City Environment Modernisation Update

Decided Committee 8 papers

Environment, Transport & Sustainability Committee decided this item on Tuesday 22 January 2019. Below is the council's own wording, with the papers it was decided on.

Item57

Resolved

View the decision text for item 57.
Word for word from the decision Brighton and Hove published for this meeting. Source: democracy.brighton-hove.gov.uk

Follow this further

Built from Brighton and Hove's papers

What the report saysPro

Report to Environment, Transport & Sustainability Committee

Background

1.1From August to October 2018, a communal recycling bin trial took place in the Montpelier area of the city. The purpose of the trial was to identify potential solutions to reducing the high levels of contamination found in communal recycling rounds. Cityclean also took the opportunity to better understand how recycling can be made easier for residents and how recycling information can be presented in the most effective way.

1.2The trial involved installing 29 green Dry Mixed Recycling (DMR) bins and seven red glass recycling bins, replacing the black containers. All bins were kept the same size and in the same locations. The bins served 1,761 properties and approximately 12% of the CM3 communal round.

1.3Before the trial began, an information leaflet was sent to all properties on the roads affected by the trial. This detailed the purpose of the trial, pictures of the trial bins, the items that can be placed in each of the recycling bins, and how residents can provide feedback on the trial. An online feedback form was created for residents to share their feedback and #MakingRecyclingEasier was supplied for people to use social media to provide feedback.

1.4Arrangements were made to sample the recycling from the trial area once a week. Weekly reports were provided by Veolia showing the recycling quality from the sample. Cityclean used a separate vehicle to ensure the contents were not mixed with the regular bins from the remaining CM3 round.

2. Trial findings

2.1The results from the trial sampling are:

Average Samples Number of Period Location contamination containing >10% samples (%) contamination October 2017 CM3 26 18.5% 23/26 (89%) to July 2018 CM3: no change to 1 August to 6 14 18.1% 12/14 (86%) bins November CM3: trial bin area 14 13.3% 10/14 (71%) 2018 CM3: all bins 28 15.7% 22/28 (79%)

2.2Following analysis with East Sussex County Council (ESCC), the following conclusions have been drawn: o The trial bins show a lower input contamination rate (13.3%) compared to pre-trial (18.5%) and bins in the CM3 round that remained unchanged (18.1%) o This improvement of 5.2 percentage points equates to a 28% reduction in contaminated tonnage in the trial bins o The sampling results from the bins that remained unchanged in the CM3 area is only marginally better than before. This supports the view the improvement in CM3 is not simply a reflection of the background trend.

97 o Cityclean and ESCC were surprised at the frequency of exceptionally contaminated bins – the highest was 44% on 23 October (existing design of bin); the highest for the trial bins was 26% on 14 September. This contamination may be due to residents leaving bags of general waste, unwanted household items and fly-tipping in the recycling containers. In some cases, residents were able to unlock to bins to deposit bags and large items, bypassing the aperture

2.3The graph below shows the quality of the material during the trial. In weeks 2, 10, 12 and 13 contamination levels were less than 10%, with 93.8% the highest quality in week 2.

90 Material quality (%)

80 Quality % (sample)

75 Linear (Quality % (sample))

60 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Trial week

2.4As the trial progressed, some changes were made based on feedback from residents and crews. This included: o Placing “no glass” stickers on all the green DMR bins; this however, did not lead to an improvement in reducing the contamination of glass in the mixed recycling bins (week 6) o Replacing triangle locks to padlocks with provide extra security and reduce the likelihood of contaminated rubbish being placed in recycling bins (week 8) o Removing the brushes from the DMR bins; this did lead to an increase in recycling quality and an increase in the weight of recyclable material in the bins (week 12)

3. Feedback

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
City Environment Modernisation Update APX. n 1Report 272 KB DownloadRead as text
PDF
City Environment Modernisation Update APX. n 2Report 312 KB Download
PDF
City Environment Modernisation UpdateReport 268 KB Download
PDF
Item 57 OffamendReport 84 KB Download
PDF
View as HTML (57./2) 24 KBReport 24 KB Download
PDF
View as HTML (57./3) 26 KBReport 26 KB Download
PDF
View as HTML (57./4) 24 KBReport 24 KB Download
PDF
View item 57. as HTML 37 KBReport 37 KB Download

At this meeting

Whole meeting

On this subject at Brighton and Hove

Search all
  1. City Environment Modernisation UpdateThis decision
  2. City Environment Improvement Programme UpdateDecided
  3. Constitutional Matters: City Environment, South Downs & The Sea CommitteeDecided
  4. City Environment Improvement Programme UpdateDecided
  5. City Environment Improvement Programme UpdateDecided
  6. City Environment Modernisation UpdateDecided

More from Brighton and Hove Environment, Transport & Sustainability Committee

All decisions
MeetingDecisionOutcome
14 Mar 2023 Official Feed and Food Controls Service Delivery Plan 1 April 2023 - 31 March 2024View the decision text for item 86. Decided Open
14 Mar 2023 Public Toilet UpdateView the decision text for item 87. Decided Open
14 Mar 2023 City Environment Improvement Programme UpdateView the decision text for item 88. Decided Open
14 Mar 2023 Local Transport Plan 2023/24 Capital ProgrammeView the decision text for item 89. Decided Open
14 Mar 2023 Mini Holland feasibility study - Wish & WestbourneView the decision text for item 90. Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies