CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Brighton and Hove City Council

Local Approval of Final Version of Environment Agency Flood Risk Management Plan Cycle 2 (2021-2027)

Decided Committee 5 papers

Environment, Transport & Sustainability Committee decided this item on Tuesday 21 June 2022. Below is the council's own wording, with the papers it was decided on.

Item12

Resolved

View the decision text for item 12.
Word for word from the decision Brighton and Hove published for this meeting. Source: democracy.brighton-hove.gov.uk

Follow this further

Built from Brighton and Hove's papers

What the report saysPro

Report to Environment, Transport & Sustainability Committee

This field is automatically This field is automatically Automatic generated. generated. Required Required Required Required Required Required Optional

Measure Validation Measure ID Measure Label Measure Author Approver Category Type of work Timetable Responsible authority Other responsible authorities

Update the Local Flood Risk Management Strategy in Brighton and Hove (B) - OK 0205907002 Brighton and Hove 059 PSO East Sussex Proposed Prevention 2021 to 2022 Brighton and Hove City Council

Update the Surface Water Management Plan in Brighton Brighton and Hove (B) - OK 0205907003 and Hove 059 PSO East Sussex Proposed Prevention 2021 to 2022 Brighton and Hove City Council

Conduct a City Wide Property Flood Resilience Scheme in Brighton and Hove (B) - OK 0205907004 Brighton and Hove 059 PSO East Sussex Proposed Protection 2026 Brighton and Hove City Council Environment Agency Produce a written protocol to respond to reports of flooding and investigate flood events in Brighton and Hove (B) - OK 0205907005 Brighton and Hove 059 PSO East Sussex Proposed Recovery and Review 2022 Brighton and Hove City Council Implement a surface water management scheme, 205

incorporating principles of sustainable drainage or wider catchment solutions as appropriate, in the Preston Park Brighton and Hove (B) - Southern Water and the Environment OK 0205907006 area 059 PSO East Sussex Proposed Protection 2024 Brighton and Hove City Council Agency

Complete a groundwater and telemetry study in Brighton and Brighton and Hove (B) - OK 205907007 Hove 059 PSO East Sussex Transitional Preparedness 2023 Brighton and Hove City Council Required if measure scale set Required if measure scale set Required if measure scale set to to Flood Risk Area, otherwise to Strategic Area, otherwise Management Catchment, Required Required Required optional optional otherwise optional Required Required

Water Framework Directive River Basin Measure description Measure location Measure scale Flood Risk Area Strategic Area Management Catchment District Measure outcome

update the Local Flood Risk Management City of Brighton and Hove, Strategy Brighton and Hove Flood Risk Area South East (RoFSW) South East - 07 manage flood risk

City of Brighton and Hove, identify and address flood risk from surface update the Surface Water Management Plan Brighton and Hove Flood Risk Area South East (RoFSW) South East - 07 water

conduct a City Wide Property Flood Resilience City of Brighton and Hove, increase resilience of properties to surface water Scheme Brighton and Hove Flood Risk Area South East (RoFSW) South East - 07 flooding

produce a written protocol to respond to be able to respond in a timely manner to any reports of flooding and investigate flood City of Brighton and Hove, flood reports, and have a structured process for events Brighton and Hove Flood Risk Area South East (RoFSW) South East - 07 investigating flood events 206

implement a surface water management scheme, incorporating principles of sustainable drainage or wider catchment City of Brighton and Hove, solutions as appropriate, the Preston Park area Flood Risk Area South East (RoFSW) South East - 07 protect properties and infrastructure

investigate the requirement for further telemetry City of Brighton and Hove, in order to improve flood investigation and complete a groundwater and telemetry study Brighton and Hove Flood Risk Area South East (RoFSW) South East - 07 warning This field is automatically generated and cannot be edited directly. Required Optional Optional Required Required

Detailed spatial Statutory or non- Measure element Plan owner name Plan name statutory Type

Between 2021 and 2022, Brighton and Hove City Council will update the Local Flood Risk Management Strategy in Brighton and Hove to Brighton and Hove City Council Local manage flood risk in the City of Brighton and Hove, South East Flood Risk Area. No Brighton and Hove City Council Flood Risk Management Strategy Statutory FRMP Individual

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Local Approval of Final Version of Environment Agency Flood Risk Management Plan Cycle 2 (2021-2027) APX. n 1Report 727 KB DownloadRead as text
PDF
Local Approval of Final Version of Environment Agency Flood Risk Management Plan Cycle 2 (2021-2027) APX. n 2Report 159 KB Download
PDF
Local Approval of Final Version of Environment Agency Flood Risk Management Plan Cycle 2 (2021-2027) APX. n 3Report 54 KB Download
PDF
Local Approval of Final Version of Environment Agency Flood Risk Management Plan Cycle 2 (2021-2027)Report 238 KB Download
PDF
View item 12. as HTML 51 KBReport 51 KB Copy on its way

At this meeting

Whole meeting

On this subject at Brighton and Hove

Search all
  1. Local Approval of Final Version of Environment Agency Flood Risk Management Plan Cycle 2 (2021-2027)This decision
  2. Local Approval of B&HCC Input to Environment Agency Flood Risk Management Plan Cycle 2 (2021-2027)Decided
  3. Local Cycling and Walking Infrastructure Plan (LCWIP) - approval of scoping reportDecided

More from Brighton and Hove Environment, Transport & Sustainability Committee

All decisions
MeetingDecisionOutcome
14 Mar 2023 Official Feed and Food Controls Service Delivery Plan 1 April 2023 - 31 March 2024View the decision text for item 86. Decided Open
14 Mar 2023 Public Toilet UpdateView the decision text for item 87. Decided Open
14 Mar 2023 City Environment Improvement Programme UpdateView the decision text for item 88. Decided Open
14 Mar 2023 Local Transport Plan 2023/24 Capital ProgrammeView the decision text for item 89. Decided Open
14 Mar 2023 Mini Holland feasibility study - Wish & WestbourneView the decision text for item 90. Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies