RESOLVED that PERMISSION BE GRANTED as recommended, subject to the conditions set out in the report of the Chief Planner with Condition 4 being amended to read:- “4 The materials to be used for the external surfaces of the building shall be as set out in the planning application forms and/or drawings unless otherwise agreed in writing by the Local Planning Authority.” REASON: In order to comply with Policy BE1 of the Unitary Development Plan and in the interest of the appearance of the building and the visual amenities of the area. A further condition concerning slab levels was also added to read:- “11 Details of the proposed slab levels of the building(s) and the existing site levels shall be submitted to and approved in writing by the Local Planning Authority before work commences and the development shall be completed strictly in accordance with the approved levels. REASON: In order to comply with Policy BE1 of the Unitary Development Plan and in the interest of the visual and residential amenities of the area.
Word for word from the decision Bromley published for this meeting.Source: cds.bromley.gov.uk
Development Control Committee (DC) on 25th May 2010
REPORT OF THE CHIEF PLANNER
Application No : 10/00844/FULL1 Ward: Chelsfield And Pratts Bottom
Address : The Highway Primary School The Highway Orpington BR6 9DJ
OS Grid Ref: E: 547078 N: 164431
Applicant : The Highway Primary School Objections : NO
Description of Development:
Demolition of north-east and south-west wings of school and alterations to central block. 2 single storey extensions to provide replacement classrooms and children and family centre (including replacement nursery) with hard play area and 18 car parking spaces
Proposal
Planning permission is sought for the following development:
the demolition of the existing western classroom wing and construction of a new replacement classroom wing to the rear of the existing block the demolition of the existing eastern wing and replacement building to provide a new children and family centre and 30 place pre-school nursery demolition of existing temporary nursery building (but retain existing independent Mother and Toddler building) to the north of the site single storey extension including improved entrance at the front of the retained central block 8 car parking spaces with vehicular access from The Highway enlargement of existing hard play area.
The location of vehicular access to The Highway will not be altered. At present it also provides a pedestrian access to the school. It is proposed to provide a separate pedestrian access adjacent to the vehicular access, and a new pedestrian access point for the children and family centre and nursery. The existing pedestrian access from the public footpath on the south-west boundary will be relocated to the north- west and will be from the footway of Arundel Drive.
The development work is proposed in two phases sey out in the Design and Access Statements.
The following supporting documents have been provided in addition to the submitted plans:
Energy Statement Sustainability Statement BREEAM pre-assessment Arboricultural Implications Assessment and Arboricultural Method Statement Tree Survey Report Phase One Environmental Review Asset Location Search (Thames Water) Ground Appraisal Report Design and Access Statement Archaeology Report
The Design and Access Statement sets out the key objectives of the scheme, as follows - addressing major deficiencies within the existing premises by providing facilities which are well-designed, built, operated and maintained to comply with current statutory requirements, in order to deliver the National Curriculum; championing sustainability; to provide a building that is well serviced and robust; to provide an attractive environment for teaching and learning; to provide a modern building base.
Location
The application site is located on the north-western side of The Highway. The main school buildings are on the south–east side of the site and the temporary nursery and Mother and Toddler Club are on the rear/northern part of the site, which has a pedestrian access to Eton Road. As described above, the main school forms three distinct sections with classrooms wings either side of the central block which comprises the main hall, dining hall and offices. Part of the south-west boundary is with footway of Arundel Drive, the remainder is with a public footpath linking to The Highway.
Comments from Local Residents
At the time of writing this report no local objections had been received.
Comments from Consultees Highways- no objections are raised in principle to the application but details are required of the construction management plan.
Metropolitan Police- no objections raised.
Drainage- the site is located within the Environment Agency’s Source Protection Zones 1 or 2 and it is proposed to drain to soakaways. The Environment Agency were consulted but have assessed the application as low environmental risk and have not commented further.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.