Resolved
View the decision text for item 10.
Greater Brighton Economic Board decided this item on Tuesday 20 July 2021. Below is the council's own wording, with the papers it was decided on.
Resolved
View the decision text for item 10.
2.1That the Board note the report and the Investment Programme Update at Appendix 1.
3. CONTEXT/BACKGROUND INFORMATION
LGF Growth Deal Rounds 1 & 2
3.1A total of approximately £90m was allocated to projects across the City Region from LGF Growth Deal rounds 1 & 2. These projects will deliver a total investment of approximately £376m into the City Region, unlocking an estimated 14,000 jobs, 8,200 homes and 450,000m2 of employment floor-space. Current active projects are listed below with a summary of progress since the last update.
3.1.1 Flood Alleviation Scheme (Newhaven) £7.5m
Works are now complete. A final rail possession took place on 20 June 2021, with works including installation and testing of new power cables and signalling
55 tests to ensure the rail flood barrier is fully functional. A trial barrier deployment is scheduled for November to ensure no outstanding issues. Minor snagging work is now being planned.
3.1.2 Port Access Road (Newhaven) £10.0m
Construction commenced early January 2019, with practical completion now achieved. The next phase of development will be the construction of two short link roads to provide access to different areas of Newhaven Port. This work has now started but is being funded through private sector match, not through the Investment Programme.
3.1.3 New England House Growth Centre (Brighton) - £4.9m
Design work continues to be on hold to allow for completion of all necessary survey work. Design work should recommence in September 2021 when this work has been completed. A report has been received concerning the advised specification for the replacement façade. This will form the basis for façade designs.
3.1.4 Digital Catapult & 5G Testbed (Brighton) - £1.8m The primary focus of activity for the last period and will be for the rest of 2021 is the 5G Festival - the DCMS-supported, Digital Catapult-led programme with the music industry, whose regional partners are Brighton Dome & Festival and Wired Sussex. The world’s first 5G-powered music festival is due to take place in March 2022. It will bring together virtually music venues in different cities including Brighton. Work is underway on the technical development of various aspects of the project including distributed live and as-live music concerts, virtual versions of music venues, and enhanced fan experiences. A series of workshops for the regional music industry will run alongside these technology programmes. Aligned with that project is the Research and Innovation Fibre Ring (RIFR), which enables us to integrate Brighton Digital Exchange into the 5G Festival activity, and potentially connect up performance venues in the city.
3.1.5 Circus Street Innovation Centre & Regeneration (Brighton) - £2.7m
There has been no further update since last meeting and the last position is as follows:
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Greater Brighton Investment ProgrammeReport | 353 KB | DownloadRead as text |
PDF |
Greater Brighton Investment Programme Report APX. n 1Report | 2 MB | Download |
PDF |
View item 10. as HTML 53 KBReport | 53 KB | Copy on its way |
Follow Greater Brighton Economic Board at Brighton and Hove and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 2 Apr 2025 | Sussex Energy UpdateView the decision text for item 20. | Decided | Open |
| 2 Apr 2025 | Greater Brighton Operational Arrangements 2025/26View the decision text for item 21. | Decided | Open |
| 2 Apr 2025 | Strategic Workplan 2025/26View the decision text for item 22. | Decided | Open |
| 16 Oct 2024 | Sussex Energy UpdateView the decision text for item 9. | Decided | Open |
| 16 Oct 2024 | Admission of New Member to the BoardView the decision text for item 10. | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.