard: Additional InformationReport 156 KB DownloadRead as text
PDF
View item 15. as HTML 77 KBReport 77 KB Download

At this meeting

Whole meeting

On this subject at Brighton and Hove

Search all
  1. Brighton & Hove Property Standard: Additional InformationThis decision
  2. Housing in Brighton and Hove Annual ReportDecided
  3. Working towards cleaner air for Brighton & Hove through improved smoke control areasDecided
  4. Brighton & Hove Outdoor Events StrategyDecided
  5. Homes for Brighton & Hove - Sackville Road Trading Estate updateDecided
  6. E-scooter Trial proposal for Brighton & HoveDecided

More from Brighton and Hove Housing Committee (pre 2015)

All decisions
MeetingDecisionOutcome
4 Mar 2015 Procedural BusinessRESOLVED - That the press and public not be excluded from the meeting. Decided Open
4 Mar 2015 Call OverIt was agreed that all items be reserved for discussion. Agreed Open
4 Mar 2015 Public InvolvementRESOLVED- That the Public question be noted. 69.7 There were no deputations. Noted Open
4 Mar 2015 Housing Adaptations and Investment update(1) That the capital expenditure to date and commitments going forward, the action taken to mitigate pressures this y... Noted Open
4 Mar 2015 Increasing Security at Council Owned High Rise Blocks of Flats(1) That the following recommendations be approved: (i) To disable the trades button facility at all high rise blocks... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies